Loading...
HomeMy WebLinkAbout08-6911 KEYSTONE CONTRACTING, INC., Claimant, V. ELBERT, L.P., Owner IN THE COURT OF COMMON PLEAS, CUMBERLAND COUNTY, PENNSYLVANIA NO. D8 - loq 11 M L P : MECHANICS' LIEN CLAIM MECHANICS' LIEN CLAIM AND NOW, comes Claimant, Keystone Contracting, Inc., by and through its attorneys, Wix, Wenger & Weidner, and files this Mechanics' Lien Claim, stating as follows: 1. Claimant, Keystone Contracting, Inc., is a Pennsylvania corporation, which maintains its principal place of business at 51 Cove Road, Duncannon, PA 17020. 2. Claimant files this Mechanics' Lien Claim as a subcontractor. 3. The owner of the property subject to this lien is Elbert, L.P., a Pennsylvania limited partnership, which maintains its primary place of business at 7 Whispering Pines Lane, Carlisle, PA 17015 ("Owner"). 4. The date on which Claimant last performed work was May 27, 2008. Claimant did not complete all work on the property because Claimant was not paid the amount owed for its work despite Claimant's demands; and, Claimant was not provided with adequate assurance that it would be paid for the work performed. 5. Claimant provided formal notice of its intention to file a Mechanics' Lien Claim on August 11, 2008, via first class and certified mail. A copy of the notice is 1 attached hereto as Exhibit "A" and incorporated herein by reference as though fully set forth. 6. Claimant files this claim under a written contract with Varish Construction, Inc. (the "Contractor"), which served as contractor to Constantinos and Elaine Mallios, prior owners of the property subject to this lien, dated August 8, 2007 (the "Contract") wherein Claimant agreed to furnish the labor and materials necessary for the excavation, erosion control, sewer installation, storm sewer installation, grading, water line installation, curbing and paving, in connection with the improvement of the properties claimed to be subject to this lien, to prepare them for the erection and construction of residential homes, streets, and stormwater management. A copy of the Contract is attached hereto as Exhibit "B" and incorporated herein by reference as though fully set forth. 7. Contractor and Claimant agreed that Claimant would provide the labor and materials necessary to perform the work listed in the Contract. Contractor and Claimant agreed that the work would be performed at a flat rate, as shown in the Contract. 8. In addition, Contractor and Claimant agreed that Claimant would provide clearing work (digging out tree stumps, hauling tree stumps, burying tree stumps, and removal of trees) at an hourly rate for the machine and operator. 9. Pursuant to the Contract and subsequent agreement of the parties, Claimant performed the work as set forth on Exhibit "C," which is incorporated herein by reference as though set forth in full. 2 10, Claimant sent periodic invoices to Contractor for the portion of the work performed by the date of the invoice. The total amount billed for the work performed is $1,033,732.36. The total amount paid is $822,110.17. 11. The amount owed for the work performed is $211,622.19. The amount of this claim, after apportioning the total debt among the varying improvements, is $5,760.63. 12. The improvements and property claimed to be subject to the lien is situate in the Township of South Middleton Township, Cumberland County, Commonwealth of Pennsylvania, shown as Lot 121 on a Final Subdivision Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, and which has tax parcel number 40-12-0340-102. Respectfully Submitted, WIX, WENOFV 0 WEIDNER Date: I Z010?5 By: 3 Jeff 'NZXlark, I.D. # 89277 50 rthl Second Street P. ox 845 Harrisburg, PA 17108-845 (717) 234-4182 Attorneys for Claimant VERIFICATION I have reads the foregoing Mechanics' Lien Claim and hereby affirm and verify that, to the best of my knowledge, information and belief, all of the statements made therein are true and correct, and I acknowledge that false statements made therein may subject me to the penalties of 18 Pa.C.S. § 4904, relating to unsworn falsification to authorities. KEYSTONE CONTRACTING, INC. Date: By: Deborah Frisch, President EXHIBIT "A" WIX, WENGER & WEIDNER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW THOMAS L. WENGER SPITZER ROBERT C RICHARD H. W IX R DEAN A. 508 NORTH SECOND STREET . Of Counsel C. WILD STEVEN C C. ' POST OFFICE BOX 845 L. . SHADE WIX THERESA DAVID R. GETZ HARRISBURG, PENNSYLVANIA 17108-0845 STEPHEN J. DZURANIN JEFFREY C. CLARK PETER G. HOWLAND Suburban Office: S Su (717) 234-4182 DUKE STREET 4705 Also Member MaS62thusebe Bar FAX(717)234-4224 HARRISBURG, PA 17109-3041 (717) 652-8455 www.wwwpalaw.com August 11, 2008 Elbert, L.P. Via Certified and First Class Mail 7 Whispering Pines Lane Carlisle, PA 17015 RE: Keystone Contracting, Inc. Formal Notice of Intent to File Mechanics' Lien Phases 5, 6, and 7 of Westgate Development, Cumberland County, Pennsylvania Our File No.: 4920-15040 To Whom It May Concern: This firm represents Keystone Contracting, Inc. ("Keystone"). This is Keystone's formal notice of its intention to file a Mechanics' Lien against your properties owned by you, which are more particularly described on Exhibit 'W', attached hereto, for its work in connection with the improvement of the properties to prepare them for the erection and construction of homes. This notice is being served by Keystone as a subcontractor to Varish Construction, Inc., contractor to Constantinos J. Mallios and Elaine Mallios, prior owners of the properties. Keystone provided the excavation, erosion control, sewer installation, storm sewer installation, grading, water line installation, curbing and paving. Keystone completed its work on the project on May 27, 2008. Unless the amount of $211,622.19, due to Keystone for its work, is promptly paid, Keystone will file a Mechanics' Lien to secure payment for its work on the properties. Sincerely, Wix, Wg4jef &lNeidner By: JCC/hjob cc: Keystone Contracting, Inc. Exhibit A The following lots or tracts of land situate in the Township of South Middleton Township, Cumberland County, Commonwealth of Pennsylvania, shown on a Final Subdivision Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, as follows: Lot 120 -Tax Parcel No. 40-12-0340-103 Lot 121 Tax Parcel No. 40-12-0340-102 Lot 122 -Tax Parcel No. 40-12-0340-101 Lot 124 -Tax Parcel No. 40-12-0340-099 Lot 125 -Tax Parcel No 40-12-0340-091 Lot 126 -Tax Parcel No. 40-12-0340-097 Lot 127 -Tax Parcel No. 40-12-0340-096 Lot 128 -Tax Parcel No. 40-12-0340-095 Lot 129 -Tax Parcel No. 40-12-0340-094 ¦ Complete ftems 1, 2, and 3. Also complete. A. item 4 if Restricted Delhtery Is desired. . 13 Agent x ¦ Print your name and address on the reverse ? Addressee so that we can retum the card to you. ¦ Attach this card to the back of the mailpleoe, g pr} Name) c. Date of Delivery egg or on the front if apace permits. 1. Article Addressed to: D. Is delivery address d from Item 1? ? Yes If YES, enter delivery address below: ? No (its ?aft, e" r7 l -7015- Carf[51e, 3. MerrtUiiedd mall 13 Eoliess, Mail ? Registered Ch%wm Reciso for merchandise ? Insured Mail ? C.O.D. 4. Restricted Delivery? (Extra Fee) M Yes 2. Article Number 7003 1680 0006 5640 7454 Martsfer from service kw PS Form 3811, February 2004 Domestic Return Receipt 10259e.024A.1e40 =- CERTIF INS u'1 ?- • tti For delivery information visit our veosite at www-usps.caril o Ln Postage $ `D G Certified Fee .3 Retum Redept Fee Here resrlc (Endorsement Required) (3 Restricted Delivery Fee cO (Endorsement Required) .0 ?•f r-1 Total Postage & Fees $ M O Sent o M i - - M1 ------------ ----- - ....- or PO Box No. - - --- -- -------- Ctty. State. ZIP+4 ??/ )/ EXHIBIT "B" 1. W? PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 834-900 osal Submitted To. Varish Construction, Inc. Phone: 717-334-7173 800 Bullfrog Road Job Name: westsate Std: PA 17325 Job Location Job Phone: We heretry submit specifications and estimated for: Westgate EROSION CONTROL 3 Construction Entrances I Outlet Basin 1 Endwall 28 FT of 24 IN CMP I Skimmer 22800 SF Grass Lmes Swales Temporary Seed and Mulch giTI, - EXCAVATION ------------- Strip 42301 CY of Topsoil 105084 Cy Bulk Grading Place 105084 Cy and Compact Fill Propose hereby to furnish material and labor - complete in accordance with above and 80 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according tD standard Autlionzed practices. Any alteration or deviation from above Signuare: specifications involvipg cxtm costs will be exearted only upon written orders, and will become an extra charge over and above the estimate. All apuments contingent upon strikes, accident or delays beyond our controL owner to Carry fire, tornado, \ and other necessary insuance. Our workers are fully covered by Workmen's Compensation and Liability Note: This proposal may be Aeaeepaarroa of pn prod - The above prices, specifieaaoas Ina condom are aatory and are hereby accepted: You are Signature: auffimmd tD do the work as specifcd. Payment will be made as outlined above. /- Date of Acceptance: 7 Ste' _ Date 08/01/07 $ 4,500.00 $ 1,000,00 $ 850.00 $' 14.00 $ 1,021.00 $ 10,260.00 $ 3,000.00 $ 95,17725 $309,997.80 $ 73,558.80 for the sum of as if not accepted within 30 days PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 834-900 al Submi#ted To: vanish construction, Inc. Phone: 717-334-7173 $00 Bullfi= Road Job Name- W Stabs & Zip Code: PA 17325 Job Location _-. Job Phone: We hereby submit apeci?s and as Mobilization SANITARY SERER 3422 FT of 8 IN SDR 0-10 w/bedding 525 Ft of 8 IN SDR 10-12 w/bedding -------------- 140 FT of 8 IN SDR 12-14 Wbedding 2305 FT of 6 IN SDR Lateral 0-10 351 FT of 6 IN SDR Laterals 10-12 72 FT of 6 x 6 IN Wye Connections 169 Manholes 19 Flow Channels --------------- 1 Tie Into Existing Manhole 1 Stub and Plug Manhole for. Westgate Date 08/01401 $ 8,000.00 S 73,846.76 S 12,M.25 S 3,956.40 S 38;009.45 S 6,233.76 S 2,880.00 S 27,040.00 $ 2,565.00 $ 998.39 $ 1,000.00 We. Propose hereby to furnish material and labor - complete m accordance with above specifications, for the sum Of DATI Payment to be made as follows: All material is .guaranteed to be as speciftion work to be completed in a workmanlike manner acto standard Authorized prices. Any alteration or deviom above Sim: specifications, involving extra costs will be donly upon written orders, and will bec ome an exge over and above the estimate. All agreements conupon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, \ and other necessary insurance. Our workers are fully covered by Workmen's Compensation and Liability Note: This proposal may be withdrawn by us if not accepted within l.9 days Aoe?ocee of propaaal - The above Prices, specifications and OU 8M conditions are satisfacy and are ?rerebY accepte& Ymade as $1ute: .adorned to do the work N specified. psy?t outlined above. Daft of Acceptance: Y C> 1 Ste' PROPOSAL & CONTRACT KEYSTOn CONTRACTING, INC. 51 Cove Road. Dnncannon, PA 17020 7I 834-9900 Subbed To. Verish Comstructiort, Inc. Phone: 717-334-7173 Date 48f01/07 Street goo Bullfro Road Job IQame: Westote Staff & Zip Cam; Gettysburg, PA 17325 Job Location Ambitect: Date of Plans: Job Phone: We haft submit specifications and es 72 Test Tees 2 Test Per Temp Specs STORM SEWER 3114 FT of I8 IN SUP 266 FT of 24 IN SUP 0-6 32 FT of 24 IN SLPP 6-8 . 172 Ff of 30 IN SLPP 14 Manholes 245 Inlets 43 Flow Channels 43 Inlet Protection Remove I Inlet Westgate $ 2,880.00 $ 3,000.00 $ 83,36820 $ 7,049.00 $ 896.00 $ 5,736.20 $ Z,I00.00 $ 36,750.00 $ 3,655.00 $ 4,300.00 $ 500.00 We Purpose hereby to furnish materiel and labor - complete in accordance with above specifications, for the sum of and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified All work to be campleW in a workmanlike manna' according to standard Authorized pmetices. Any alteration or deviation from above Sim; specifications involving extra costs will be executed only upon written orders, and will become an extra charge ova and above the a stimaroe. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry firs, tornado, \ and other necessary inaaance. Our workers are fully covered by Workmen's Compensation and Liability Note: This proposal may be witlrawn by us if not accepted within 3o days Aeoepaww of P"Pmzt - The above prices, spy ana condhioas we samsf wWry and are hereby accepted. You are odwrbzd to do the work as specified. Payment w be ? as Sipau outlined drove. c . Date of Acceptance: 1 ALL-) Signature & CONTRACT PROPOSAL KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 8349900 Propowd Submitted To: Varish Cankaw Inc. Phone: 717-3347173 Street: 800 Bullftog Road Job Name: W City, State & Zip Code; GeWjsbm& PA 17325 Job Location Architect: Dde of Plsos: Job Phone: We hereby submit specifications and estimated for. Westgate 3 Endwail R-4 Rock CULVERT WESTGATE DRIVE 90 FT OF 103 X 81 IN CUP 2 Headwall and Endwall CULVERT PARKWAY DRIVE 180 FT of 59 x 91 IN CMP 2 Headwall and Endwall WATERLINE 4425 Fr of 12 IN PVC Main 6 FT of 12 IN MJ Gate Valves 6 FT of 6 IN MJ Gate Valves $ 2,550.00 $ 1,625.00 $ 11,914.60 $ 9,990.00 $ 19,141.20 $ 15,720.00 $ 117,262.50 $ 6;660:00 $ 2,820.00 We Propose hereby to furnish material and labor - complete in accordance with above specifications, for Ste sum of sad 00 Payment to be made as follows: All material is guaranteed to be as specified All work to be completed m a wo?lilm mia er according to standard Aut6oriud practices. Any alteration or deviation from above Sim; specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon stakes, accidems or delays beyond our control. Owner to carry fire, tornado, \ and other necessary insunmee• Our workers are My covered by Workmen's Compensation and Liabft Note: This proper may be vAdxhvwn by us if not accepted whbin ? days Acc*9Mw of P^9pmd - The above pries, specdicatiow and wmhboas we umg&=y and are hereby accepted. be You am 3ignatuie a dboriad to do the work as speciSed. Paymert outlined above. Date o€ Acceptance: ? ? --2 Signature: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Dnncannon, PA 17020 71 834-9900 ne: 717-334-7173 Proposal Submitted To: Varish Inc. t Street` 800 Bullfro Road ELocatiEo We City. State 8t Zip Code: Gettysb PA 17325 n r? Wehereby submh specificatim and 412 x 12 MJ Tee 612 x 6 Hydrant Tee 13 121N Bends 6 Fire Hydrant 1 4 Tie Into existing 12 Valve Boxes 13 Thrust Blocking 2 Testing WATER SERVICE 43 % IN Short service 33 FT % IN Long service for; westrite We Propose hereby to furnish - complete in accordance with above Dollars and 00 Cents Date 08101/47 $ 1,200.00 $ 1,920.00 $ 1,755.00 $ 14,400.00 $ 1,200.00 $ 3,250.00 $ 1,900.00 $ 20,425.00 $ 14,800.00 for the sum of Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a wait a banana according to standard Authorized practices. Any alteration or deviation from above Signature: specifications involving extra coals will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon tr`i'bes, accideaits or delays beyond our control. Owner to carry fire, tornado, \ and other neccssery insurance. Our workers are fully covered by Workmen's Coon and Liability Note: This proposal may be withdrawn by us if not accepted within 39 of proparal mn above prices, specificaboos and are sWdwtary and any hereby ac oopaed. You are F . t as speci5ed. Payment be made as Steabove. >A do the woi f Acceptance: Ste' PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 834-9900 Submitted To: vanish Coon, Inc. Phone: 717-334-7173 Date 08/01/07 Street: 800 Bullftz Road b Name: Waftate C' Sane do Zip Code: Gettysburg, PA 17325 ob Location e.rht?r Date of Plans: Job Phone: We hereby submit specifications and estimated for Westgate CURBING 8835 SF Grade and Backfill $ 15,46125 8835 Ft of Rolled Concrete Curb $ 78,189.75 PAVING 16935 SY Fine Grade $ 11,007.75 16935 SY of 8 IN Crushed #4 Stone $ 114,31125 16935 SY of 2 IN BCBC Paving $ 105,504.75 16935 SY of 1 IN Wearing Paving $ 64'611.70 TOTAL $1,475,000.00 Propose hereby to famish material and labor - complete m accordance with above specifications, for the sum of Dollars and 00 Payment to be made as follows: All material is guaranteed to be as specified All work to be completed in a workmanlike manner according to standard. Authorized practices. Any alteration or deviation from above Sim: speeifications involving extra costs will be executed only upon written onlas, and will become an extra charge ova and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, \ and other necessary insurance. Our workers are fully covered by Workmen's Compensation and Liability Note: This proposal may be withdrawn by as if not accepted within 30 days AoaePau W of pnrpesW - The above Prices, Vwficatioas and cooDhons ace satisfactory and are hereby accepted. You are Signature: ufh m=d to do the work as specified. Payment vefti be nude as outlined above. J t 4 Date of Acceptance: ?Kl y /01 Signature; PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Dancannon, PA 17020 71 834-9900 Submitted To: Varish conswIction, Inc. Phone: 717-3347173 Date 08/01/07 Icity, treet: 800 Bullft9 Road Job Name. Westgate S State & Zip Code: Gettysburg, PA 17325 Job Location st,;tr?r Date of Plans: Job Phone: specifications and estimated for. Westgate Note: All asphalt pricing in this proposal will be subject to escalation based on the published Perm Dot Liquid asphalt index price at the time of placement Index price as of 07/31/07 is $328.00 a liquid ton. Pipe and other material prices are good for 30 days. payment to be made within 10 days from date of invoice. All materials stocked onsite are to be paid for due to escalation costs. Inspection and testing fees to be done by others. Any soils to be deemed unsuitable will be dealt with on a cubic yard basis. The grading may be altered from original plan due to areas that trees are to remain. Wires and poles to be relocated by others. Day schedule to complete job may altered due to in climate weather. Bulk of clearing and silt fence done by others. Keystone hired at time and material to finish clearing. Page 7 of 7 FPr0P0s"e ereby to fur nish material and labor - complete in accordance with above specifications, for the sum of Dollars and 00 Cents e made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifications involving extra costs will be execarted only upon written orders, and will become an came charge over and above the estimate. All agreements contingent upon striim acmdents or delays beyond our control. Owner to carry fire, tomado, \ and other necessary insurance. Our workers are hilly covered by workmen's Coon and Liability Aeagaaw of p vpssd - The above prices, specd'icNbms and camlidow we satisfactory and are hereby accred. You are asihoriiad to do the work as specified. Payment ill/? as sigflab= outlined above w! Mr Authorized Signature: Note: This proposal may be withdrawn by us if not accepted within M days 4 Date of Acceptance: 1K 1_ 1LL-? Signature. CHANGE ORDER Keystone Contractoag, Inc. Change Order No. 08-01 Project Westgate initiation Date: 06111/08 project No:. Contract For. Westgate Contract Date: The contract is changed as follows: Electrical Excavation $36,520.00 Gas Excavation $32,520.00 Additional Water Line and Valves $ 7,300.00 20 Rolls Straw Matting Erosion Blanket $ 960.00 Grub and Clear $14,348.75 Total Add $ 91,648.75 Not valid until signed by Varish Construction Inc. The Original Contract Sum $1,475,000.00 Net Change by Previously authorimd Change Orders $1,475,000.00 The Total contract Sum prior to this change order $ 91.648.75 The Contract Sum will be (INCREASED) by this Change Order ,566,648.70 The New Contrract Sum including this C:hMV Order $1,5 ? The Contract Time will be (unchanged) by Varish Constractfon Inc. 800 Bullfrog Road Gettysburg, PA 17325 By: Date Contractor Keystone Contracting, Inc. By: Date EXHIBIT "C" Work Completed: Flat Rate: Erosion Control Installation of three construction $4,500.00 entrances Installation of one outlet basin $1,000.00 Installation of endwall $850.00 Installation of 28 feet of 24 inch CMP $14.00 Installation of skimmer $1,021.00 Temporary seed and mulch $3,000.00 Bulk Excavation Strip 42,301 cubic yards of topsoil $95,177.25 Bulk Grading of 105,084 cubic yards $309,997.80 Place and compact fill -105,084 $73,558.80 cubic yards Mobilization $8,000.00 Sanitary Sewer Installation of 3,422 feet of 8 inch $73,846.76 SDR 0-10 with bedding Installation of 525 feet of 8 inch SDR $12,080.25 10-12 with bedding Installation of 140 feet of 8 inch SDR $3,956.40 12-14 with bedding Installation of 2,305 feet of 6 inch $38,009.45 SDR lateral 0-10 Installation of 351 feet of 6 inch SDR $6,233.76 laterals 10-12 % Completed: Amount Owed: 66.67 $3,000.00 100 $1,000.00 100 $850.00 100 $14.00 100 $1,021.00 50 $1,500.00 97.47 $92,772.51 99.22 $307,593.06 96.73 $71,153.26 69.94 $5,595.27 48.75 $36,000.00 74.92 $9,050.00 48.73 $1,927.86 39.46 $15,000.00 100 $6,233.76 Installation of seventy-two 6 x 6 inch $2,880.00 Wye Connections Installation of 169 vertical feet of $27,040.00 manholes Installation of 19 manhole flow $2,565.00 channels Installation of tie into existing $998.38 manhole Installation of stub and plug manhole $1,000.00 Installation of 72 test tees $2,880.00 Sewer two test per temp specs $3,000.00 Storm Sewer Installation of 3,914 feet of 18 inch $83,368.20 SLPP Installation of 14 vertical feet of $2,100.00 manholes Installation of 45 inlets $36,750.00 Culvert Westgate Drive Installation of 90 feet of 103 x 81 $11,991.60 CMP Installation of one headwall and $9,990.00 one endwall Culvert Parkway Drive Installation of 180 feet of 59 x 81 $19,141.20 inch CMP Installation of one headwall and $15,720.00 one endwall 67.01 $1,930.00 31.8 $8,600.00 100 $2,565.00 100 $998.38 100 $1,000.00 67.01 $1,930.00 67 $2,010.00 47.34 $39,468.90 100 $2,100.00 44.02 $16,176.84 100 $11,991.60 100 $9,990.00 100 $19,141.20 100 $15,720.00 Water line Installation of 4,425 feet of 12 inch $117,262.50 41.42 $48,684.90 PVC main Installation of six 12 inch MJ $6,660.00 50 $3,330.00 Gate Valves Installation of six 6 inch MJ $2,820.00 50 $1,410.00 Gate Valves Installation of four 12 x 12 MJ Tees $1,200.00 50 $600.00 Installation of six 12 x 6 hydrant tees $1,920.00 50 $960.00 Installation of thirteen 12 inch bends $1,755.00 50 $877.50 Installation of six fire hydrants $14,400.00 50 $7,200.00 Installation of four ties into existing $6,000.00 50 $3,000.00 lines Installation of 12 valve boxes $1,200.00 50 $600.00 Installation of 13 thrust blocks $3,250.00 50 $1,625.00 Water service Installation of forty-two % inch $20,425.00 30 $6,127.50 short service Installation of thirty % inch long $19,800.00 30 $5,940.00 service Curbing Grading and backfill of 8,825 lineal $15,461.25 33.63 $5,200.00 feet Installation of 8,835 lineal feet of $78,189.75 23.35 $18,256.93 rolled concrete curbing Paving Installation of 16,935 square yards of fine grade Installation of 16,935 square yards of 8 inch crushed #4 stone Installation of 16,935 square yards of 3 inch BCBC paving Change order Excavation for installation of 3,043 feet of electrical lines Excavation for installation of 2,710 feet of gas lines Installation of additional water lines and valves Installation of twenty rolls of straw matting erosion blanket Grub and clear Installation of electrical crossing: 506 feet of pipe and stone bedding Installation of gas crossing: 320 feet of pipe and stone bedding Additional clearing work Machine: 963 Cat Loader Cat 953 Loader Dump truck $11,007.75 35.6 $114,311.25 35.6 $170,196.45 35.6 $36,520.00 100 $32,520.00 100 $7,300.00 100 $960.00 100 $14,348.75 100 $7,600.00 100 $4,800.00 100 Hourly Rate: $100.00 $90.00 $65.00 Hours worked: 229.5 44.5 113.75 $3,918.27 $40,689.78 $60,582.34 $36,520.00 $32,520.00 $7,300.00 $960.00 $14,348.75 $7,600.00 $4,800.00 Amount owed: $22,950.00 $4,005.00 $7,393.75 t C-t O 9 ' ? rw h KEYSTONE CONTRACTING, INC., Claimant, V. ELBERT, L.P., Owner IN THE COURT OF COMMON PLEAS, CUMBERLAND COUNTY, PENNSYLVANIA NO. 08-6911 MLD : MECHANICS' LIEN CLAIM ACCEPTANCE OF SERVICE I, Robert Frey, Esquire, accept service of the Notice of Filing of Mechanics' Lien Claim in the above-captioned matter on behalf of Elbert, L.P. and certify that I am authorized to do so. Date: III Zy v By: La?? Robert Frey, Esquire Frey & Tiley 5 South Hanover Street Carlisle, PA 17013-3307 Attorney for Owner, Elbert, L.P. 6`"j 4l °T -,. C-3 , GJ - . a ...,.,. i"C_..