STIPULATION AGAINST LIENS
Michael D. Lehman and Deidra A.
Foore,
Owner
IN THE COURT OF COMMON PLEAS
Cumberland COUNTY,
PENNSYLVANIA
v.
Carlson Construction, Inc.,
NO. 07 - ~(oSq MLD
Contractor
WHEREAS, Michael D. Lehman and Deidra A. Foore of 204 Alanthia Lane, Etters, PA
17319, is about to execute contemporaneously herewith, a contract, with Carlson
Construction, Inc. of 1208 Summit Way, Mechanicsburg, PA, for the erection of a building
upon premises commonly known as 1271 Skyview Court, Township Hampden, Cumberland
County, Pennsylvania, as set forth in the deed dated 07/09/03, recorded at Deed Book 258,
Page 224 (part of), in the Recorder's Office for Cumberland County, Pennsylvania, as more
specifically described in Exhibit "A" which is incorporated herein and attached hereto.
NOW, August 3, 2007, at the time of and immediately before the execution of the principal
contract, and before any authority has been given by the said Owner to the said Contractor
to commence work on the said building, or purchase materials for the same in consideration
of the making of the said contract with Contractor and the further considerafion of One
Dollar ($1.00), to contractor paid by Owner, it is agreed that no lien shall be filed against the
building by the Contractor, or any subcontractor, nor by any of the materialmen or workmen
or any other person for any labor, or materials purchased, or extra labor or materials
purchased for the erection of said building, the right to file such liens being expressly
waived.
WITNESS, our hands and seals the day and year aforesaid.
SIGNED AND SEALED IN THE PRESENCE OF:
i
TRACTOR: CARL ON STRUCTION, INC.
I
J ~-
OWNER:
By: Geo~ge M. A. Carlson, Pr(~fsident
EXHIBIT "A"
ALL THAT CERTAIN tract of land situated in Hampden Township, Cumberland County,
Pennsylvania, more particularly bounded and described as follows:
BEGINNING at a point along the western right-of--way line of Skyview Court, said point being
the southeast corner of Lot 44, as shown on "Final Subdivision Plan for Hampden Summit - Phase2";
thence, South 70 degrees 17 minutes 51 seconds West a distance of 202.40 feet to a point; thence, North
16 degrees 32 minutes 28 seconds West a distance of 110.17 feet to a point; thence, North 70 degrees
17 minutes 51 seconds East a distance of 161.47 feet to a point on the western right-of--way line of
Skyview Court; thence along said right-of--way line, South 37 degrees 45 minutes 41 seconds East a
distance of 95.73 feet to a point; thence along said right-of--way line on a curve to the right having a radius
of 200.00 feet, an arc length of 19.69 feet and a chord bearing of South 34 degrees 56 minutes 28 seconds
East a distance of 19.68 feet to the point and place of BEGINNING.
BEING Lot #44 Plan of Hampden Summit, Phase 2, recorded in Plan Book 89, Page 83
UNDER AND SUBJECT, NEVERTHELESS, to all easements, restrictions, encumbrances and
other matters of record or that which a physical inspection or survey of the premises would reveal.