Loading...
HomeMy WebLinkAbout08-6910KEYSTONE CONTRACTING, INC., Claimant, V. ELBERT, L.P., Owner IN THE COURT OF COMMON PLEAS, CUMBERLAND COUNTY, PENNSYLVANIA NO. O9 -10410 9LD : MECHANICS' LIEN CLAIM MECHANICS' LIEN CLAIM AND NOW, comes Claimant, Keystone Contracting, Inc., by and through its attorneys, Wix, Wenger & Weidner, and files this Mechanics' Lien Claim, stating as follows: 1. Claimant, Keystone Contracting, Inc., is a Pennsylvania corporation, which maintains its principal place of business at 51 Cove Road, Duncannon, PA 17020. 2. Claimant files this Mechanics' Lien Claim as a subcontractor. 3. The owner of the property subject to this lien is Elbert, L.P., a Pennsylvania limited partnership, which maintains its primary place of business at 7 Whispering Pines Lane, Carlisle, PA 17015 ("Owner'). 4. The date on which Claimant last performed work was May 27, 2008. Claimant did not complete all work on the property because Claimant was not paid the amount owed for its work despite Claimant's demands; and, Claimant was not provided with adequate assurance that it would be paid for the work performed. 5. Claimant provided formal notice of its intention to file a Mechanics' Lien Claim on August 11, 2008, via first class and certified mail. A copy of the notice is 1 attached hereto as Exhibit "A" and incorporated herein by reference as though fully set forth. 6. Claimant files this claim under a written contract with Varish Construction, Inc. (the "Contractor'), which served as contractor to Constantinos and Elaine Mallios, prior owners of the property subject to this lien, dated August 8, 2007 (the "Contract") wherein Claimant agreed to furnish the labor and materials necessary for the excavation, erosion control, sewer installation, storm sewer installation, grading, water line installation, curbing and paving, in connection with the improvement of the properties claimed to be subject to this lien, to prepare them for the erection and construction of residential homes, streets, and stormwater management. A copy of the Contract is attached hereto as Exhibit "B" and incorporated herein by reference as though fully set forth. 7. Contractor and Claimant agreed that Claimant would provide the labor and materials necessary to perform the work listed in the Contract. Contractor and Claimant agreed that the work would be performed at a flat rate, as shown in the Contract. 8. In addition, Contractor and Claimant agreed that Claimant would provide clearing work (digging out tree stumps, hauling tree stumps, burying tree stumps, and removal of trees) at an hourly rate for the machine and operator. 9. Pursuant to the Contract and subsequent agreement of the parties, Claimant performed the work as set forth on Exhibit "C," which is incorporated herein by reference as though set forth in full. 2 10. Claimant sent periodic invoices to Contractor for the portion of the work performed by the date of the invoice. The total amount billed for the work performed is $1,033,732.36. The total amount paid is $822,110.17. 11. The amount owed for the work performed is $211,622.19. The amount of this claim, after apportioning the total debt among the varying improvements, is $5,760.63. 12. The improvements and property claimed to be subject to the lien is situate in the Township of South Middleton Township, Cumberland County, Commonwealth of Pennsylvania, shown as Lot 120 on a Final Subdivision Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, and which has tax parcel number 40-12-0340-103. Respectfully Submitted, Date: ' \(7'0/05 WIX, WENG1?13XA,-IV)TIDNER By: Jeff rk, I. D. # 89277 50 rteond Street P.O. ox 845c Harrisburg, PA 17108-845 (717) 234-4182 Attorneys for Claimant 3 VERIFICATION I have reads the foregoing Mechanics' Lien Claim and hereby affirm and verify that, to the best of my knowledge, information and belief, all of the statements made therein are true and correct, and I acknowledge that false statements made therein may subject me to the penalties of 18 Pa.C.S. § 4904, relating to unsworn falsification to authorities. KEYSTONE CONT TING, INC. Date: (I f V By: Deborah Frisch, President EXHIBIT "A" RICHARD H. WIX DEAN A. WEIDNER STEVEN C. WILDS THERESA L. SHADE WIX' DAVID R. GETZ STEPHEN J. DZURANIN JEFFREY C. CLARK PETER G. HOWLAND Also ManEm Massachusaus Bar (717) 234-4182 FAX (717) 234-4224 www.wwwpalaw.com THOMAS L. WENGER ROBERT c. SPITZER OF Counsel Suburban Office: 4705 DUKE STREET HARRISBURG, PA 17109-3041 (717) 652-8455 August 11, 2008 Elbert, L.P. 7 Whispering Pines Lane Carlisle, PA 17015 Via Certified and First Class Mail RE: Keystone Contracting, Inc. Formal Notice of.lntent to File Mechanics' Lien Phases 5, 6, and. 7 of Westgate Development, Cumberland County, Pennsylvania Our File No.: 4920-15040 To Whom It May Concern: This firm represents Keystone Contracting, Inc. ("Keystone"). This is Keystone's formal notice of its intention to file a Mechanics' Lien against your properties owned by you, which are more particularly described on Exhibit "A', attached hereto, for its work in connection with the improvement of the properties to prepare them for the erection and construction of homes. This notice is being served by Keystone as a subcontractor to Varish Construction, Inc., contractor to Constantinos J. Mallios and Elaine Mallios, prior owners of the properties. Keystone provided the excavation, erosion control, sewer installation, storm sewer installation, grading, water line installation, curbing and paving. Keystone completed its work on the project on May 27, 2008. Unless the amount of $211,622.19, ? Lie to secure payment for is work on the promptly paid, Keystone will file a Mechanics properties. Sincerely, Wix, Weer &Feidner By: WIX, WENGER & WEIDNER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW 508 NORTH SECOND STREET POST OFFICE BOX 845 HARRISBURG, PENNSYLVANIA 17108-0845 JCC/hjob cc: Keystone Contracting, Inc. Exhibit A The following lots or tracts of land situate in the Township of South Middleton Township, Cumberland County, Commonwealth of Pennsylvania, shown on a Final Subdivision Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, as follows: Lot 120 -Tax Parcel No. 40-12-0340-103 Lot 121 -Tax Parcel No. 40-12-0340-102 Lot 122 - Tax Parcel No. 40-12-0340-101 Lot 124 -Tax Parcel No. 40-12-0340-099 Lot 125 -Tax Parcel No. 40-12-0340-091 Lot 126 -Tax Parcel No. 40-12-0340-097 Lot 127 -Tax Parcel No. 40-12-0340-096 Lot 128 -Tax Parcel No. 40-12-0340-095 Lot 129 -Tax Parcel No. 40-12-0340-094 ¦ Complete fterns 1, 2, and 3. Also complete Item 4 if ResrIcted Delivery Is desired. ¦ Print your name and address on the reverse so that we can Tatum the card to you. ¦ Attach this cardto the back of the mailpiece, or on the front if space permits. 1. Artpde Addressed to: h - Pf-(,T w 15P C- MYS laftz" Sign u A. 13 X Agent ? Addressee B. RricNt ? (Mnt ? Narr?e) C. Date of Delivery g , ?g D. Is deNvery address dne* from Item 17 ? Yes tf YES, enter delivery address below: ? No / 3. Servigo Type Carbk , ? ! ?a1 Mail E3 ExWess Mail O Registered ChUturn Receipt for Merchencilm 0 Insured Md ? C.O.D. 4. Restricted Delivery? Aft Fee) M Yes i. ArUde m (transfer rrom m service kbo 7003 1680 0006 5640 7454 Ps Form 3811, February 2004 Dommdo Retum Receipt 102595.02401.1640 -r 0 Ln r% - E Ln Postage $ `a O Certified Fee P C3 Return Redept Fee Here (Endorsement Required) O Restricted Delivery Fee cO (Endorsement RequhvO ..D r-l $ Total Postage 8 Fees M C3 ent To r`- - -..... - - ----- -- -- --- -- - sheetr ]A , C ? or PO Box No. / (?( J ?? o X V y '---- - Cary. Stets. G -- /?U/ EXHIBIT "B" PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 .(717)834-9900 Proposal S To: Varish Construction, Inc. FJobb one: 717-334-7173 Dente 08/41/07 Straw 800 Bullfivg Road Name: • State & Zip Code: Gdl)mbIM PA 17325 Location AW-11irort. Date ofPlans: Sob Phone: we hereby submit specifications and estimated for. Westgate EROSION CONTROL $ 4,500.00 3 Construction Entrances $ 1,000.00 1 Outlet Basin $ 850.00 1 Endwall $ 14.00 28 FT of 24 IN CMP $' 1,021.00 1 Skimmer $ 10,260.00 22800 SF (crass Lines Swales $ 3,000.00 Temporary Seed and Mulch BULK EXCAVATION $ 95,17725 Strip 42301 CY of Topsoil $309,997.80 105084 CY Bulk Cnading Place lo 5084 CY and Compact Fill $73,558.80 Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of 00 Cee4s Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a wor inanlWe Me== according to 9t mdard Authorized practices. Any aIter&bon or deviation from above Sigoatm: specifications mvolvl#g extra costs will be e:eorted only upon . written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our controL Owner to =LTY fire, tornado, \ and other necessary insurance. our workers are fully covered by Workmen's Coon a Liability Note: This proposal maybe vvithdesv?pt by us if not accepted within a days Aooep0m of propoad - The above prices, specificanom and coudgwris are satisfactory and are hereby aw*trA Yea are Si tIIe: aatbonwd to do the work as specdW& Payment will be made as outlined above. 1 i Date of Acceptance: q / W 0 7 8ignatttre Street~ PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 7I 8.34-9900 led To: Varbh Caostzim Inc. Phcme: 717-334-7173 800 B Road Job Name- Westgate G.OnjItUa PA 17325 Job Location Code: Date of Plans: Job Phone: We hereby submit specifications and es Mobilization SANITARY SEWER 3422 FT of 8 IN SDR 0-10 w/bedding 525 Ft of 8 IN SDR 10-12 w/bedding 140 FT of 8 IN SDR 12-14 w/bedding 2305 Ff of 6 IN SDR Lateral 0-10 351 FT of 6 IN SDR Laterals 10-12 72 FT of 6 x 6 IN Wye Connections 169 Manholes 19 Flow Channels 1 Tie Into Existing Manhole 1 Stub and Plug Manhole Westgate Date 08/0 $ 8,000.00 $ 73,846.76 $ 12,080.25 $ 3,956.40 $ 38,009.45 $ 6,233.76 $ 2,880.00 $ 27,040.00 $ 2,565.00 $ 998.38 $ 1,000.00 We Propose hereby to furnish material and labor - complete in acxordance with above specific bons, for the sum of Dollars and 06 Ceats Payment to be made as follows: All material is .guaranteed to be as specifie:charge T completed in a wwWamlike manner accAuthorized practices. Any alteration or deviaSide: specifications involving extra costs will be written orders, and will become an extrd above tine estimate. All agreements conti' accidents or delays beyond our control. Owner to , tornado, \ and other necessary insurance. Our we fully covered by Workmen's Compensation and Note: 't'his proper may be withdrawn by us if not accepted Acoepao w of Proposal - The above Prices, sPecuuanom mu condhioos ace sunbc my end ace hereby wceptc& You a She. andwrized to do the work as spexd'ied. P"ment 'I made as outlined above. Date of Acceptance: ?f C71 Suture: days PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duneannon, PA 17020 71 834-9900 Submitted To: Vatish BuUftR Ccarstructio4 Inc. Phone: 717-334-7173 Date 800 Road Job Name: W Stroet: & Zip Code: PA 17325 Job Location Architect: Date o€Plaor. Job Phone: We hereby submit specifications and estimated for Westgate 72 Test Tees 2 Test Per Temp Specs MRM SEWER 3914 Fr of I8 IN SUP 266 FT of 24 IN SUP 0-6 32 FT of 24 IN SUP 6-8 . 172 FI• of 30 IN SUP 14 M oholes 245 Inlets 43 Flow Channels 43 Inlet Protection Remove I Inlet $ 2,880.00 $ 3,000.00 $ 83,36820 $ 7,049.00 $ 896.00 $ 5,73620 $ 2,I00.00 $ 36,750.00 $ 3,655.00 $ 4,300.00 $ 500.00 We Pmpose hereby to furnish materiel and tabor - complete m accordance with above specifications, for the sum of Dollars and, 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed m a workmanlike manner according to standard Authonzed practices. Any alteration or deviation from above & : specifications involving - v, costs will be executed only upon written orders, and will become an cadre charge over and above the estimame All agreements eoamagent upou strikes, accidents or delays beyond our control. Owner to carry fire, tornado, \ and other necessary insurance. Our workers are tartly covered by Workmen's Compensation and Liability Note: This proposal may be withdrawn by us if not accepted within 30 days Aeeeeplwee of pnepeeeeal - The above Mms, specm- - cw&goeg are setista *my and are hereby acmpft . You are mthorraed to do the work as specdod. Payment be as Sly' oudiaed about. c/ Date of Acceptance: d d Ste: We hereby sub ,jj3Endwall R-4 Rock and for. Westgate CULVERT WESTGATE DRIVE 90 FT OF 103 X 811N CUP 2 Headwall and Endwall CULVERT PARKWAY DRIVE 180 FT of 59 x 91 IN CHIP 2 Headwall and Endwall WATERLINE F6E ENINPVC Main ate Valves MJ Gate Valves We Propose hereby to furnish - complete in accordance with Dollars and 00 $ 2,550.00 $ 1,625.00 $ 11,911.60 $ 9,990.00 $ 19,141.20 $ 15,720.00 $117,262.50 $ 6;660:00 $ 2,820.00 specifications, for The sum of Payment to be made as follows: All material is gum to be as specified. All work to be completed in a worlmnanMm manner acxoc*og to standard Authorized practices. Any alteration or deviation from above gib; specifications involving extra costs will be owcuted only upon written orders, and will become an extra charge over and above the estimate. All agrammts contingent upon strikes, accidents or decays beyond c nr controL Owner to carry fire, tornado, \ and other necessary insurance. our workers are fiil}y covered by Workmen's Compensation and Liability Note: This proposal may be withdrawn by us if not accepted within .days A,,cga tee of PvPmd - The above prieas, sPecdc ions and o aftons we assidw=ry and are bmby accepted. You r 3ignahue: a thmued to do the work as specified. Payment outlined above. Date o€ Acceptance: ? i o Signattn e: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 834-9900 To: Vssish consduction, Inc. Phone: 717-3347173 Date Job Name: W E 900 Bullfrog Road FA 17325 Job Location Job Phone: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncarmon, PA 17020 71 834-9900 Submitted To: Vatish ConsbuctkE, Inc. Phone: 717-3347173 8o0 Bulkfro Road Job Name: 3trert: Job Location city, State & Zip Code; qq!EsPA 17325 A.,. U.r,+- Die of Plans: Job Phone. We hereby submit specifcIftons and estimated for., Westgate 412x12NUTee 6 12 x 6 Hydrant Tee 13 12 IN Bends 6 Fire Hydrant 4 Tie Into existing 12 Valve Boxes 13 Thrust Blocking 2 Testing WATER SERVICE 43'/+ IN Short service 33 FT % IN Long service We Propose hereby to famish material and labor - complete in accordance with above DoUrs and 00 Cents Date 08/01/07 $ 1,200.00 $ 1,920.00 $ 1,755.00 $ 14,400.00 S 1,200.00 $ 3,250.00 $ 1,900.00 $ 20,425.00 S 19,800.00 sum of Payment to be made as follows: All material is guaraed to be as specified. All work to be completed in a worllce awner according to standard Authorized practices. Any alteration or deviation from above gib: specaficwions involving extra costs will be executed only upon written orders, and will become an extra charge over and above the eornate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, \ and otters necessary insurance. Our workers are fully covered by Workmen's Compensation and Liability. Note: This l?? may be withdrawn by us if not 8COeptCd within 30 Insurance. Accep" x Of P - The above Pnees, specificahm and we sdigbAwy and are hereby aoxeptod. You as aumoc>zed tD do rho work as specified. Payment i be $1gnStllrC: outlined above. Date of Acceptance: Signature: r PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove'Road Duncannon,. PA 17020 17171834-9900 Submitted To: Varish Constivction, Inc Phone: 717-3347173 tare utuuirui onn n..Il r- ID. A Job Name: Westgate City, State & Zip code: Lett} Architect: Date We hereby submit specifications and CURBING 8835 SF {rude and Backfill 8835 Ft of Rolled Concrete Garb PAVING 16935 SY Fine Grade 16935 SY of 8 IN Crushed #4 Stone 16935 SY of 2 IN BCBC Paving 16935 SY of 1 IN Wearing Paving for. Westgate TOTAL Propose hereby to furnish material and labor - c mVlete in accordance with Dollars and 00 Job $ 15,461.25 $ 78,189.75 $ 11,007.75 $ 114,311.25 $ 105,504.75 $ 64,691.70 $1,475,000.00 for the sum of- Payment to be made as follows: All material is guamteed to be as specified All work to be completed m a wodananlike manner according to standard Authorized practices. Any alteration or deviation from above Signatusc: specifications involving extra costs will be owcuted only upon written orders, and will become an extra charge over and above the estimate. All agreements contoW nt upon strikes, accidents or decays beyond our control. Owner to carry fire, tornado, \ and other accessary insurance. Our workers are F,,t,, fully covered by Workmen's Compensation and Liability This proposal may be withdrawn by us if not accepted within 30 days Aooq aera of prgmd - The above prices, speeidic 9m and c mddioas an satidfictory and are hereby acwpted. You cae Signature: arihori wd tD do the work as specified. Paymeat vdll be nude as outlined above. Y t Date of Acceptance: I?K Sigmature PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 (717) 834-9900 proposal Subanitbed To: Vanish Construction, Inc- Phone: 717-334-7173 Date 08/01/07 Street g00 Bullfro Road Job Name: -Westgate City, State &Zip ; PA 17325 Job Location e„nt,;trw!t Date of Plans: Job Phone: and estimated for: wa tgate Note: All asphalt gin this proposal will be subject to escalation based on the published Penn Dot Liquid asphalt index price at the time of placement index price as of 07/31/07 is $328.00 a liquid ton. Pipe and other material prices are good for 30 days' Payment to be made within 10 days from date of invoice. All materials stocked onsite are to be paid for due to escalation costs. and testing fees to be done by others. Any soils to be deemed unsuitable will be dealt with on a cubic yard basis. 1]te grading may be altered from original plan due to areas that trees are to remain. Wires and poles to be relocated by others. Day schedule to complete job may altered due to in climate weather. Bulk of clearing and silt fence done by others. Keystone hued at time and material to hush clemr Page 7 of 7 We Propose hereby to furnish material and labor - complete m Payment to be made as follows: Dollars and 00 All materiel is guaranteed to be as specified. All work to be completed in a vmrlmanldce meaner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be exearted only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry -fire, tornado, 1 and other necessary insurance. our workers are My covered by Workmen's Compensation and Liability Authorized Signature: with above specifications, for the sum of Norte: This proposal may be withdrawn by us if not accepted within 30 days AM40wee of lid - The above prices, speciiaahm and croons ere story and are bmby accented. You are udwr=d to do the work as specified. Payment wdl pe ? as Ste. outiinod above. I c Date of Acceptance: Signature: CHANGE ORDER Keystone Contracting, Ina Change Ordff No. 08-01 Project: Westgate Initiation. Date: 06111/08 Project No% Contract For. Westgate Cau tmot Date: The contract is changed as follows: Electrical Excavation $36,520.00 Gas Excavation $32,520.00 Additional Water Line and Valves $ 7,300.00 20 Rolls Straw Matting Erosion Blanket $ 960.00 Grub aad Clear $14,348.75 Total Add $ 91,648.75 Not valid until signed by Varish Construction Inc. $1,475,000.00 The Original Contract Sum $ - 0 - Net Change by FvViouslY authored Change Orden $1,475,000.00 The Total contract Sum prior to this Clmge Order $ 91.648.75 The Contract Sum will be (092EASED) by this Change Order ,566,648.70 The New Contract Sum including this Change Order $1,5 ? The Contract Time will be (mzhmpd) by Varish Comm-notion Inc. Contractor: 800 Bullfrog Road Keystone Contracting, Inc. Gettysburg, PA 17325 Date By late By: EXHIBIT "C" Work Completed: Flat Rate: Erosion Control Installation of three construction $4,500.00 entrances Installation of one outlet basin $1,000.00 Installation of endwall $850.00 Installation of 28 feet of 24 inch CMP $14.00 Installation of skimmer $1,021.00 Temporary seed and mulch $3,000.00 Bulk Excavation Strip 42,301 cubic yards of topsoil $95,177.25 Bulk Grading of 105,084 cubic yards $309,997.80 Place and compact fill -105,084 $73,558.80 cubic yards Mobilization $8,000.00 Sanitary Sewer Installation of 3,422 feet of 8 inch $73,846.76 SDR 0-10 with bedding Installation of 525 feet of 8 inch SDR $12,080.25 10-12 with bedding Installation of 140 feet of 8 inch SDR $3,956.40 12-14 with bedding Installation of 2,305 feet of 6 inch $38,009.45 SDR lateral 0-10 Installation of 351 feet of 6 inch SDR $6,233.76 laterals 10-12 % Completed: Amount Owed: 66.67 $3,000.00 100 $1,000.00 100 $850.00 100 $14.00 100 $1,021.00 50 $1,500.00 97.47 $92,772.51 99.22 $307,593.06 96.73 $71,153.26 69.94 $5,595.27 48.75 $36,000.00 74.92 $9,050.00 48.73 $1,927.86 39.46 $15,000.00 100 $6,233.76 Installation of seventy-two 6 x 6 inch $2,880.00 Wye Connections Installation of 169 vertical feet of $27,040.00 manholes Installation of 19 manhole flow $2,565.00 channels Installation of tie into existing $998.38 manhole Installation of stub and plug manhole $1,000.00 Installation of 72 test tees $2,880.00 Sewer two test per temp specs $3,000.00 Storm Sewer Installation of 3,914 feet of 18 inch $83,368.20 SLPP Installation of 14 vertical feet of $2,100.00 manholes Installation of 45 inlets $36,750.00 Culvert Westgate Drive Installation of 90 feet of 103 x 81 $11,991.60 CMP Installation of one headwall and $9,990.00 one endwall Culvert Parkway Drive Installation of 180 feet of 59 x 81 $19,141.20 inch CMP Installation of one headwall and $15,720.00 one endwall 67.01 $1,930.00 31.8 $8,600.00 100 $2,565.00 100 $998.38 100 $1,000.00 67.01 $1,930.00 67 $2,010.00 47.34 $39,468.90 100 $2,100.00 44.02 $16,176.84 100 $11,991.60 100 $9,990.00 100 $19,141.20 100 $15,720.00 Water line Installation of 4,425 feet of 12 inch PVC main Installation of six 12 inch MJ Gate Valves installation of six 6 inch MJ Gate Valves Installation of four 12 x 12 MJ Tees Installation of six 12 x 6 hydrant tees Installation of thirteen 12 inch bends Installation of six fire hydrants Installation of four ties into existing lines Installation of 12 valve boxes Installation of 13 thrust blocks Water service Installation of forty-two 3/a inch short service Installation of thirty % inch long service Curbing Grading and backfill of 8,825 lineal feet Installation of 8,835 lineal feet of rolled concrete curbing $117,262.50 41.42 $48,684.90 $6,660.00 50 $3,330.00 $2,820.00 50 $1,410.00 $1,200.00 50 $600.00 $1,920.00 50 $960.00 $1,755.00 50 $877.50 $14,400.00 50 $7,200.00 $6,000.00 50 $3,000.00 $1,200.00 50 $600.00 $3,250.00 50 $1,625.00 $20,425.00 30 $6,127.50 $19,800.00 30 $5,940.00 $15,461.25 33.63 $5,200.00 $78,189.75 23.35 $18,256.93 Paving Installation of 16,935 square yards of fine grade installation of 16,935 square yards of 8 inch crushed #4 stone Installation of 16,935 square yards of 3 inch BCBC paving Change order Excavation for installation of 3,043 feet of electrical lines Excavation for installation of 2,710 feet of gas lines Installation of additional water lines and valves Installation of twenty rolls of straw matting erosion blanket Grub and clear Installation of electrical crossing: 506 feet of pipe and stone bedding Installation of gas crossing: 320 feet of pipe and stone bedding Additional clearing work Machine: 963 Cat Loader Cat 953 Loader Dump truck $11,007.75 35.6 $114,311.25 35.6 $170,196.45 35.6 $36,520.00 100 $32,520.00 100 $7,300.00 100 $960.00 100 $14,348.75 100 $7,600.00 100 $4,800.00 100 Hourly Rate: $100.00 $90.00 $65.00 Hours worked: 229.5 44.5 113.75 $3,918.27 $40,689.78 $60,582.34 $36,520.00 $32,520.00 $7,300.00 $960.00 $14,348.75 $7,600.00 $4,800.00 Amount owed: $22,950.00 $4,005.00 $7,393.75 y KEYSTONE CONTRACTING, INC., Claimant, V. ELBERT, L.P., Owner ACCEPTANCE OF SERVICE I, Robert Frey, Esquire, accept service of the Notice of Filing of Mechanics' Lien Claim in the above-captioned matter on behalf of Elbert, L.P. and certify that I am IN THE COURT OF COMMON PLEAS, CUMBERLAND COUNTY, PENNSYLVANIA : NO. 08-6910 MLD MECHANICS' LIEN CLAIM authorized to do so. Date: ?? 2 0 By: Robert Frey, Esquire Frey & Tiley 5 South Hanover Str t Carlisle, PA 17013-3307 Attorney for Owner, Elbert, L.P. { s =t3 l ; i zi