Loading...
HomeMy WebLinkAbout08-6917 KEYSTONE CONTRACTING, INC., Claimant, V. ELBERT, L.P., Owner IN THE COURT OF COMMON PLEAS, CUMBERLAND COUNTY, PENNSYLVANIA NO. p$ - 1o9 1#7 kLD : MECHANICS' LIEN CLAIM MECHANICS' LIEN CLAIM AND NOW, comes Claimant, Keystone Contracting, Inc., by and through its attorneys, Wix, Wenger & Weidner, and files this Mechanics' Lien Claim, stating as follows: 1. Claimant, Keystone Contracting, Inc., is a Pennsylvania corporation, which maintains its principal place of business at 51 Cove Road, Duncannon, PA 17020. 2. Claimant files this Mechanics' Lien Claim as a subcontractor. 3. The owner of the property subject to this lien is Elbert, L.P., a Pennsylvania limited partnership, which maintains its primary place of business at 7 Whispering Pines Lane, Carlisle, PA 17015 ("Owner"). 4. The date on which Claimant last performed work was May 27, 2008. Claimant did not complete all work on the property because Claimant was not paid the amount owed for its work despite Claimant's demands; and, Claimant was not provided with adequate assurance that it would be paid for the work performed. 5. Claimant provided formal notice of its intention to file a Mechanics' Lien Claim on August 11, 2008, via first class and certified mail. A copy of the notice is 1 attached hereto as Exhibit "A" and incorporated herein by reference as though fully set forth. 6. Claimant files this claim under a written contract with Varish Construction, Inc. (the "Contractor"), which served as contractor to Constantinos and Elaine Mallios, prior owners of the property subject to this lien, dated August 8, 2007 (the "Contract") wherein Claimant agreed to furnish the labor and materials necessary for the excavation, erosion control, sewer installation, storm sewer installation, grading, water line installation, curbing and paving, in connection with the improvement of the properties claimed to be subject to this lien, to prepare them for the erection and construction of residential homes, streets, and stormwater management. A copy of the Contract is attached hereto as Exhibit "B" and incorporated herein by reference as though fully set forth. 7. Contractor and Claimant agreed that Claimant would provide the labor and materials necessary to perform the work listed in the Contract. Contractor and Claimant agreed that the work would be performed at a flat rate, as shown in the Contract. 8. In addition, Contractor and Claimant agreed that Claimant would provide clearing work (digging out tree stumps, hauling tree stumps, burying tree stumps, and removal of trees) at an hourly rate for the machine and operator. 9. Pursuant to the Contract and subsequent agreement of the parties, Claimant performed the work as set forth on Exhibit "C," which is incorporated herein by reference as though set forth in full. 2 10. Claimant sent periodic invoices to Contractor for the portion of the work performed by the date of the invoice. The total amount billed for the work performed is $1,033,732.36. The total amount paid is $822,110.17. 11. The amount owed for the work performed is $211,622.19. The amount of this claim, after apportioning the total debt among the varying improvements, is $5,760.63. 12. The improvements and property claimed to be subject to the lien is situate in the Township of South Middleton Township, Cumberland County, Commonwealth of Pennsylvania, shown as Lot 127 on a Final Subdivision Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, and which has tax parcel number 40-12-0340-096. Respectfully Subrpitted, Date: " i ? <) /0 1? WIX, W5?MR/$ WEIDNER By: lark, I.D. # 89277 Je V 50 econd Street P. 5 Hair isburg, PA 17108-845 (717) 234-4182 Attorneys for Claimant 3 VERIFICATION I have reads the foregoing Mechanics' Lien Claim and hereby affirm and verify that, to the best of my knowledge, information and belief, all of the statements made therein are true and correct, and I acknowledge that false statements made therein may subject me to the penalties of 18 Pa.C.S. § 4904, relating to unsworn falsification to authorities. KEYSTONE CONTRACTING, INC. Date: II L 1 By: Debor h Frisch, President EXHIBIT "A" RICHARD H. WIX DEAN A. WEIDNER STEVEN C. WILDS THERESA L. SHADE WIX' DAVID R. GETZ STEPHEN J. DZURANIN JEFFREY C. CLARK PETER G. HOWLAND . Also Member Massachusen Bar (717) 234-4182 FAX (717) 234-4224 www.wwwpalaw.com THOMAS L. WENGER ROBERT C. SPITZER Of Counsel Suburban Office: 4705 DUKE STREET HARRISBURG, PA 17109-3041 (717) 652-8455 August 11, 2008 Elbert, L.P. 7 Whispering Pines Lane Carlisle, PA 17015 Via Certified and First Class Mail RE: Keystone Contracting, Inc. Formal Notice of Intent to File Mechanics' Lien Phases 5, 6, and. 7 of Westgate Development, Cumberland County, Pennsylvania Our File No.: 4920-15040 To Whom It May Concern: This firm represents Keystone Contracting, Inc. ("Keystone"). This is Keystone's formal notice of its intention to file a Mechanics' Lien against your properties owned by you, which are more particularly described on Exhibit "A attached hereto, for its work in connection with the improvement of the properties to prepare them for the erection and construction of homes. This notice is being served by Keystone as a subcontractor to Varish Construction, Inc., contractor to Constantinos J. Mallios and Elaine Mallios, prior owners of the properties. Keystone provided the excavation, erosion control, sewer installation, storm sewer installation, grading, water line installation, curbing and paving. Keystone completed its work on the project on May 27, 2008. Unless the amount of $211,622.19, due to Keystone for its work, is promptly paid, Keystone will file a Mechanics' Lien to secure payment for its work on the properties. Sincerely Wix, WE01e f & kVeidner JCC/hjob cc: Keystone Contracting, Inc. WIX, WENGER & WEIDNER A PROFESSIONAL CORPORATION ATTORNEYS AT LAW 508 NORTH SECOND STREET POST OFFICE BOX 845 HARRISBURG, PENNSYLVANIA 17108-0845 By: ark Exhibit A The following lots or tracts of land situate in the Township of South Middleton Township, Cumberland County, Commonwealth of Pennsylvania, shown on a Final Subdivision Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, as follows: Lot 120 -Tax Parcel No. 40-12-0340-103 Lot 121 Tax Parcel No. 40-12-0340-102 Lot 122 - Tax Parcel No. 40-12-0340-101 Lot 124 -Tax Parcel No. 40-12-0340-099 Lot 125 -Tax Parcel No. 40-12-0340-091 Lot 126 -Tax Parcel No. 40-12-0340-097 Lot 127 - Tax Parcel No. 40-12-0340-096 Lot 128 - Tax Parcel No. 40-12-0340-095 Lot 129 - Tax Parcel No. 40-12-0340-094 ¦ Complete items 1, 2, and 3. Also complete. Item 4 if Restricted Dellmy Is desired. ¦ Print your name and address on the reverse so that we can return the card to you. ¦ Attach this card*to the back of the malipiece, or on the front if space permits. 1. Article Addressed to: A. Sig X 13 ? Addressee B. R ( /Veme) C. Date of Delivery f - dg D. Is delivery address from kern 1 T ? Yes I I If YES, enter delivery address below: ? No Car[ (51e /-70/,,j5- 3. O SeI t fled Mall Ey3 ?glisss Mail ? Registered m Rerpt for M?handise 13 Insured Mail ? C.O.D. 4. Restricted Delivery? pit Fee) ? Y&y 2. Article frntrer Mmsfer sfer fiom servrce raa* 7003 1680 0006 5640 7454 (Tt?r PS Form 3811, February 2004 Domestic Return Receipt 1025e5-024A-1540 CER- (Domcs O ?OFFIC IAL US ..D Lrl Postage $ .A p Certified Fee O C3 Return RedW Fee Postmark (Endorsement Required) Here O 3 Restricted DeliveryFee (Endorsement Required) .A Total P ostage $ Fees . m C3 Sent o or PD Box No. Cl1y State. ZlP-4 -- - - ----°- -------- EXHIBIT "B" PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cote Road Duncannon, PA 17020 71 834-4900 Proposal Submitted To: Varish C nst uetion, Inc. Phone: 717-334-7173 Date 08101/07 Street: 800 Bul fro Road Job Name: Westgate City, State do Zip Code: Gettysburg, PA 17325 Job Location Architect: Date ofPlans: Job Phone: We hereby submit specifications and estimated for Westgate EROSION CONTROL 3 Construction Entrances $ 4,500.00 1 Outlet Basin $ 1,000.00 1 Endwall $ 850.00 28 FT of 24 IN CNP $' 14.00 1 Slimmer $' 1,021.00 228M SF Crass Lines Swales $ 10,260.00 Temporary Seed and Mulch $ 3,000.00 BULKEXCAVATION Strip 42301 CY of Topsoil $ 95,17725 105084 CY Bulk Grading $309,997.80 Place 105084 CY and Compact Fill $ 73,558.80 Pam l of 7 We Propose hereby to finnish material and labor - complete in accordance with above specifications, for the sum ofi Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanfilm manner according to standard Authorized practices. Any alteration or deviation from above Sigasarre: specifications involvilig extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to cagy fire, tornado, 1 and other necessary insurance. Our workers are fully covered by Workmen's Compensation and Liability Insurance. Nate: This proposal may be withdea!?n by us if not accepted within 3o days Aw w m of priapooal - The above prigs, specifications and cxmdidods ass satisficctory and are hereby accepted: You are Si nature: j g authorized to do the work as specified. Payment will be made as outlined above. t 5 i Date of Acceptance: ?'7 Signature: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 8349900 Proposal Submitted To: Vsiish Construction, Inc. Phone: 717-334-7173 Daft 08f41,1007 Street: 800 Bullft Road Job Name: Westgate City, Stets dt Zip Code: Gettysburg, PA 17325 Job Location Architect Die of Plan: job phone: We hereby submit specifications and estimated for. Westgate Mobilization S 81000.00 SANITARY SEWER 3422 Fr of 8 IN SDR 0-10 wftdding $ 73,846.76 525 Ft of 8 IN SDR 10-12 wedding S 12,08025 140 FT of 8 IN SDR 12-14 wAkIding S 3,956.40 2305 FT of 61N SDR Lateral 0-10 S 38,009.45 351 FT of 6 IN SDR Laterals 10-12 S 6,223.76 72 FT of 6 x 6 IN Wye Connections S 2,880.00 169 Manholes $ 27,040.00 19 Flow Channels S 2;565.00 1 Tie Into Existing Manhole $ 998.38 1 Stub and Plug Manhole $ 1,000.00 P e2of 7 We Propose hereby to hmish material and labor - complete m accordance with above specifications, for the sum of Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to stat?dard Authorized practices. Any alteration or deviation from above : specifications involving extra costs will be executed only Upw written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, \ and other necessary ummmc:e. Our workers are fully covered by Workmen's Compensation and Liability Insurance. Note: This may be withdrawn by us if not proposal accepted within 30 days Acag aasm of p "wal - The above pries, specifications mad conditions are satisf ctmy and are hereby accepted. You are Signature: ' mdwrbzd tU do the work as spaoffdied. Pay=t 1 made as outlined above. Date of Acceptance: c C> 1 Signature: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncanuon, PA 17020 71 834-9900 Pmposal Submitted To: Varish Construction, Inc. Phone: 717-3347173 Date 08/01/07 Street: 800 Bullfrog Road Job Name: Westgate City, State & Zip Code: Gettysburg, FA 17325 Job Location Architect: Deft of Plans: Job Phone: We haeby submit specifications and estimated for: westpte 72 Test Tees $ 2,880.00 2 Test Per Temp Specs $ 3,000.00 STOW SEWER 3914 FI' of I8 IN SUP $ 83,36820 266 FT of 24 IN SLPF 0-6 $ 7,049.00 32 Fr of 24 IN SUP 6-8 $ 896.00 172 Fr of 30 IN SUP $ 5,73620 14 Manholes $ 2,100.00 245 Inlets $ 36,750.00 43 Flow Channels $ 3,655.00 43 Inlet Protection $ 4,300.00 Remove I Inlet $ 500.00 P e3 7 We Propose hereby to furnish material and labor - complete m accordance with above specifications, for ihe sum of Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified All work to be completed in a workmanly manner according to std Authorized practices. Any alteration or deviation from above Sim: Veaficatiom involving extra costs will be owcuted only upon written orders, and will become an extra charge over and above the estimate All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tomado, \ and other necessary insurance. Our workers are fully covered by Workmen's Compensation and Liability Insurance. Note: This proposal may be withdrawn by us if not accepted within 30 days A of pvwd - The above prices, veedmboas and coos are sabshctwy and are hereby acxeptte& You are Signature: h ao4 orimd to do the work as specified Payment be as outlined above. Bate of Acceptance: ? ? '? She: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Dunewwon, PA 17020 71 834-9900 Proposal Submitted To: Varish Consirnction, Inc. Phone: 7173347173 Date 08/01/07 Street: 800 Bullfrog Road Job Name: westilste City, State & Zip Code: Gettysburg, PA 17325 Job Location Architect: Date of Plans: Job Phone: We hereby submit specifications and admatod for. Westgate 3 Endwall S 2,550.00 R4 Rock $ 1,625.00 CULVERT WESTGATE DRIVE 90 FT OF 103 X 81 IN CUP S 11,911.60 2 Headwall and Endwall $ 9,990.00 CULVERT PARKWAY DRIVE 180 FT of 59 x 81 IN CMP $ 19,141.20 2 Headwall and Endwall $ 15,720.00 WATERLINE 4425 Fr of 12 IN PVC Main $117,262.50 6 FT of 12 IN MJ Gate Valves $ 6;660:00 6 FT of 6 IN MJ Gate Valves $ 2,820.00 Pace 4 of 7 We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to st +d Authorized practices. Any alteration or deviation from above Signature: specifications involving extra costs will be executed only upon written orders, and will become an acts charge over and above the estimate All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, \ and other necessary insurance. Our workers are tirlly covered by Workmen's Compensation and Liability Insanenoe. Note: This proposal maybe withdrawn by us if not accepted within 30 days AcaVo tae of pnapmd - The above prices, specifications and cordons are sa fidaatory and we hereby accepted. You are Signature: th d d h , so orrm to o t e work as specified Payment he as outlined above. Date of Acceptance: Signature: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 834-9900 Submitted To: Varish Constaucdon, Inc. Phone: 717-334-7173 IMte 08/01/07 Street: 800 Bullfiv Road Job Name: Weswite City, State 8t Zip Code: Gftysburg, PA 17325 Job Location Architect" Date of Plans: Job Phone: We hereby submit specifications and estimated for. Westgate 412 x 12 MI Tee $ 1,200.00 6 12 x 6 Hydrant. Tee $ 1,920.00 13 12 IN Bends $ 1,755.00 6 Fire Hydrant $ 14,400.00 4 Tie Into existing $ 12 Valve Boxes $ 1,200.00 13 Thrust Blocking $ 3,250.00 .2 Testing $ 1,90 .00 WATER SERVICE 43 % IN Short service $ 20,425.00 33 FT % IN Long service $ 11,800.00 P 5 of 7 We Propose hereby to fUmish material and labor - complete in accomdanee with above specifications, for the sum of. Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmazi i m manner according to standard Authorized practices. Any alteration or deviation from above Signature: specifications involving extra costs will be executed only upon . written orders, and will become an extra charge over and above the estimate All agreements contingent upon strOces, accidents or delays beyond our control Owner to carry fire:, tornado, \ and other necessary insurance. Our workers are folly covered by Workmen's Coon and Liability Insurance. Note: This proposal may be withdrawn by us if not accepted within 30 days Aeaeparaee of p wpead - The above prices, specifications and condidow are satisfactory and are hereby accepted. You are authoriad to do the work as specified. Payment be made as Signature: outlined above. Date of Acceptance: Signature: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Dancannon, PA 17020 71 834-9900 hWmW Submitted To: Varish Constitution, Inc. Phone: 717-334-7173 Date 08/01/07 Street 800 Bullft Road Job Name: W City, State dt Zip Code: Gettysburg, PA 17325 Job Location Architect Date of Plans: Job Phone: We hereby submit specifications and estimated for. Westgate CURBING 8835 SF Grade and Backfill $ 15,46125 8835 Ft of Rolled Concrete Curb $ 78,189.75 PAVING ,16935 SY Fine Grade $ 11,007.75 16935 SY of 8 IN Crushed #4 Stone $ 114,311.25 16935 SY of 2 IN BCBC Paving $ 105,504.75 16935 SY of 1 IN Wearing Paving $ 64,691,70 TOTAL $1,475,000.00 Page 6 of 7 We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of: Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above spec fications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control Owner to carry fire, Authorized Signature: tornado, \ and other necessary insurance. Our workers are fully covered by Workmen's Compensation and Liability Insurance. Note: This proposal may be withdrawn by us if not accepted within V days Aeaepance of prnpaal - Ile above prices, specificed om and cwadtonns are satisfactory and we hereby accepted. You arc m dxrimd to do the wade as specified. Payment be as Signature: , outlined above. Date of Acceptance: (? 1 Signature: PROPOSAL & CONTRACT KEYSTONE CONTRACTING, INC. 51 Cove Road Duncannon, PA 17020 71 834-9900 hyposal Submitted To: Varish Consmiction, inc. Phone: 717-3347173 Date 08/01/07 Street: 800 Bullfrog Road Job Name: weftft City, State & Zip Code: PA 17325 Job Location Architect Date of Plans: Job Phone: We hereby submit specifications and estimated for. Westgate Note: All asphalt pricing in this proposal will be subject to escalation based on the published Penn Dot Liquid asphalt indax price at 1he time of placement. Index price as of 07/31/07 is $328.00 a liquid ton. Pipe and other material prices are good for 30 days. Payment to be made within 10 days from date of invoice. All materials stocked onsite are to be paid for due to escalation costs. Inspection and testing fees to be done by others. Any soils t0 be deemed unsuitable will be dealt wits on a cubic yard basis. The grading may be altered from original plan due t0 areas that trees are to remain. Wires and poles to be relocated by others. Day schedule to complete job may altered due to in climate weather. Bulk of clearing and silt fence done by others. Keystone hired at time and material to finish clearing. Page 7 of 7 ANY ROCK ENCOUNTERED WILL BE ADDITIONAL We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of Dollars and 00 Cents Payment to be made as follows: All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard Authorized practices. Any alteration or deviation from above Signature: specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, . accidab or delays beyond our control. Owner to carry .fire, tornado, \ and other necessary insurance. Our workers are fully covered by Worlmsen's Compensation and Liability Insurance. Note: This proposal may be withdrawn by us if not accepted within 30 days AeogoRaace of pnWand - The above prigs, specificom and waftow are sabs€actcxy and are hereby accepted You are Slgnatttre d d t d th k . wrra m D o e wor as specified. Payme as wa dined above. 71 Date of Acceptance: C) Ste; 9 CHANGE ORDER Keystone Conume& , Inc. Project: Westgate Change Order No. 08-01 Initiation Date: 06/11/08 Project No:. Contract For. westgate Contract Date: The contract is changed as follows: Electrical Excavation $36,520.00 Gas Excavation $32,520.00 Additional Water Line and Valves 5 7,300.00 20 Rolls Straw Matting Erosion Blanket $ 960.00 Grub and Clear $14,348.75 Total Add $ 91,648.75 Not valid until signed by Varish Construction Inc. The Original Contract son $1,475,000.00 Net Change by previously authorized Change Orders $ - 0 - The Total contract Sun prior to this Change Order $1,475,000.00 The Contract Sum will be M4CREASED) by this Change Order $ 91.648.75 The New Contract Sum including this Change Order $1,566,648.70 The Contract Time will be (unchanged) by (0) Days Vanish Construction Inc. 800 Bullfrog Road Gettysburg, PA 17325 By: Date Contractor: Keystone Contracting, Inc. By: Date EXHIBIT "C" Work Completed: Flat Rate: % Completed: Amount Owed: Erosion Control Installation of three construction $4,500.00 66.67 $3,000.00 entrances Installation of one outlet basin $1,000.00 100 $1,000.00 Installation of endwall $850.00 100 $850.00 Installation of 28 feet of 24 inch CMP $14.00 100 $14.00 Installation of skimmer $1,021.00 100 $1,021.00 Temporary seed and mulch $3,000.00 50 $1,500.00 Bulk Excavation Strip 42,301 cubic yards of topsoil $95,177.25 97.47 $92,772.51 Bulk Grading of 105,084 cubic yards $309,997.80 99.22 $307,593.06 Place and compact fill -105,084 $73,558.80 96.73 $71,153.26 cubic yards Mobilization $8,000.00 69.94 $5,595.27 Sanitary Sewer Installation of 3,422 feet of 8 inch $73,846.76 48.75 $36,000.00 SDR 0-10 with bedding Installation of 525 feet of 8 inch SDR $12,080.25 74.92 $9,050.00 10-12 with bedding Installation of 140 feet of 8 inch SDR $3,956.40 48.73 $1,927.86 12-14 with bedding Installation of 2,305 feet of 6 inch $38,009.45 39.46 $15,000.00 SDR lateral 0-10 Installation of 351 feet of 6 inch SDR $6,233.76 100 $6,233.76 laterals 10-12 Installation of seventy-two 6 x 6 inch $2,880.00 67.01 $1,930.00 Wye Connections Installation of 169 vertical feet of $27,040.00 31.8 $8,600.00 manholes Installation of 19 manhole flow $2,565.00 100 $2,565.00 channels Installation of tie into existing $998.38 100 $998.38 manhole Installation of stub and plug manhole $1,000.00 100 $1,000.00 Installation of 72 test tees $2,880.00 67.01 $1,930.00 Sewer two test per temp specs $3,000.00 67 $2,010.00 Storm Sewer Installation of 3,914 feet of 18 inch $83,368.20 47.34 $39,468.90 SLPP Installation of 14 vertical feet of $2,100.00 100 $2,100.00 manholes Installation of 45 inlets $36,750.00 44.02 $16,176.84 Culvert Westgate Drive Installation of 90 feet of 103 x 81 $11,991.60 100 $11,991.60 CMP Installation of one headwall and $9,990.00 100 $9,990.00 one endwall Culvert Parkway Drive Installation of 180 feet of 59 x 81 $19,141.20 100 $19,141.20 inch CMP Installation of one headwall and $15,720.00 100 $15,720.00 one endwall Water line Installation of 4,425 feet of 12 inch $117,262.50 PVC main Installation of six 12 inch MJ $6,660.00 Gate Valves Installation of six 6 inch MJ $2,820.00 Gate Valves Installation of four 12 x 12 MJ Tees $1,200.00 Installation of six 12 x 6 hydrant tees $1,920.00 Installation of thirteen 12 inch bends $1,755.00 Installation of six fire hydrants $14,400.00 Installation of four ties into existing $6,000.00 lines Installation of 12 valve boxes $1,200.00 Installation of 13 thrust blocks $3,250.00 Water service Installation of forty-two % inch $20,425.00 short service Installation of thirty % inch long $19,800.00 service Curbing Grading and backfill of 8,825 lineal $15,461.25 feet Installation of 8,835 lineal feet of $78,189.75 rolled concrete curbing 41.42 50 50 50 50 50 50 50 50 50 30 30 33.63 23.35 $48,684.90 $3,330.00 $1,410.00 $600.00 $960.00 $877.50 $7,200.00 $3,000.00 $600.00 $1,625.00 $6,127.50 $5,940.00 $5,200.00 $18,256.93 Paving Installation of 16,935 square yards of fine grade Installation of 16,935 square yards of 8 inch crushed #4 stone Installation of 16,935 square yards of 3 inch BCBC paving Change order Excavation for installation of 3,043 feet of electrical lines Excavation for installation of 2,710 feet of gas lines Installation of additional water lines and valves Installation of twenty rolls of straw matting erosion blanket Grub and clear Installation of electrical crossing: 506 feet of pipe and stone bedding Installation of gas crossing: 320 feet of pipe and stone bedding Additional clearing work Machine: 963 Cat Loader Cat 953 Loader Dump truck $11,007.75 35.6 $114,311.25 35.6 $170,196.45 35.6 $36,520.00 100 $32,520.00 100 $7,300.00 100 $960.00 100 $14,348.75 100 $7,600.00 100 $4,800.00 100 Hourly Rate: $100.00 $90.00 $65.00 Hours worked: 229.5 44.5 113.75 $3,918.27 $40,689.78 $60,582.34 $36,520.00 $32,520.00 $7,300.00 $960.00 $14,348.75 $7,600.00 $4,800.00 Amount owed: $22,950.00 $4,005.00 $7,393.75 „? -., ?? ? ?- t--a `?-? <? ?.7 r7 ? ?" 8 ,_ .? ?-. - ,7'i f ? / ?..., -. }'s ?\ f" I V ? a 7 ti? ? ?i , - _ ? a ., ?:; ? rp -,? ?:? _? ? ? KEYSTONE CONTRACTING, INC., Claimant, V. ELBERT, L.P., Owner IN THE COURT OF COMMON PLEAS, CUMBERLAND COUNTY, PENNSYLVANIA NO. 08-6917 MLD MECHANICS' LIEN CLAIM ACCEPTANCE OF SERVICE I, Robert Frey, Esquire, accept service of the Notice of Filing of Mechanics' Lien Claim in the above-captioned matter on behalf of Elbert, L.P. and certify that I am authorized to do so. Date: __? 7,\ By: Robert Frey, Esquire Frey & Tiley 5 South Hanover Street Carlisle, PA 17013-3307 Attorney for Owner, Elbert, L.P. ?'"; rv "rs _ ? wr ? „? r -`, ?a t_ - ..__. ` .. ?? ?' ?-, " __