HomeMy WebLinkAbout08-6912KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
NO. C9- (oQ I c1: ?.t U>
MECHANICS' LIEN CLAIM
MECHANICS' LIEN CLAIM
AND NOW, comes Claimant, Keystone Contracting, Inc., by and through its
attorneys, Wix, Wenger & Weidner, and files this Mechanics' Lien Claim, stating as
follows:
1. Claimant, Keystone Contracting, Inc., is a Pennsylvania corporation, which
maintains its principal place of business at 51 Cove Road, Duncannon, PA
17020.
2. Claimant files this Mechanics' Lien Claim as a subcontractor.
3. The owner of the property subject to this lien is Elbert, L.P., a Pennsylvania
limited partnership, which maintains its primary place of business at 7 Whispering
Pines Lane, Carlisle, PA 17015 ("Owner").
4. The date on which Claimant last performed work was May 27, 2008. Claimant
did not complete all work on the property because Claimant was not paid the
amount owed for its work despite Claimant's demands; and, Claimant was not
provided with adequate assurance that it would be paid for the work performed.
5. Claimant provided formal notice of its intention to file a Mechanics' Lien Claim on
August 11, 2008, via first class and certified mail. A copy of the notice is
1
attached hereto as Exhibit "A" and incorporated herein by reference as though
fully set forth.
6. Claimant files this claim under a written contract with Varish Construction, Inc.
(the "Contractor"), which served as contractor to Constantinos and Elaine
Mallios, prior owners of the property subject to this lien, dated August 8, 2007
(the "Contract") wherein Claimant agreed to furnish the labor and materials
necessary for the excavation, erosion control, sewer installation, storm sewer
installation, grading, water line installation, curbing and paving, in connection with
the improvement of the properties claimed to be subject to this lien, to prepare
them for the erection and construction of residential homes, streets, and
stormwater management. A copy of the Contract is attached hereto as Exhibit
"B" and incorporated herein by reference as though fully set forth.
7. Contractor and Claimant agreed that Claimant would provide the labor and
materials necessary to perform the work listed in the Contract. Contractor and
Claimant agreed that the work would be performed at a flat rate, as shown in the
Contract.
8. In addition, Contractor and Claimant agreed that Claimant would provide clearing
work (digging out tree stumps, hauling tree stumps, burying tree stumps, and
removal of trees) at an hourly rate for the machine and operator.
9. Pursuant to the Contract and subsequent agreement of the parties, Claimant
performed the work as set forth on Exhibit "C," which is incorporated herein by
reference as though set forth in full.
2
10. Claimant sent periodic invoices to Contractor for the portion of the work
performed by the date of the invoice. The total amount billed for the work
performed is $1,033,732.36. The total amount paid is $822,110.17.
11. The amount owed for the work performed is $211,622.19. The amount of this
claim, after apportioning the total debt among the varying improvements, is
$5,760.63.
12. The improvements and property claimed to be subject to the lien is situate in the
Township of South Middleton Township, Cumberland County, Commonwealth of
Pennsylvania, shown as Lot 122 on a Final Subdivision Plan prepared by Herbert
Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007,
recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, and
which has tax parcel number 40-12-0340-101.
Respectfully Submitted,
WIX, WENGERWV)OEPNER
Date: Nzojo25 By:
3
Jeffrey I.D. # 89277
508 N e nd Street
P. 0. B 45
Harrisburg, PA 17108-845
(717) 234-4182
Attorneys for Claimant
VERIFICATION
I have reads the foregoing Mechanics' Lien Claim and hereby affirm and verify
that, to the best of my knowledge, information and belief, all of the statements made
therein are true and correct, and I acknowledge that false statements made therein may
subject me to the penalties of 18 Pa.C.S. § 4904, relating to unsworn falsification to
authorities.
Date: A?7,?766
KEYSTONE CONT TING, INC.
By:
Deborah Frisch, President
EXHIBIT "A"
RICHARD H. WIX
DEAN A. WEIDNER
STEVEN C. WILDS
THERESA L. SHADE WIX'
DAVID R. GETZ
STEPHEN J. DZURANIN
JEFFREY C. CLARK
PETER G. HOWLAND
. Alan Mahar maaacnuu"as B&
(717) 234-4182
FAX (717) 234-4224
www.wwwpalaw.com
THOMAS L. WENGER
ROBERT C. SPITZER
Of Counsel
Suburban Office:
4705 DUKE STREET
HARRISBURG, PA 17109-3041
(717) 652-8455
August 11, 2008
Elbert, L.P.
7 Whispering Pines Lane
Carlisle, PA 17015
Via Certified and First Class Mail
RE: Keystone Contracting, Inc.
Formal Notice of Intent to File Mechanics' Lien
Phases 5, 6, and. 7 of Westgate Development,
Cumberland County, Pennsylvania
Our File No.: 4920-15040
To Whom It May Concern:
This firm represents Keystone Contracting, Inc. ("Keystone"). This is Keystone's
formal notice of its intention to file a Mechanics' Lien against your properties owned by
you, which are more particularly described on Exhibit "A attached hereto, for its work in
connection with the improvement of the properties to prepare them for the erection and
construction of homes.
This notice is being served by Keystone as a subcontractor to Varish
Construction, Inc., contractor to Constantinos J. Mallios and Elaine Mallios, prior owners
of the properties. Keystone provided the excavation, erosion control, sewer installation,
storm sewer installation, grading, water line installation, curbing and paving.
Keystone completed its work on the project on May 27, 2008.
Unless the amount of $211,622.19, due to Keystone for its work, is promptly
paid, Keystone will file a Mechanics' Lien to secure payment for its work on the
properties.
Sincerely
Wix, We f & Weidner
By:
WIX, WENGER & WEIDNER
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
508 NORTH SECOND STREET
POST OFFICE BOX 845
HARRISBURG, PENNSYLVANIA 17108-0845
JCC/hjob
cc: Keystone Contracting, Inc.
Exhibit A
The following lots or tracts of land situate in the Township of South Middleton Township,
Cumberland County, Commonwealth of Pennsylvania, shown on a Final Subdivision
Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised
March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59,
as follows:
Lot 120 -Tax Parcel No. 40-12-0340-103
Lot 121 -Tax Parcel No. 40-12-0340-102
Lot 122 - Tax Parcel No. 40-12-0340-101
Lot 124 -Tax Parcel No. 40-12-0340-099
Lot 125 -Tax Parcel No. 40-12-0340-091
Lot 126 -Tax Parcel No. 40-12-0340-097
Lot 127 - Tax Parcel No. 40-12-0340-096
Lot 128 -Tax Parcel No. 40-12-0340-095
Lot 129 -Tax Parcel No. 40-12-0340-094
¦ Complete items 1, 2, and 3. Also complete.
Item 4 if Restricted DelKwy is deelred.
¦ Print your name and address on the reverse
so that we can return the card to you.
¦ Attach this card to the back of the mailpiece,
or on the front ff space permits.
1. Article Addressed to:
A. Sign
X M Agent
? Addressee'
B. RecN (mind Nam) C. Date of Delivery
I:fL
g
D. Is delivery address dlf from Item 1? ? Yes
If YES, enter delivery address below: ? No
Ca rf 15ite , rp /-7 Qi? ? 3. Matltiied Ms0 13 EWm Mail
? Registered O'Retum Receipt for Merchandise
13 Insured Mail 0 C.O.D.
4. Restricted Delivery? (Extra roe) Q Yes
2. Article Number 7003 1680 0006 5640 7454
(Transfer inxn service label)
PS Form 3811, February 2004 Domestic Retum Receipt 102595.024A.1540
?-
=
N
For deliver
information visit ourviebsite at
p y
-OFFICIAL
USE
Ln postage $
`D
O Certified Fee
Postmark
Q Return Redept F Here
(Endorsement Required)
C3 Restrfded Delivery Fee
4 (Endorsement Required)
..n
rl
.-
3z
Total Postage & Fees $
,
M
M enr To
C3
r
r`- sneer Apr --- ------ - -
oo
or PO Box No.
Clry. State. ZIP+4 - - 7 ----- -- -----------
EXHIBIT "B"
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Dnncannon, PA 17020
(7171834-9900
Varish Constracdon, Inc. Phone: 717-3347173
800 Bullfrog Road Job Name:
PA T.
submit specifications and estimated for. Westgate
Date 08/0 1/07
Note: All asphalt pricing in this proposal will be subject to escalation based on the published. Penn Dot Liquid asphalt index price at
the time of placement. Index price as of 07/31/07 is $328.00 a liquid ton Pipe and other material Prices are good for 30 days.
payment to be made within 10 days from date of invoice .
All materials stocked onsite are to be paid for due bD escalation costs.
Inspection and testing fees to be done by others.
Any soils to be deemed unsuitable will be dealt with on a cubic yard basis.
The grading may be altered from original plan due to areas that trees are to remain.
Wires and poles to be relocated by others.
Day schedule to complete job may altered due to in climate weather.
Bulk of clearing and silt fence done by others. Keystone hired at time and material to finish clearing.
Page 7 of 7
FPmpose ereby to furnish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Cents
e made as fol lows:
All material is guaranteed to be as specified All work to be
completed in a workmanlilte manner according to standard
practices. Any alteration or deviation from above
specifscabosa involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements.continget upon strikes,
accidents or delays beyond our control. Owner to carry fic?
tornado, \ and other necessary insurance. Our workers are
My covered by Workmen's Compensation and liability
Ace*awee of prapeed - The above prices, speci5a6ms and
waftom are satisfactory and are hereby aced. You are
audwrind to do the work as specified. Payment vdtl as Sri.
outlined above. /
Authorized
Signature:
Note: Tlds proposal may be withdrawn by us if not accepted within a days
c
Date of Acceptance: Signature:
CHANGE ORDER
Keystone Conte Inc.
Project: Westgate Change Order No. 0"I
bkistion Date: 06!11108
Project No:.
Ca uract For. Westgate
Contact Date:
The contract is changed as follows:
Electrical Excavation $36,520.00
Gas Excavation $32,520.00
Additional Water Lim and Valves $ 7,300.00
20 Rolls Straw Matting Erosion Blanket $ 96.0
Grub and Clear $14,348.75
Total Add $ 91,648.75
Not valid until signed byVarish Construction Inc.
The Original Contract Sum $1,475,000.00
Change by Previously authorised Charge Orders $ -0-
Net The Total contract Sum prior to this Change Order $1,475,000.00
The Contract Sum will be MWREASED) by this Change Order $ 91.648.75
The New Contract Sun including this Change Order $1,566,648.70
The Contract Time will be (unchanged) by (0) Dw
Varish Constrncdon Inc.
800 Bullfrog Road
Gettysburg, PA 17325
By:
Date
Contractor.
Keystone Contracting, Inc.
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 934-9900
I;: : vanish Construction, Inc. Phone: 717-334-7173 Date 08/01/07
Street goo Bullfrog Road job Name: westwe
C' Zip Gedysbu PA 17325 Job Location
Architect: Date o€Plr-- Job Phone:
We hereby submit specifications and e
EROSION CONTROL
3 Construction Entrances
1 Outlet Basin
1 Endwall
28 FT of 24 IN CAe
1 Skimmer
22800 SF Grass Lines Swales
Temporary Seed and Mulch
BULK EXCAVATION
Strip 42301 CY of Topsoil
105084 CY Bulk Grading
Place 105084 CY and Compact Fill
for, westpte
$ 4,500.00
$ 1,000.00
$ 850.00
$ 14.00
$' 1,021.00
$ 10,260.00
$ 3,000.00
$ 95,177.25
$309,997.80
$ 73,558.80
Propose hereby to furnish material and labor -
lete in accordance with above specifications, for the sum of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike maw according to standard Authorized
practices. Any alteration or deviation from above Signature:
specifications involvin extra costs will be executor only upon .
wrkttea orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikes,
accidw s or delays beyond our contmL Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workman's Compensation and Liability Note: This proposal may be
AceVw= of pnupood - The above prices, specifications and
gods are sausfi0ory and ace hereby accepted: Yen are
authorized to do the work as specified. Payment will be made as
outlined above. -
Date of Acceptance: Nk7- Signature:
-
us if not accepted wid& 30 days
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Dnncannon, PA 17020
71 834-9"0
phone: 717-334-7173 Done
Submitted To: Vanish Constu'ti Inc.
800 BullffM Road E I Job Name: westow
Sfre Job Location
Code: Gettysbur City State & zip PA 17325
7.a,1:
Date of Plans:
We hemby submit specifications and estimated for. Westgate
Mobilization
SANITARY SEWER
3422 FT of 8 IN SDR 0-10 w/bedding
525 Ft of 8 IN SDR 1042 w/be&Ung
140 FT of 8 IN SDR 12-14 w/bedding
2305 FT of 61N SDR Lateral 0-10
351 FT of 6 IN SDR Laterals 10-12
72 FT of 6 x 6 IN Wye Connections
169 Manholes
19 Flow Channels
1 Tie Into Existing Manhole
1 Stub and Plug Manhole
We. Propose hereby to fianish material and labor - complete in accordance
and 00
S 8,000.00
$ 73,846.76
$ 12,M.25
$ 3,956.40
S 38,009.45
S 6,233.76
S 2,880.00
S 27,040.00
S 2,565.00
$ 998.38
$ 1,000.00
above specifications, for the sum of
Payment to be made as follows:
All rogerial is .guaranteed to be as specified. All work to be
completed in a workmanlike manner wwrdmg to standard Authorized
practices. Any alteration or deviation from above Sim:
specifications involving extra costs will be executed.only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strAws,
accidents or delays beyond our control. Owner to carry fut,
tornado, \ and other necessary insurance. our workers are .
fully covered by Workmen's Compensation and Liability Note: This proper may be withdrawn by us if not accepted with 39 days
lox atx jr oproposal - The above MOM um
conditions am SAMI story and erne hereby aceepta YOU m
authorized to do the work as Signature:
l
SPGCffIC& M,
outlined above.
Date of Acceptance: 720--1 Smgn :
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Dnneannon, PA 17020
(717) 8349900
To:
Inc.
Job
717-334-7173 --- 1 Date 09/01/07
lCity, S gtp Code: Gettysburg, PA 17325
e...t? r Date Or Plans:
We hereby submit specifications and as
72 Test Tees
2 Test Per Temp Specs
MM SEWER
3914 Fr of 18 IN SUP
---------------
266 FT of 24 IN SUP 0-6
--------------
32 Fr of 24 IN SUP 6-8 .
172 FT of 30 IN SUP
14 Maaboles
245 Inlets
43 Flow Channels
------------
43 Inlet Protection
Remove I Inlet
We Propose hereby to furnish material and labor - complete
G?
S 2,880.00
$ 3,000.00
$ 83,36820
$ 7,049.00
$ 896.00
$ 5,736.20
S 2,100.00
S 36,750.00
$ 3,655.00
S 4,300.00
$ 500.00
with above specifications, for 1he sum of
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a vie manner according to standard Authorized
practices. Any alteration or deviaton firm above Signature:
moons involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikes,
accideotr or delays beyond our control. owner to carry fire,
tornado, \ and other necessary insurance. our workers are
fully covered by workmen's Compensation and Liability Note: This proposal may be withdrawn by us if not accepted within 300 days
,leoapow of p WmW - The above pnws, specHicMdOM and
ooaditioos are satis0actory and are hereby ac m Sign
sathattesd to do the work as specified. Payment
ouUmed above.
Date of Acceptance: b S :
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-9900
Submitted To: Varish Cons"!" Inc. Phone: 717=3347173 Dee 08/01/07
rCity, 800 BullfihM Road Job Nome: weswft
tateg? Ziv Code: Gettyqhn PA 17325 Job Location
A,dh Date of Plans: Job Phone.
We hereby submit specifications and estimated for: Westgate
$ 2,550.00
3 Endwall
$ 1,625.00
R-4 Rock
CULVERT WESTGATE DRIVE
$ I I,99T.60
90 FT OF 103 K 81 IN CIv1I'
$ 9,990.00
2 headwall and Endwmll
CULVERT PARKWAY DRIVE
$ 19,14120
180 F'T of 59 x 91 IN CMP
$ 15,720.00
2 headwall and Endwall
WATERLINE
$117,262.50
4425 FT of 12 IN PVC Main
$ 6,660.00
6 F'f of 12 IN MJ Gate Valves
$ 2,M.00
F6 FT' of 6 IN MJ Gate Valves
We Propose hereby to fumish material and labor - complete m ac cmdancx w& above specifications, for the sum of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed t0 be as specified All work to be
completed in a workmanlie manner according to standa}d Authnn=d
practices. Any alteration or deviation from above Signahm:
specifications involving ex" costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikers,
accidents or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability Nce. This proposal may be withdrawn by us if not accepted within 30 days
lea of pr+a and - The above pnces, spermcmons
cmd>fim we sasiafactwy and we hereby accepted. You are Signatare:
audcorned to do the worti as speciSed. Payment Will be nade as
outlined above. 1 r
k
Date a€ Acceptance: 9 / UT-D- Sigastrue:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-9900
Proposal Submitted To: Varish Inc. Phone: 717-334-7173 Date 0$/01/07
Street 800 Buff Road Job Name: Westuate
C' State & Zip Code: Gettysb? PA 17325 Job Location
s„rhiteett Date of Plow:_ Job Phone:
We hereby sabmtt ape
412x12MJTee
612 x 6 Hydrant. Tee
13 12 IN Bends
6 Fire Hydrant
and estimated for: Westgate
$ 1,2M.00
$ 1,920.00
$ 1,755.00
$ I4,400.00
4 Tie Into existing
12 Valve Boxes
I3 Thrust Blocking
2 Testing
WATER SE43 '/', IN She
33 FT'/+ IN rvice We Propose hereby to
and labor - complete m accordance with above
sad 90 Cents
$ 1,200.00
$ 3,250.00
$ 1,900.00
$ 20,425.00
$ 19,800.00
for the sum of
Payment to be made as follows:
All materiel is guaranteed to be as specified. All work to be
completed in a workmml?e mom er according to steridard Authorized
practices. Any alteration or deviation from above Sim;
specifications Mvolvmg extra costs will be executed only upon
written orders, another become an extra charge over and
above the estimate. All agceemects contmgmt upon sh% ms,
accidents or delays beyond our control. Owner to carry firs,
tornado, \ and other necessary insurance. Our workers are
fatly covered by workmen's Compensation and Liability Note: This proposal may be withdrawn by us if not accepted within 38
dece MMW of PVP=d - The above Prices, SWMCavaas am
condifiew are sdishe cry and ate hereby accepted. YOU are
authorised to do the vmt as Vwfd• Payment be made as Signature:
outlined above.
Date of Acceptance: signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove'Road
Duncannon, PA 17020
71 834-9900
To: Va Uh Construction, Iac. Phone: 717-3347173
& Zip Code: Gettysburg, PA 17325
rats of Plans:
We hereby submit specifications and estimated
CURBING
8835 SF Grade and Bacldll
8835 Ft of Rolled Concrete Curb
PAVING
16935 SY Fine Grade
16935 SY of 8 IN Crushed #4 Stone
16935 SY of 2 IN BCBC Paving
16935 SY of 1 IN Wearing Paving
TOTAL
Date 08/01/07
$ 15,46125
$ 78,189.75
$ 11,007.75
$ 114,31125
$ 105,504.75
$ 64,641.70
$1,475,000.00
Propose hereby to finnish material and labor - complete in accordance with above specifications, for the sum of-
and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed m a workmanlike manner according to stsadard Auihonmd
practices. Any alteration or deviation from above Sim:
specifications involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the ems. All agreements contingent upon strikes,
accidents or delays beyond our controL Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability Note: This. proposal may be withdrawn by us if not accepted within 3?0 days
40 f it laaloe of p vpwM - The above prices, specific MOM sad
waft m are salistac'.tmy and are hereby a=ptod. You are Sigumm l
as
mrthotmed to do the work as specified. ]=ec
outlined above.
ure:
Date of Acceptance: l Signat
westgate
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
(7171834-9900
Proposal Submitted To: Varir
Street: goo]
City, State & Zip Code: Gew
Architect: Date
we hereby submit specifications
Inc. Phone• 717-3347173 1 Date 08/01/07
17325 1 Job Location
and estimated for.
Job
F All asphalt pricing in this proposal will be subject to escalation based on the published Pam Dot Liquid asphalt index price at
e of placement. Index price as of 07131/07 is $328.00 a liquid ton. pipe and other material prices are good for 30 days.
Payment to be made within 10 days from date of invoice.
All materials stocked onsite are to be paid for due to escalation costs.
lnspection and testing foes to be done by others.
Any soils to be deemed unsuitable will be dealt with on a cubic yard basis.
The grading may be altered from original plan due tD areas that trees are to remain.
Wires and poles to be relocated by others.
Day schedule to complete job may altered due to in climate weather.
Bulk of clearing and silt fence done by odors. Keystone hired at time and material to finish clearing.
Page 7 of 7
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the 811111 Of
Dollars and 00 CezFb
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike manner according to standard
practices. Any alteration or deviation from above
specific domc involvigg extra costs will be executed only upon
written orders, and will become an coots charge over and
above the estimate. All agreements. contingent upon strikes,
accidents or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
filly covered by Workmen's Compensation and Liability
daoepaswe of propded - The above prices, spocM
=Witkms are ' and are hereby acexIe&
sadwriced to do the work as specified Psymart will
outlined above.
Date of Acceptance:
Authorized
Signature:
Note: This proposal may be withdrawn by us if not accepted within M days
ms and
You are
made as Side:
Signature:
4
CHANGE ORDER
Keystone Conte, Inc.
Project: Westgate Change Order No. 0"I
Initiation Date: 06111/08
Project No%
Cantracst For. westpte
Contract Date:
The contract is changed as follows:
Electrical Excavation $36,520.00
Gas Excavation $32,520.00
Additional water Line and Valves $ 7,300.00
20 Rolls Straw Matting Erosion Blanket $ 960.00
Grub and Clear $14,348.75
Total Add $ 91,648.75
Not valid until signed byVarish Construction Inc.
Contract Sum $1,475,000.00
The Original $ - 0 -
Net Change by InlevviouslY authOriud Change orders $1,475,000.00
The Total contact Sum prior to this Change Order $ 91.648.75
The Contract Sum will be MK REASED) by this Change Order ,566,648.70
The New Contract Sum including this Change Order $1,56 ?
The Contact Time will be (unchanged) by
Varish Construction Inc.
800 Bullfrog Road
Gettysburg, PA 17325
By:
Date
Contractor:
Keystone Contracting, Inc.
By:
Date
EXHIBIT "C"
Work Completed: Flat Rate:
Erosion Control
Installation of three construction $4,500.00
entrances
Installation of one outlet basin $1,000.00
Installation of endwall $850.00
Installation of 28 feet of 24 inch CMP $14.00
Installation of skimmer $1,021.00
Temporary seed and mulch $3,000.00
Bulk Excavation
Strip 42,301 cubic yards of topsoil $95,177.25
Bulk Grading of 105,084 cubic yards $309,997.80
Place and compact fill -105,084 $73,558.80
cubic yards
Mobilization $8,000.00
Sanitary Sewer
Installation of 3,422 feet of 8 inch $73,846.76
SDR 0-10 with bedding
Installation of 525 feet of 8 inch SDR $12,080.25
10-12 with bedding
Installation of 140 feet of 8 inch SDR $3,956.40
12-14 with bedding
Installation of 2,305 feet of 6 inch $38,009.45
SDR lateral 0-10
Installation of 351 feet of 6 inch SDR $6,233.76
laterals 10-12
% Completed: Amount Owed:
66.67 $3,000.00
100 $1,000.00
100 $850.00
100 $14.00
100 $1,021.00
50 $1,500.00
97.47 $92,772.51
99.22 $307,593.06
96.73 $71,153.26
69.94 $5,595.27
48.75 $36,000.00
74.92 $9,050.00
48.73 $1,927.86
39.46 $15,000.00
100 $6,233.76
.+
Installation of seventy-two 6 x 6 inch $2,880.00
Wye Connections
Installation of 169 vertical feet of $27,040.00
manholes
Installation of 19 manhole flow $2,565.00
channels
Installation of tie into existing $998.38
manhole
Installation of stub and plug manhole $1,000.00
Installation of 72 test tees $2,880.00
Sewer two test per temp specs $3,000.00
Storm Sewer
Installation of 3,914 feet of 18 inch $83,368.20
SLPP
Installation of 14 vertical feet of $2,100.00
manholes
Installation of 45 inlets $36,750.00
Culvert Westgate Drive
Installation of 90 feet of 103 x 81 $11,991.60
CMP
Installation of one headwall and $9,990.00
one endwall
Culvert Parkway Drive
Installation of 180 feet of 59 x 81 $19,141.20
inch CMP
Installation of one headwall and $15,720.00
one endwall
67.01 $1,930.00
31.8 $8,600.00
100 $2,565.00
100 $998.38
100 $1,000.00
67.01 $1,930.00
67 $2,010.00
47.34 $39,468.90
100 $2,100.00
44.02 $16,176.84
100 $11,991.60
100 $9,990.00
100 $19,141.20
100 $15,720.00
Water line
Installation of 4,425 feet of 12 inch $117,262.50
PVC main
Installation of six 12 inch MJ $6,660.00
Gate Valves
Installation of six 6 inch MJ $2,820.00
Gate Valves
Installation of four 12 x 12 MJ Tees $1,200.00
Installation of six 12 x 6 hydrant tees $1,920.00
Installation of thirteen 12 inch bends $1,755.00
Installation of six fire hydrants $14,400.00
Installation of four ties into existing $6,000.00
lines
Installation of 12 valve boxes $1,200.00
Installation of 13 thrust blocks $3,250.00
Water service
Installation of forty-two % inch $20,425.00
short service
Installation of thirty % inch long $19,800.00
service
Curbing
Grading and backfill of 8,825 lineal $15,461.25
feet
Installation of 8,835 lineal feet of $78,189.75
rolled concrete curbing
41.42
50
50
50
50
50
50
50
50
50
30
30
33.63
23.35
$48,684.90
$3,330.00
$1,410.00
$600.00
$960.00
$877.50
$7,200.00
$3,000.00
$600.00
$1,625.00
$6,127.50
$5,940.00
$5,200.00
$18,256.93
Paving
Installation of 16,935 square yards $11,007.75
of fine grade
Installation of 16,935 square yards $114,311.25
of 8 inch crushed #4 stone
Installation of 16,935 square yards $170,196.45
of 3 inch BCBC paving
Change order
Excavation for installation of $36,520.00
3,043 feet of electrical lines
Excavation for installation of $32,520.00
2,710 feet of gas lines
Installation of additional water lines $7,300.00
and valves
Installation of twenty rolls of straw $960.00
matting erosion blanket
Grub and clear $14,348.75
Installation of electrical crossing: $7,600.00
506 feet of pipe and stone bedding
Installation of gas crossing: $4,800.00
320 feet of pipe and stone bedding
Additional clearing work
Machine: Hourly Rate:
963 Cat Loader $100.00
Cat 953 Loader $90.00
Dump truck $65.00
35.6
35.6
35.6
100
100
100
100
100
100
100
Hours worked:
229.5
44.5
113.75
$3,918.27
$40,689.78
$60,582.34
$36,520.00
$32,520.00
$7,300.00
$960.00
$14,348.75
$7,600.00
$4,800.00
Amount owed:
$22,950.00
$4,005.00
$7,393.75
7 r'?
r.,? -7l
?-3 z
Ci7
r '?
?
a
c??= ?:a
? c
KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
: NO. 08-6912 MLD
: MECHANICS' LIEN CLAIM
ACCEPTANCE OF SERVICE
I, Robert Frey, Esquire, accept service of the Notice of Filing of Mechanics' Lien
Claim in the above-captioned matter on behalf of Elbert, L.P. and certify that I am
authorized to do so.
Date: _11 2_ y to By: ?.
Robert Frey, Esquire
Frey & Tiley
5 South Hanover Street
Carlisle, PA 17013-3307
Attorney for Owner,
Elbert, L.P.
Ml
CT q
s 0
KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
PRAECIPE TO SATISFY AND DISCONTINUE CASE
To the Prothonotary:
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
NO. 08-6912 MLD
MECHANICS' LIEN CLAIM
Please mark the above-captioned mechanics' lien claim satisfied, discontinued
and ended.
Respectfully Submitted,
WIX, WENGER & WI IDNER
Date: 11/7? X09
By:
1
JeffrCh ark, I.D. # 89277
508 econd Street
P.O. 5
Harrisburg, PA 17108-845
(717) 234-4182
Attorneys for Claimant
KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
: NO. 08-6912 MLD
MECHANICS' LIEN CLAIM
CERTIFICATE OF SERVICE
I hereby certify that the foregoing Praecipe to Satisfy and Discontinue Case was
sent by first class mail, postage prepaid this day to the following:
Robert G. Frey, Esquire
Frey & Tiley
5 South Hanover Street
Carlisle, PA 17013-3307
WIX, WENGER & WEIDNER
Date:
B
+Hrva Owi s-B ghman, Paralegal
508 North Second Street
P.O. Box 845
Harrisburg, PA 17108-0845
(717) 234-4182
Attorneys for Claimant
2
209 DEC -2 P 2: 2L)
$9.0o Pa ATT-/
0- RtoI