HomeMy WebLinkAbout08-6911
KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
NO. D8 - loq 11 M L P
: MECHANICS' LIEN CLAIM
MECHANICS' LIEN CLAIM
AND NOW, comes Claimant, Keystone Contracting, Inc., by and through its
attorneys, Wix, Wenger & Weidner, and files this Mechanics' Lien Claim, stating as
follows:
1. Claimant, Keystone Contracting, Inc., is a Pennsylvania corporation, which
maintains its principal place of business at 51 Cove Road, Duncannon, PA
17020.
2. Claimant files this Mechanics' Lien Claim as a subcontractor.
3. The owner of the property subject to this lien is Elbert, L.P., a Pennsylvania
limited partnership, which maintains its primary place of business at 7 Whispering
Pines Lane, Carlisle, PA 17015 ("Owner").
4. The date on which Claimant last performed work was May 27, 2008. Claimant
did not complete all work on the property because Claimant was not paid the
amount owed for its work despite Claimant's demands; and, Claimant was not
provided with adequate assurance that it would be paid for the work performed.
5. Claimant provided formal notice of its intention to file a Mechanics' Lien Claim on
August 11, 2008, via first class and certified mail. A copy of the notice is
1
attached hereto as Exhibit "A" and incorporated herein by reference as though
fully set forth.
6. Claimant files this claim under a written contract with Varish Construction, Inc.
(the "Contractor"), which served as contractor to Constantinos and Elaine
Mallios, prior owners of the property subject to this lien, dated August 8, 2007
(the "Contract") wherein Claimant agreed to furnish the labor and materials
necessary for the excavation, erosion control, sewer installation, storm sewer
installation, grading, water line installation, curbing and paving, in connection with
the improvement of the properties claimed to be subject to this lien, to prepare
them for the erection and construction of residential homes, streets, and
stormwater management. A copy of the Contract is attached hereto as Exhibit
"B" and incorporated herein by reference as though fully set forth.
7. Contractor and Claimant agreed that Claimant would provide the labor and
materials necessary to perform the work listed in the Contract. Contractor and
Claimant agreed that the work would be performed at a flat rate, as shown in the
Contract.
8. In addition, Contractor and Claimant agreed that Claimant would provide clearing
work (digging out tree stumps, hauling tree stumps, burying tree stumps, and
removal of trees) at an hourly rate for the machine and operator.
9. Pursuant to the Contract and subsequent agreement of the parties, Claimant
performed the work as set forth on Exhibit "C," which is incorporated herein by
reference as though set forth in full.
2
10, Claimant sent periodic invoices to Contractor for the portion of the work
performed by the date of the invoice. The total amount billed for the work
performed is $1,033,732.36. The total amount paid is $822,110.17.
11. The amount owed for the work performed is $211,622.19. The amount of this
claim, after apportioning the total debt among the varying improvements, is
$5,760.63.
12. The improvements and property claimed to be subject to the lien is situate in the
Township of South Middleton Township, Cumberland County, Commonwealth of
Pennsylvania, shown as Lot 121 on a Final Subdivision Plan prepared by Herbert
Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007,
recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, and
which has tax parcel number 40-12-0340-102.
Respectfully Submitted,
WIX, WENOFV 0 WEIDNER
Date: I Z010?5 By:
3
Jeff 'NZXlark, I.D. # 89277
50 rthl Second Street
P. ox 845
Harrisburg, PA 17108-845
(717) 234-4182
Attorneys for Claimant
VERIFICATION
I have reads the foregoing Mechanics' Lien Claim and hereby affirm and verify
that, to the best of my knowledge, information and belief, all of the statements made
therein are true and correct, and I acknowledge that false statements made therein may
subject me to the penalties of 18 Pa.C.S. § 4904, relating to unsworn falsification to
authorities.
KEYSTONE CONTRACTING, INC.
Date: By:
Deborah Frisch, President
EXHIBIT "A"
WIX, WENGER & WEIDNER
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW THOMAS L. WENGER
SPITZER
ROBERT C
RICHARD H. W IX
R
DEAN A. 508 NORTH SECOND STREET .
Of Counsel
C. WILD
STEVEN C C.
' POST OFFICE BOX 845
L. . SHADE WIX
THERESA
DAVID R. GETZ HARRISBURG, PENNSYLVANIA 17108-0845
STEPHEN J. DZURANIN
JEFFREY C. CLARK
PETER G. HOWLAND
Suburban Office:
S Su
(717) 234-4182 DUKE STREET
4705
Also Member MaS62thusebe Bar FAX(717)234-4224 HARRISBURG, PA 17109-3041
(717) 652-8455
www.wwwpalaw.com
August 11, 2008
Elbert, L.P. Via Certified and First Class Mail
7 Whispering Pines Lane
Carlisle, PA 17015
RE: Keystone Contracting, Inc.
Formal Notice of Intent to File Mechanics' Lien
Phases 5, 6, and 7 of Westgate Development,
Cumberland County, Pennsylvania
Our File No.: 4920-15040
To Whom It May Concern:
This firm represents Keystone Contracting, Inc. ("Keystone"). This is Keystone's
formal notice of its intention to file a Mechanics' Lien against your properties owned by
you, which are more particularly described on Exhibit 'W', attached hereto, for its work in
connection with the improvement of the properties to prepare them for the erection and
construction of homes.
This notice is being served by Keystone as a subcontractor to Varish
Construction, Inc., contractor to Constantinos J. Mallios and Elaine Mallios, prior owners
of the properties. Keystone provided the excavation, erosion control, sewer installation,
storm sewer installation, grading, water line installation, curbing and paving.
Keystone completed its work on the project on May 27, 2008.
Unless the amount of $211,622.19, due to Keystone for its work, is promptly
paid, Keystone will file a Mechanics' Lien to secure payment for its work on the
properties.
Sincerely,
Wix, Wg4jef &lNeidner
By:
JCC/hjob
cc: Keystone Contracting, Inc.
Exhibit A
The following lots or tracts of land situate in the Township of South Middleton Township,
Cumberland County, Commonwealth of Pennsylvania, shown on a Final Subdivision
Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised
March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59,
as follows:
Lot 120 -Tax Parcel No. 40-12-0340-103
Lot 121 Tax Parcel No. 40-12-0340-102
Lot 122 -Tax Parcel No. 40-12-0340-101
Lot 124 -Tax Parcel No. 40-12-0340-099
Lot 125 -Tax Parcel No 40-12-0340-091
Lot 126 -Tax Parcel No. 40-12-0340-097
Lot 127 -Tax Parcel No. 40-12-0340-096
Lot 128 -Tax Parcel No. 40-12-0340-095
Lot 129 -Tax Parcel No. 40-12-0340-094
¦ Complete ftems 1, 2, and 3. Also complete. A.
item 4 if Restricted Delhtery Is desired. . 13 Agent
x
¦ Print your name and address on the reverse ? Addressee
so that we can retum the card to you.
¦ Attach this card to the back of the mailpleoe, g pr} Name) c. Date of Delivery
egg
or on the front if apace permits.
1. Article Addressed to: D. Is delivery address d from Item 1? ? Yes
If YES, enter delivery address below: ? No
(its ?aft, e"
r7 l -7015-
Carf[51e,
3. MerrtUiiedd mall 13 Eoliess, Mail
? Registered Ch%wm Reciso for merchandise
? Insured Mail ? C.O.D.
4. Restricted Delivery? (Extra Fee) M Yes
2. Article Number 7003 1680 0006 5640 7454
Martsfer from service kw
PS Form 3811, February 2004 Domestic Return Receipt 10259e.024A.1e40
=- CERTIF INS
u'1
?- •
tti
For delivery information visit our veosite at www-usps.caril
o
Ln Postage $
`D
G Certified Fee
.3 Retum Redept Fee Here resrlc
(Endorsement Required)
(3 Restricted Delivery Fee
cO (Endorsement Required)
.0 ?•f
r-1 Total Postage & Fees $
M
O Sent o
M i - -
M1 ------------ ----- - ....-
or PO Box No.
- - --- -- --------
Ctty. State. ZIP+4 ??/ )/
EXHIBIT "B"
1. W?
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-900
osal Submitted To. Varish Construction, Inc. Phone: 717-334-7173
800 Bullfrog Road Job Name: westsate
Std: PA 17325 Job Location
Job Phone:
We heretry submit specifications and estimated for: Westgate
EROSION CONTROL
3 Construction Entrances
I Outlet Basin
1 Endwall
28 FT of 24 IN CMP
I Skimmer
22800 SF Grass Lmes Swales
Temporary Seed and Mulch
giTI, - EXCAVATION
-------------
Strip 42301 CY of Topsoil
105084 Cy Bulk Grading
Place 105084 Cy and Compact Fill
Propose hereby to furnish material and labor - complete in accordance with above
and 80 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike manner according tD standard Autlionzed
practices. Any alteration or deviation from above Signuare:
specifications involvipg cxtm costs will be exearted only upon
written orders, and will become an extra charge over and
above the estimate. All apuments contingent upon strikes,
accident or delays beyond our controL owner to Carry fire,
tornado, \ and other necessary insuance. Our workers are
fully covered by Workmen's Compensation and Liability Note: This proposal may be
Aeaeepaarroa of pn prod - The above prices, specifieaaoas Ina
condom are aatory and are hereby accepted: You are Signature:
auffimmd tD do the work as specifcd. Payment will be made as
outlined above. /-
Date of Acceptance: 7 Ste' _
Date 08/01/07
$ 4,500.00
$ 1,000,00
$ 850.00
$' 14.00
$ 1,021.00
$ 10,260.00
$ 3,000.00
$ 95,17725
$309,997.80
$ 73,558.80
for the sum of
as if not accepted within 30 days
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-900
al Submi#ted To: vanish construction, Inc. Phone: 717-334-7173
$00 Bullfi= Road Job Name- W
Stabs & Zip Code: PA 17325 Job Location
_-. Job Phone:
We hereby submit apeci?s and as
Mobilization
SANITARY SERER
3422 FT of 8 IN SDR 0-10 w/bedding
525 Ft of 8 IN SDR 10-12 w/bedding
--------------
140 FT of 8 IN SDR 12-14 Wbedding
2305 FT of 6 IN SDR Lateral 0-10
351 FT of 6 IN SDR Laterals 10-12
72 FT of 6 x 6 IN Wye Connections
169 Manholes
19 Flow Channels
---------------
1 Tie Into Existing Manhole
1 Stub and Plug Manhole
for. Westgate
Date 08/01401
$ 8,000.00
S 73,846.76
S 12,M.25
S 3,956.40
S 38;009.45
S 6,233.76
S 2,880.00
S 27,040.00
$ 2,565.00
$ 998.39
$ 1,000.00
We. Propose hereby to furnish material and labor - complete m accordance with above specifications, for the sum Of
DATI
Payment to be made as follows:
All material is .guaranteed to be as speciftion work to be
completed in a workmanlike manner acto standard Authorized
prices. Any alteration or deviom above Sim:
specifications, involving extra costs will be donly upon
written orders, and will bec ome an exge over and
above the estimate. All agreements conupon strikes,
accidents or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability Note: This proposal may be withdrawn by us if not accepted within l.9 days
Aoe?ocee of propaaal - The above Prices, specifications and OU 8M conditions are satisfacy and are ?rerebY accepte& Ymade as $1ute:
.adorned to do the work N specified. psy?t
outlined above.
Daft of Acceptance: Y C> 1 Ste'
PROPOSAL & CONTRACT
KEYSTOn CONTRACTING, INC.
51 Cove Road.
Dnncannon, PA 17020
7I 834-9900
Subbed To. Verish Comstructiort, Inc. Phone: 717-334-7173 Date 48f01/07
Street goo Bullfro Road Job IQame: Westote
Staff & Zip Cam; Gettysburg, PA 17325 Job Location
Ambitect: Date of Plans: Job Phone:
We haft submit specifications and es
72 Test Tees
2 Test Per Temp Specs
STORM SEWER
3114 FT of I8 IN SUP
266 FT of 24 IN SUP 0-6
32 FT of 24 IN SLPP 6-8 .
172 Ff of 30 IN SLPP
14 Manholes
245 Inlets
43 Flow Channels
43 Inlet Protection
Remove I Inlet
Westgate
$ 2,880.00
$ 3,000.00
$ 83,36820
$ 7,049.00
$ 896.00
$ 5,736.20
$ Z,I00.00
$ 36,750.00
$ 3,655.00
$ 4,300.00
$ 500.00
We Purpose hereby to furnish materiel and labor - complete in accordance with above specifications, for the sum of
and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified All work to be
campleW in a workmanlike manna' according to standard Authorized
pmetices. Any alteration or deviation from above Sim;
specifications involving extra costs will be executed only upon
written orders, and will become an extra charge ova and
above the a stimaroe. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to carry firs,
tornado, \ and other necessary inaaance. Our workers are
fully covered by Workmen's Compensation and Liability Note: This proposal may be witlrawn by us if not accepted within 3o days
Aeoepaww of P"Pmzt - The above prices, spy ana
condhioas we samsf wWry and are hereby accepted. You are
odwrbzd to do the work as specified. Payment w be ? as Sipau
outlined drove. c .
Date of Acceptance: 1 ALL-) Signature
& CONTRACT
PROPOSAL
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 8349900
Propowd Submitted To: Varish Cankaw Inc. Phone: 717-3347173
Street: 800 Bullftog Road Job Name: W
City, State & Zip Code; GeWjsbm& PA 17325 Job Location
Architect: Dde of Plsos: Job Phone:
We hereby submit specifications and estimated for. Westgate
3 Endwail
R-4 Rock
CULVERT WESTGATE DRIVE
90 FT OF 103 X 81 IN CUP
2 Headwall and Endwall
CULVERT PARKWAY DRIVE
180 FT of 59 x 91 IN CMP
2 Headwall and Endwall
WATERLINE
4425 Fr of 12 IN PVC Main
6 FT of 12 IN MJ Gate Valves
6 FT of 6 IN MJ Gate Valves
$ 2,550.00
$ 1,625.00
$ 11,914.60
$ 9,990.00
$ 19,141.20
$ 15,720.00
$ 117,262.50
$ 6;660:00
$ 2,820.00
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for Ste sum of
sad 00
Payment to be made as follows:
All material is guaranteed to be as specified All work to be
completed m a wo?lilm mia er according to standard Aut6oriud
practices. Any alteration or deviation from above Sim;
specifications involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon stakes,
accidems or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insunmee• Our workers are
My covered by Workmen's Compensation and Liabft Note: This proper may be vAdxhvwn by us if not accepted whbin ? days
Acc*9Mw of P^9pmd - The above pries, specdicatiow and
wmhboas we umg&=y and are hereby accepted. be You am 3ignatuie
a dboriad to do the work as speciSed. Paymert
outlined above.
Date o€ Acceptance: ? ? --2 Signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Dnncannon, PA 17020
71 834-9900
ne: 717-334-7173
Proposal Submitted To: Varish Inc. t
Street` 800 Bullfro Road ELocatiEo We
City. State 8t Zip Code: Gettysb PA 17325 n r?
Wehereby submh specificatim and
412 x 12 MJ Tee
612 x 6 Hydrant Tee
13 121N Bends
6 Fire Hydrant
1 4 Tie Into existing
12 Valve Boxes
13 Thrust Blocking
2 Testing
WATER SERVICE
43 % IN Short service
33 FT % IN Long service
for; westrite
We Propose hereby to furnish
- complete in accordance with above
Dollars and 00 Cents
Date 08101/47
$ 1,200.00
$ 1,920.00
$ 1,755.00
$ 14,400.00
$ 1,200.00
$ 3,250.00
$ 1,900.00
$ 20,425.00
$ 14,800.00
for the sum of
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a wait a banana according to standard Authorized
practices. Any alteration or deviation from above Signature:
specifications involving extra coals will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon tr`i'bes,
accideaits or delays beyond our control. Owner to carry fire,
tornado, \ and other neccssery insurance. Our workers are
fully covered by Workmen's Coon and Liability Note: This proposal may be withdrawn by us if not accepted within 39
of proparal mn above prices, specificaboos and
are sWdwtary and any hereby ac oopaed. You are
F .
t as speci5ed. Payment be made as Steabove.
>A do the
woi
f Acceptance: Ste'
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-9900
Submitted To: vanish Coon, Inc. Phone: 717-334-7173 Date 08/01/07
Street: 800 Bullftz Road b Name: Waftate
C' Sane do Zip Code: Gettysburg, PA 17325 ob Location
e.rht?r Date of Plans: Job Phone:
We hereby submit specifications and estimated for Westgate
CURBING
8835 SF Grade and Backfill $ 15,46125
8835 Ft of Rolled Concrete Curb $ 78,189.75
PAVING
16935 SY Fine Grade $ 11,007.75
16935 SY of 8 IN Crushed #4 Stone $ 114,31125
16935 SY of 2 IN BCBC Paving $ 105,504.75
16935 SY of 1 IN Wearing Paving $ 64'611.70
TOTAL $1,475,000.00
Propose hereby to famish material and labor - complete m accordance with above specifications, for the sum of
Dollars and 00
Payment to be made as follows:
All material is guaranteed to be as specified All work to be
completed in a workmanlike manner according to standard. Authorized
practices. Any alteration or deviation from above Sim:
speeifications involving extra costs will be executed only upon
written onlas, and will become an extra charge ova and
above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability Note: This proposal may be withdrawn by as if not accepted within 30 days
AoaePau W of pnrpesW - The above Prices, Vwficatioas and
cooDhons ace satisfactory and are hereby accepted. You are Signature:
ufh m=d to do the work as specified. Payment vefti be nude as
outlined above. J t
4
Date of Acceptance: ?Kl y /01 Signature;
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Dancannon, PA 17020
71 834-9900
Submitted To: Varish conswIction, Inc. Phone: 717-3347173 Date 08/01/07
Icity, treet: 800 Bullft9 Road Job Name. Westgate
S
State & Zip Code: Gettysburg, PA 17325 Job Location
st,;tr?r Date of Plans: Job Phone:
specifications and estimated for. Westgate
Note: All asphalt pricing in this proposal will be subject to escalation based on the published Perm Dot Liquid asphalt index price at
the time of placement Index price as of 07/31/07 is $328.00 a liquid ton. Pipe and other material prices are good for 30 days.
payment to be made within 10 days from date of invoice.
All materials stocked onsite are to be paid for due to escalation costs.
Inspection and testing fees to be done by others.
Any soils to be deemed unsuitable will be dealt with on a cubic yard basis.
The grading may be altered from original plan due to areas that trees are to remain.
Wires and poles to be relocated by others.
Day schedule to complete job may altered due to in climate weather.
Bulk of clearing and silt fence done by others. Keystone hired at time and material to finish clearing.
Page 7 of 7
FPr0P0s"e ereby to fur nish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Cents
e made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike manner according to standard
practices. Any alteration or deviation from above
specifications involving extra costs will be execarted only upon
written orders, and will become an came charge over and
above the estimate. All agreements contingent upon striim
acmdents or delays beyond our control. Owner to carry fire,
tomado, \ and other necessary insurance. Our workers are
hilly covered by workmen's Coon and Liability
Aeagaaw of p vpssd - The above prices, specd'icNbms and
camlidow we satisfactory and are hereby accred. You are
asihoriiad to do the work as specified. Payment ill/? as sigflab=
outlined above w! Mr
Authorized
Signature:
Note: This proposal may be withdrawn by us if not accepted within M days
4
Date of Acceptance: 1K 1_ 1LL-? Signature.
CHANGE ORDER
Keystone Contractoag, Inc.
Change Order No. 08-01
Project Westgate initiation Date: 06111/08
project No:.
Contract For. Westgate
Contract Date:
The contract is changed as follows:
Electrical Excavation $36,520.00
Gas Excavation $32,520.00
Additional Water Line and Valves $ 7,300.00
20 Rolls Straw Matting Erosion Blanket $ 960.00
Grub and Clear $14,348.75
Total Add $ 91,648.75
Not valid until signed by Varish Construction Inc.
The Original Contract Sum $1,475,000.00
Net Change by Previously authorimd Change Orders $1,475,000.00
The Total contract Sum prior to this change order $ 91.648.75
The Contract Sum will be (INCREASED) by this Change Order ,566,648.70
The New Contrract Sum including this C:hMV Order $1,5 ?
The Contract Time will be (unchanged) by
Varish Constractfon Inc.
800 Bullfrog Road
Gettysburg, PA 17325
By:
Date
Contractor
Keystone Contracting, Inc.
By:
Date
EXHIBIT "C"
Work Completed: Flat Rate:
Erosion Control
Installation of three construction $4,500.00
entrances
Installation of one outlet basin $1,000.00
Installation of endwall $850.00
Installation of 28 feet of 24 inch CMP $14.00
Installation of skimmer $1,021.00
Temporary seed and mulch $3,000.00
Bulk Excavation
Strip 42,301 cubic yards of topsoil $95,177.25
Bulk Grading of 105,084 cubic yards $309,997.80
Place and compact fill -105,084 $73,558.80
cubic yards
Mobilization $8,000.00
Sanitary Sewer
Installation of 3,422 feet of 8 inch $73,846.76
SDR 0-10 with bedding
Installation of 525 feet of 8 inch SDR $12,080.25
10-12 with bedding
Installation of 140 feet of 8 inch SDR $3,956.40
12-14 with bedding
Installation of 2,305 feet of 6 inch $38,009.45
SDR lateral 0-10
Installation of 351 feet of 6 inch SDR $6,233.76
laterals 10-12
% Completed: Amount Owed:
66.67 $3,000.00
100 $1,000.00
100 $850.00
100 $14.00
100 $1,021.00
50 $1,500.00
97.47 $92,772.51
99.22 $307,593.06
96.73 $71,153.26
69.94 $5,595.27
48.75 $36,000.00
74.92 $9,050.00
48.73 $1,927.86
39.46 $15,000.00
100 $6,233.76
Installation of seventy-two 6 x 6 inch $2,880.00
Wye Connections
Installation of 169 vertical feet of $27,040.00
manholes
Installation of 19 manhole flow $2,565.00
channels
Installation of tie into existing $998.38
manhole
Installation of stub and plug manhole $1,000.00
Installation of 72 test tees $2,880.00
Sewer two test per temp specs $3,000.00
Storm Sewer
Installation of 3,914 feet of 18 inch $83,368.20
SLPP
Installation of 14 vertical feet of $2,100.00
manholes
Installation of 45 inlets $36,750.00
Culvert Westgate Drive
Installation of 90 feet of 103 x 81 $11,991.60
CMP
Installation of one headwall and $9,990.00
one endwall
Culvert Parkway Drive
Installation of 180 feet of 59 x 81 $19,141.20
inch CMP
Installation of one headwall and $15,720.00
one endwall
67.01 $1,930.00
31.8 $8,600.00
100 $2,565.00
100 $998.38
100 $1,000.00
67.01 $1,930.00
67 $2,010.00
47.34 $39,468.90
100 $2,100.00
44.02 $16,176.84
100 $11,991.60
100 $9,990.00
100 $19,141.20
100 $15,720.00
Water line
Installation of 4,425 feet of 12 inch $117,262.50 41.42 $48,684.90
PVC main
Installation of six 12 inch MJ $6,660.00 50 $3,330.00
Gate Valves
Installation of six 6 inch MJ $2,820.00 50 $1,410.00
Gate Valves
Installation of four 12 x 12 MJ Tees $1,200.00 50 $600.00
Installation of six 12 x 6 hydrant tees $1,920.00 50 $960.00
Installation of thirteen 12 inch bends $1,755.00 50 $877.50
Installation of six fire hydrants $14,400.00 50 $7,200.00
Installation of four ties into existing $6,000.00 50 $3,000.00
lines
Installation of 12 valve boxes $1,200.00 50 $600.00
Installation of 13 thrust blocks $3,250.00 50 $1,625.00
Water service
Installation of forty-two % inch $20,425.00 30 $6,127.50
short service
Installation of thirty % inch long $19,800.00 30 $5,940.00
service
Curbing
Grading and backfill of 8,825 lineal $15,461.25 33.63 $5,200.00
feet
Installation of 8,835 lineal feet of $78,189.75 23.35 $18,256.93
rolled concrete curbing
Paving
Installation of 16,935 square yards
of fine grade
Installation of 16,935 square yards
of 8 inch crushed #4 stone
Installation of 16,935 square yards
of 3 inch BCBC paving
Change order
Excavation for installation of
3,043 feet of electrical lines
Excavation for installation of
2,710 feet of gas lines
Installation of additional water lines
and valves
Installation of twenty rolls of straw
matting erosion blanket
Grub and clear
Installation of electrical crossing:
506 feet of pipe and stone bedding
Installation of gas crossing:
320 feet of pipe and stone bedding
Additional clearing work
Machine:
963 Cat Loader
Cat 953 Loader
Dump truck
$11,007.75 35.6
$114,311.25 35.6
$170,196.45 35.6
$36,520.00 100
$32,520.00 100
$7,300.00 100
$960.00 100
$14,348.75 100
$7,600.00 100
$4,800.00 100
Hourly Rate:
$100.00
$90.00
$65.00
Hours worked:
229.5
44.5
113.75
$3,918.27
$40,689.78
$60,582.34
$36,520.00
$32,520.00
$7,300.00
$960.00
$14,348.75
$7,600.00
$4,800.00
Amount owed:
$22,950.00
$4,005.00
$7,393.75
t
C-t
O
9 ' ? rw
h
KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
NO. 08-6911 MLD
: MECHANICS' LIEN CLAIM
ACCEPTANCE OF SERVICE
I, Robert Frey, Esquire, accept service of the Notice of Filing of Mechanics' Lien
Claim in the above-captioned matter on behalf of Elbert, L.P. and certify that I am
authorized to do so.
Date: III Zy v
By: La?? Robert Frey, Esquire
Frey & Tiley
5 South Hanover Street
Carlisle, PA 17013-3307
Attorney for Owner,
Elbert, L.P.
6`"j 4l °T
-,. C-3 ,
GJ - .
a ...,.,. i"C_..