HomeMy WebLinkAbout08-6918KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
NO. tq - 10q 1S ALD
MECHANICS' LIEN CLAIM
MECHANICS' LIEN CLAIM
AND NOW, comes Claimant, Keystone Contracting, Inc., by and through its
attorneys, Wix, Wenger & Weidner, and files this Mechanics' Lien Claim, stating as
follows:
1. Claimant, Keystone Contracting, Inc., is a Pennsylvania corporation, which
maintains its principal place of business at 51 Cove Road, Duncannon, PA
17020.
2. Claimant files this Mechanics' Lien Claim as a subcontractor.
3. The owner of the property subject to this lien is Elbert, L.P., a Pennsylvania
limited partnership, which maintains its primary place of business at 7 Whispering
Pines Lane, Carlisle, PA 17015 ("Owner").
4. The date on which Claimant last performed work was May 27, 2008. Claimant
did not complete all work on the property because Claimant was not paid the
amount owed for its work despite Claimant's demands; and, Claimant was not
provided with adequate assurance that it would be paid for the work performed.
5. Claimant provided formal notice of its intention to file a Mechanics' Lien Claim on
August 11, 2008, via first class and certified mail. A copy of the notice is
1
attached hereto as Exhibit "A" and incorporated herein by reference as though
fully set forth.
6. Claimant files this claim under a written contract with Varish Construction, Inc.
(the "Contractor'), which served as contractor to Constantinos and Elaine
Mallios, prior owners of the property subject to this lien, dated August 8, 2007
(the "Contract") wherein Claimant agreed to furnish the labor and materials
necessary for the excavation, erosion control, sewer installation, storm sewer
installation, grading, water line installation, curbing and paving, in connection with
the improvement of the properties claimed to be subject to this lien, to prepare
them for the erection and construction of residential homes, streets, and
stormwater management. A copy of the Contract is attached hereto as Exhibit
"B" and incorporated herein by reference as though fully set forth.
7. Contractor and Claimant agreed that Claimant would provide the labor and
materials necessary to perform the work listed in the Contract. Contractor and
Claimant agreed that the work would be performed at a flat rate, as shown in the
Contract.
8. In addition, Contractor and Claimant agreed that Claimant would provide clearing
work (digging out tree stumps, hauling tree stumps, burying tree stumps, and
removal of trees) at an hourly rate for the machine and operator.
9. Pursuant to the Contract and subsequent agreement of the parties, Claimant
performed the work as set forth on Exhibit "C," which is incorporated herein by
reference as though set forth in full.
2
10. Claimant sent periodic invoices to Contractor for the portion of the work
performed by the date of the invoice. The total amount billed for the work
performed is $1,033,732.36. The total amount paid is $822,110.17.
11. The amount owed for the work performed is $211,622.19. The amount of this
claim, after apportioning the total debt among the varying improvements, is
$5,760.63.
12. The improvements and property claimed to be subject to the lien is situate in the
Township of South Middleton Township, Cumberland County, Commonwealth of
Pennsylvania, shown as Lot 128 on a Final Subdivision Plan prepared by Herbert
Rowland & Grubic, Inc., dated February 17, 2006, as revised March 6, 2007,
recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59, and
which has tax parcel number 40-12-0340-095.
Respectfully Submitted,
Date: 1 \ i T-oID ?;
WIX, WENU81 WEIDNER
Je rk, I.D. # 89277
50 rth econd Street
P. ox 845
Harrisburg, PA 17108-845
(717) 234-4182
Attorneys for Claimant
By:
3
VERIFICATION
I have reads the foregoing Mechanics' Lien Claim and hereby affirm and verify
that, to the best of my knowledge, information and belief, all of the statements made
therein are true and correct, and I acknowledge that false statements made therein may
subject me to the penalties of 18 Pa.C.S. § 4904, relating to unsworn falsification to
authorities.
KEYSTONE CO
I?
Date: ? I ? ( By:
EXHIBIT "A"
RICHARD H. WIX
DEAN A. WEIDNER
STEVEN C. WILDS
THERESA L. SHADE WIX
DAVID R. GETZ
STEPHEN J. DZURANIN
JEFFREY C. CLARK
PETER G. HOWLAND
Also Menftr MauadwwU Bar
WIX, WENGER & WEIDNER
A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
508 NORTH SECOND STREET
POST OFFICE BOX 845
HARRISBURG, PENNSYLVANIA 17108-0845
(717) 234-4182
FAX (717) 234-4224
www.wwwpalaw.com
THOMAS L. WENGER
ROBERT C. SPITZER
Of Counsel
Suburban Office:
4705 DUKE STREET
HARRISBURG, PA 17109-3041
(717) 652-8455
August 11, 2008
Elbert, L.P.
7 Whispering Pines Lane
Carlisle, PA 17015
Via Certified and First Class Mail
RE: Keystone Contracting, Inc.
Formal Notice of Intent to File Mechanics' Lien
Phases 5, 6, and 7 of Westgate Development,
Cumberland County, Pennsylvania
Our File No.: 4920-15040
To Whom It May Concern:
This firm represents Keystone Contracting, Inc. ("Keystone"). This is Keystone's
formal notice of its intention to file a Mechanics' Lien against your properties owned by
you, which are more particularly described on Exhibit 'W, attached hereto, for its work in
connection with the improvement of the properties to prepare them for the erection and
construction of homes.
This notice is being served by Keystone as a subcontractor to Varish
Construction, Inc., contractor to Constantinos J. Mallios and Elaine Mallios, prior owners
of the properties. Keystone provided the excavation, erosion control, sewer installation,
storm sewer installation, grading, water line installation, curbing and paving.
Keystone completed its work on the project on May 27, 2008.
Unless the amount of $211,622.19, due to Keystone for its work, is promptly
paid, Keystone will file a Mechanics' Lien to secure payment for its work on the
properties.
Sincerely
Wix, W f e f & INeidner
By:
JCC/hjob J
cc: Keystone Contracting, Inc.
Exhibit A
The following lots or tracts of land situate in the Township of South Middleton Township,
Cumberland County, Commonwealth of Pennsylvania, shown on a Final Subdivision
Plan prepared by Herbert Rowland & Grubic, Inc., dated February 17, 2006, as revised
March 6, 2007, recorded May 21, 2007 in Cumberland County Plan Book 94, Page 59,
as follows:
Lot 120 - Tax Parcel No. 40-12-0340-103
Lot 121 -Tax Parcel No. 40-12-0340-102
Lot 122 - Tax Parcel No. 40-12-0340-101
Lot 124 -Tax Parcel No. 40-12-0340-099
Lot 125 -Tax Parcel No. 40-12-0340-091
Lot 126 -Tax Parcel No. 40-12-0340-097
Lot 127 -Tax Parcel No. 40-12-0340-096
Lot 128 - Tax Parcel No. 40-12-0340-095
Lot 129 - Tax Parcel No. 40-12-0340-094
• Complete Items 1, 2, and 3. Also complete
Item 4 if Restricted Delivery Is desited.
¦ Print your name and address on the reverse
so that we can return the card to you.
¦ Attach this card to the back of the mailpiece
or on the front If space permits.
1. Article Addressed to:
Piths zap&
Ca rf 15le 1-701
A. Sign
X X- -":?
Ar.
B. Re" by
D. Is delivery address dlf
If YES, enter delivery
? Agent
C. Date of Delivery
g ' Df
n item 1? ? Yes
below: ? No
3. Type
Z fled Mall ? Mail
? Registered m Reoso for Merchandise
? insured Mau ? C.O.D.
4. Restricted Delivery? Pit Fee) ? Yea
2. Article Number 7003 1680,
ffirwofer iron serwce label)
0006 5640 7454
PS Form 3811, February 2004 Domestic Retum R
ecarpt 102595•024A-1640
U.S. Poslial I-, tvice
?- CERTIFIED 'MAI ?:'-
u9 L REC e.
EI
(Domestic
p • F L ".
.A
to postage $
.A
C3
Certified Fee
M
C3
Reim Redept Fee
(Endorsement Required) Postmark
Here
M Restricted Delivery Fee
(Endoreemem Required)
..0 7
1-9 Total Postage & Fees 7 Z
M
C3 to l
---
or PO Box No. S / I?
GYty, Stare. Z! ----°-- - ----- ---------
EXHIBIT "B"
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-9900
Proposal Submitted To. Vanish Construction, Inc. Phone: 717-334-7173 Date 08/01/07
street: 900 Bullfrog Road Job Name: Westgate
City, State dt Zip Code: Gettysburg, PA 17325 Job Location
Architect: Date ofPlans: Job Phone:
We hereby submit specifications and estimated for. Westgate
EROSION CONTROL
3 Construction EnUmces $ 4,500.00
1 Outlet Basin $ 1,00v.00
1 Endwall S 850.00
28 FT of 24 IN CMP $ ' 14.00
1 Skimmer $ 1,021.00
228W SF Grass Lines Swales $ 10,260.00
Temporary Seed and Mulch S' 3,000.00
BULK EXCAVATION
Strip 42301 CY of Topsoil $ 95,17725
105084 CY Bulk Grading $309,997.80
Place 105084 CY and Compact Fill $ 73,558.80
P e 1 of 7
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike rummer according to standard
practices. Any alteration or deviation from above
specifications involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to carry fie,
Authonzed
Signature:
tornado, \ and other necessary insurance. Our workers are
fatly covered by Workmen's Compensation and Liability
Tna?„'or}
Note: This proposal may be with" by us if not accepted within ? days
Aeaag m of pmpmd - The above prices, specifications and
conditions are story and are hereby accgft& You are
eadmad to do the work as specified. Payment will be made as Signature:
outlined above.
Date of Acceptance: ?'? Signature:
j,
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
7114-9900
Proposal Submitted To: Varish Construction, Inc. Phone: 717-3347173 Daft 08/0,1/07
Street: 800 Bullfrog Road Job Name: westgaft
City, State dt Zip Code: PA 17325 Job Location
Architect" Date of Plans: Job Phone:
We hereby submit specifications and estimated for. Westgate
Mobilization $ 8,000.00
SANITARY SEWER
3422 FT of 8 IN SDR 0-10 w/bedding $ 73,846.76
525 Ft of 8 IN SDR 10-12 w/bedding $ 12,080.25
140 FT of 8 IN SDR 12-14 w/bedding $ 3,956.40
2305 FT of 6 IN SDR Lateral 0-10 $ 38,009.45
351 Fr of 6 IN SDR Laterals 10-12 S 6,233.76
72 FT of 6 x 6 IN Wye Connections S 2,880.00
169 Manholes $ 27,040.00
19 Flow Channels $ 2,565.00
1 Tie Into Existing Manhole $ 995.38
1 Stub and Plug Manhole $ 1,000.00
Page 2 o7
We. Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Ceab
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike manner according to standard Authorized
practices. Any alteration or deviation from above :
specifications involving extra costs will be executed.only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upam strikes,
accidents or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability
Note: This proposal may be withdrawn by us if not accepted within 38 days
nsurance.
I
AeeaepMance of p W=d - The above prices, specifications sad
conditions are sabsW ory and ace hereby accepted. You are
Signature: C
'
„
1 made as
sudwrizod to do the work as specified. Payment
outlined above.
Date of Acceptance: ,'? Signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cave Road
Dnncannon, PA 17020
71 834-9900
Proposal Submitted To: Verish Construction, Inc. Phone: 717-334-7173 Date 08/01/07
Street 800 BuUfiug Road Job Name: Westgate
City, State & Zip Code: Cletgmburg, PA 17325 Job Location
Architect Date of Plants: Job Phone:
We hereby submit specifications and estimated for: Westgate
72 Test Tees $ 2,880.00
2 Test Per Temp Specs $ 3,000.00
STOM SEWER
39914 FT of 18 IN SUP $ 83,36820
266 FT of 24 IN SLPP 0-6 $ 7,049.00
32 FT of 24 IN SUP 6-8 $ 8%.00
172 FT of 30 IN SUP $ 5,736.20
14 Manholes $ 2,100.00
245 Inlets $ 36,750.00
43 Flow Channels $ 3,655.00
43 Inlet Protection $ 4,300.00
Remove I Inlet $ 500.00
Pan 3 of 7
We Propose hereby to fimaish material and labor - complete in accordance with above specifications, for 1he sum of
DeBars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified All work to be
oompleted is a werkmanlike manner according to standard Authorized
practices. Any alteration or deviation fican above Sim:
specifications involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to curry fire,
tornado, \ and other necessary insurance. Our workers are
Tallynsurance. covered by Workmen's Compensation and Liability
I
Note: This proposal may be withdrawn by us if not accepted within 30 days
Aexepaeror of prgmW - The above pries, specifica m and
c onditioas we satist ac Cory and are hereby aaxpad. You are
Signature:
Milhorbod to do the work as specified. Payment be as
outlined above.
Date of Acceptance: (} `? Signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannen, PA 17020
71 8349900
Proposal Stied To: Varish Cm0ruction, Inc. Phone: 717-3347173 Date 08/01/07
Street 800 Bullfrog Road. Job Name: waftate
City, State & Zip Code: Ciettysbum PA 17325 Job Location
Architect Date of Plans: Job Phone:
We hereby submit specifications and estimated for. Westgate
3 Endwall $ 2,550.00
R4 Rock $ 1,625.00
CULVERT WESTGATE DRIVE
90 FT OF 103 X 811N CMP $ 11,911.60
2 Headwall and Endwatl $ 9,990.00
CULVERT PARKWAY DRIVE
180 FT of 59 x 91 IN CIvIP $ 19,14120
2 Headwall and Endwall $ 15,720.00
WATERLINE
4425 FT of 12 IN PVC Main $ 117,262.50
6 FT of 12 IN MJ Gate Valves $ 6,660.00
6 FT of 6 IN MJ Gate Valves $ 2,820.00
Pa2e 7
We Propose hereby to finish material and labor - complete in accordance with above specifications, for the an of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a wManeali m manner according to standard Authorized
practices. Any alteration or deviation from above signature:
specficatiens involving extra com will be. executed only upon
written orders, and will become an an charge over and
above the estimate. All agreements contingent upon strikes, .
accidents or delays beyond our control. Owner to carry fire,
tornado, \ and other necessary insurance. Our workers are
folly covered by Workmen's Compensation and Liability
insurance.
Neu: This proposal may be withdrawn by us;fnot accepted within 30 days
Acarpamror of pngemd - The above prices, spedficodons and
wnftcao-s are savory and are b reby accepted. You are
Srgnab e:
audwiad to do the work as specified. Payment be . as
outlined above
.
Date of Acceptance: (? Signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
71 834-9900
Submitted To: Varish Construction, Inc. Phone: 717-334-7173 Date 08/01/07
Street goo Bullfio Road Job Name: Weftate
City, State 8c Zip Code: GettysbaM PA 17325 Job Location
Architect: Date of Plans: Job Phone:
We hereby submit specifications and estimated for. weatgate
412 x 12 MY Tee $ 1,200.00
6 12 x 6 Hydrant Tee $ 1,920.00
13 12 IN Bends $ 1,755.00
6 Fire Hydrant $ 14,400.00
4 Tie Into existing $
12 Valve Boxes $ 1,200.00
13 Thrust Blocking $ 3,250.00
2 Testing $ 1,900.00
WATER SERVICE
43 % IN Short service $ 20,425.00
33 FT % IN Long service $ 11,800.00
F e5of 7
We Propose hereby to fiimish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike manner according to standard Authorized
practices. Any alteration or deviation from above Signature:
specifications involving extra costs will be executed only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control. Owner to cagy firs,
tornado, \ and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability
Insurance. Note: This proposal may be withdrawn by us if not accepted within 300 days
Acaepemroe of P VPqMd - The above prices, and
conditions art say cad aye hereby accepted. You are
mrthorized to do the work = specified. Payment be made as Signature:
outlined above.
Date of Acceptance: Signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Dnncannou, PA 17020
71 834-9900
Proposal Submitted To: Varish Consftuction, Inc. Phone: 717-3347173 Date 08/01/07
Strout 800 Bullfrog Road Job Name: Westgate
City, State & Zip Code: Gettysburg, PA 17325 Job Location
Architect Dam of Plans: Job Phone:
We hereby submit specifications and estimated for: Westgate
CURBING
8835 SF Grade and Backfill $ 15,46125
8835 Ft of Rolled Concrete Curb $ 78,189.75
PAVING
16935 SY Fine Grade $ 11,007.75
16935 SY of 8 IN Crushed #4 Stone $ 114,31125
16935 SY of 2 IN BCBC Paving $ 105,504.75
16935 SY of 1 IN Wearing Paving $ 64,691.70
TOTAL 51,475,000.00
P e6of7
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified. All work to be
completed in a workmanlike manner according to standard
practices. Any alteration or deviation from above
specifications involving extra costs will be execute only upon
written orders, and will become an extra charge over and
above the estimate. All agreements contingent upon strikes,
accidents or delays beyond our control Owner to carry fire,
Authorized
Sigw mre:
tornado, 1 and other necessary insurance. Our workers are
fully covered by Workmen's Compensation and Liability
Insurance.
Note: This proposal may be withdrawn by us if not accepted within 30 days
Aeooaaaee of Proposal - The above prices, specification and
conditions are satesf curvy and . are hereby accepted. You are
autbartzed to do the work as specified. Payment be as Signature:
outlined above. 1
Date of Acceptance: (? 1 Signature:
PROPOSAL & CONTRACT
KEYSTONE CONTRACTING, INC.
51 Cove Road
Duncannon, PA 17020
(717)8 04-990
Proposal Submitted To: Varish Conetrvc6 Inc. Phone: 717-3347173 Date 08/01/01
Street: 800 Bullfrog Road Job Name: Westgate
City, State & Zip Code: Gettysburg, PA 17325 Job Location
Architect: Date of Plans: Job Phone:
We hereby submit specifications and estimated for. Westgate
Note: All asphalt pricing in this proposal will be subject to escalation based on the published Pam Dot Liquid asphalt index price at
the time of placement. Index price as of 07/31/07 is $328.00 a liquid ton. Pipe and other material prices are good for 30 days.
Payment to be made within 10 days from date of invoice.
All maberials stocked: onsite are to be paid for due to escalation costs.
inspection and testing fees to be done by others.
Any soils to be deemed unsuitable will be dealt with on a cubic yard basis.
The grading may be altered from original plan dine to areas that trees are to remain.
Wires and poles to be relocated by others.
Day schedule to complete job may altered due to in climate weather.
Bulk of clearing and silt fence done by others. Keystone hired at time and material to finish clearing.
Page 7 of 7
ANY ROCK ENCOUNTERED WILL BE ADDITIONAL
We Propose hereby to furnish material and labor - complete in accordance with above specifications, for the sum of
Dollars and 00 Cents
Payment to be made as follows:
All material is guaranteed to be as specified All work to be
completed in a vie mariner according to standard Authorized
practices. Any alteration or deviation from above Signature:
specifications involving extra costs will be executed only upon
written orders, and will bwome an extra charge over and
above the estimate. All agreements contingent upon strilces,
accidents or delays beyond our control. Owner to carry .far,
.tornado, \ and other necessary insurance. Our workers are
frilly covered by Workmen's Compensation and liability
insurance. Note: This proposal may be withdrawn by us if not accepted within 3e days
Acvgww" of p vposW - The above prices, specificxdans and
condom are satishetoryy and are hereby accepted. You are
Signature:
i
d
m
aa
zed to do the work as specified. Payme
as
outlined above.
71
Dater of Acceptance: U Signature:
9
CHANGE ORDER
Keystone Conumedog, Inc
Project. Westgate Change Order No. 0"I
Initiation Date: 06111/08
Project No%
Ca &act For. Westgate
Ca genet Date:
The contract is changed as follows:
Electrical Excavation $36,520.00
Gas Excavation $32,520.00
Additional Water Line and Valves $ 7,300.00
20 Rolls Straw Matting Erosion Blanket $ 960.00
Grub and Clear $14,348.75
Total Add $ 91,648.75
Not valid until signed byVarish Construction Inc.
The Original Contract Sun $1,475,000.00
Net Change by previously authorized Change Orders $ - 0 -
The Total contract Stun prior to this Change Order $1,475,000.00
The Contract Sum will be (INCREASED) by this Change Order $ 91.648.75
The New Contract Sum including this Change Order $1,566,648.70
The Contract Time will be (unchanged) by (0) Days
Varish Contraction Inc.
800 Bullfrog Road
Gettysburg, PA 17325
By:
Date
Contractor:
Keystone Contracting, Inc.
By:
Date
EXHIBIT "C"
Work Completed: Flat Rate:
Erosion Control
Installation of three construction $4,500.00
entrances
Installation of one outlet basin $1,000.00
Installation of endwall $850.00
Installation of 28 feet of 24 inch CMP $14.00
Installation of skimmer $1,021.00
Temporary seed and mulch $3,000.00
Bulk Excavation
Strip 42,301 cubic yards of topsoil $95,177.25
Bulk Grading of 105,084 cubic yards $309,997.80
Place and compact fill - 105,084 $73,558.80
cubic yards
Mobilization $8,000.00
Sanitary Sewer
Installation of 3,422 feet of 8 inch $73,846.76
SDR 0-10 with bedding
Installation of 525 feet of 8 inch SDR $12,080.25
10-12 with bedding
Installation of 140 feet of 8 inch SDR $3,956.40
12-14 with bedding
Installation of 2,305 feet of 6 inch $38,009.45
SDR lateral 0-10
Installation of 351 feet of 6 inch SDR $6,233.76
laterals 10-12
% Completed: Amount Owed:
66.67 $3,000.00
100 $1,000.00
100 $850.00
100 $14.00
100 $1,021.00
50 $1,500.00
97.47 $92,772.51
99.22 $307,593.06
96.73 $71,153.26
69.94 $5,595.27
48.75 $36,000.00
74.92 $9,050.00
48.73 $1,927.86
39.46 $15,000.00
100 $6,233.76
Installation of seventy-two 6 x 6 inch $2,880.00 67.01 $1,930.00
Wye Connections
Installation of 169 vertical feet of $27,040.00 31.8 $8,600.00
manholes
Installation of 19 manhole flow $2,565.00 100 $2,565.00
channels
Installation of tie into existing $998.38 100' $998.38
manhole
Installation of stub and plug manhole $1,000.00 100 $1,000.00
Installation of 72 test tees $2,880.00 67.01 $1,930.00
Sewer two test per temp specs $3,000.00 67 $2,010.00
Storm Sewer
Installation of 3,914 feet of 18 inch $83,368.20 47.34 $39,468.90
SLPP
Installation of 14 vertical feet of $2,100.00 100 $2,100.00
manholes
Installation of 45 inlets $36,750.00 44.02 $16,176.84
Culvert Westgate Drive
Installation of 90 feet of 103 x 81 $11,991.60 100 $11,991.60
CMP
Installation of one headwall and $9,990.00 100 $9,990.00
one endwall
Culvert Parkway Drive
Installation of 180 feet of 59 x 81 $19,141.20 100 $19,141.20
inch CMP
Installation of one headwall and $15,720.00 100 $15,720.00
one endwall
Water line
Installation of 4,425 feet of 12 inch $117,262.50 41.42 $48,684.90
PVC main
Installation of six 12 inch MJ $6,660.00 50 $3,330.00
Gate Valves
Installation of six 6 inch MJ $2,820.00 50 $1,410.00
Gate Valves
Installation of four 12 x 12 MJ Tees $1,200.00 50 $600.00
Installation of six 12 x 6 hydrant tees $1,920.00 50 $960.00
Installation of thirteen 12 inch bends $1,755.00 50 $877.50
Installation of six fire hydrants $14,400.00 50 $7,200.00
Installation of four ties into existing $6,000.00 50 $3,000.00
lines
Installation of 12 valve boxes $1,200.00 50 $600.00
Installation of 13 thrust blocks $3,250.00 50 $1,625.00
Water service
Installation of forty-two % inch $20,425.00 30 $6,127.50
short service
Installation of thirty 3/ inch long $19,800.00 30 $5,940.00
service
Curbing
Grading and backfill of 8,825 lineal $15,461.25 33.63 $5,200.00
feet
Installation of 8,835 lineal feet of $78,189.75 23.35 $18,256.93
rolled concrete curbing
Paving
Installation of 16,935 square yards $11,007.75 35.6 $3,918.27
of fine grade
Installation of 16,935 square yards $114,311.25 35.6 $40,689.78
of 8 inch crushed #4 stone
Installation of 16,935 square yards $170,196.45 35.6 $60,582.34
of 3 inch BCBC paving
Change order
Excavation for installation of $36,520.00 100 $36,520.00
3,043 feet of electrical lines
Excavation for installation of $32,520.00 100 $32,520.00
2,710 feet of gas lines
Installation of additional water lines $7,300.00 100 $7,300.00
and valves
Installation of twenty rolls of straw $960.00 100 $960.00
matting erosion blanket
Grub and clear $14,348.75 100 $14,348.75
Installation of electrical crossing: $7,600.00 100 $7,600.00
506 feet of pipe and stone bedding
Installation of gas crossing: $4,800.00 100 $4,800.00
320 feet of pipe and stone bedding
Additional clearing work
Machine: Hourly Rate: Hours worked: Amount owed:
963 Cat Loader $100.00 229.5 $22,950.00
Cat 953 Loader $90.00 44.5 $4,005.00
Dump truck $65.00 113.75 $7,393.75
?`,a
cn7)
c >
Cn
.... o
KEYSTONE CONTRACTING, INC.,
Claimant,
V.
ELBERT, L.P.,
Owner
IN THE COURT OF COMMON PLEAS,
CUMBERLAND COUNTY, PENNSYLVANIA
NO. 08-6918 MLD
: MECHANICS' LIEN CLAIM
ACCEPTANCE OF SERVICE
I, Robert Frey, Esquire, accept service of the Notice of Filing of Mechanics' Lien
Claim in the above-captioned matter on behalf of Elbert, L.P. and certify that I am
authorized to do so.
Date: /? Z y r----
By: A A
Robert Frey, Esquire
Frey & Tiley
5 South Hanover Street
Carlisle, PA 17013-3307
Attorney for Owner,
Elbert, L.P.
! ?
{..? ?
G:1 1.,?
{y?.?ay(
4 l „?. ?'"?"r
?+ ?-?
?-
??
J t'-':. ?? Vii.
??
?1