HomeMy WebLinkAbout14-7302 KENNETH BAKER t/d/b/a SCE CONSTRUCTION IN THE COURT OF COMMON PLEAS Of CUMBERLAND Claimant COUNTY,PENNSYLVANIA V. CIVIL DIVISION ROBERT PRESTON and LORRIE PRESTON, ,,/� c _ Husband and Wife y� 73d-2 /"lam Owner �r'' m M== ' N--'iC'"7 Q MECHANICS' LIEN CLAIM 3>25 Claimant, Kenneth Baker, t/s/b/a SCE Construction, through his undersigned counsel, hereby brings this Mechanics' Lien Claim as follows: 1. Claimant SCE Construction ("claimant") is a sole proprietorship with his principal place of business at 439 Market Street, New Cumberland, PA 17070. ,2. The owner or reputed owner of the property subject to the lien is Robert Preston and Lorrie Preston, husband and wife, who reside at 289 Founders Way, West Mechanicsburg, Cumberland County, Pennsylvania. 3. On or about September 15, 2014, Claimant last provided labor and materials for and performed work at the subject property for which this claim is made. %� cet ys'�s t 4. Claimant files this claim under a written contract dated July 11, 2014, and amendments thereto, whereby claimant agreed to provide and furnish certain labor, material and services including, among other things, installation of cabinetry, counters, appliances, wood flooring, tile work, plumbing and installation of kitchen and bath accessories, drywall, radiant heating system, electrical work and other carpentry work, all of which were installed or performed by claimant and incorporated into owners' dwelling located at 289 Founders Way, Mechanicsburg, Cumberland County, Pennsylvania. The kind and character of Claimant's work are more fully set forth in the original contract and additional statements thereto. A true and correct copy of these documents is attached hereto as Exhibit "A".. 5. The amount which continues to be due and owing to Claimant is $6,917.00. 6. Claimant is the sole contractor and therefore no Notice of Intention to file a Mechanics' Lien is required. 7. The improvements and property claimed to be subject to the lien is located at 289 Founders Way, Mechanicsburg, Pennsylvania and bearing a tax parcel identification number 38-23-0571-001.U101. The property is more fully described in the legal description attached hereto as Exhibit "B", and is incorporated herein by reference. WHEREFORE, Claimant, Kenneth Baker, t/s/b/a SCE Construction claims a lien upon the premises herein described in the amount of$6,917.00, plus interest and costs, against the owners. Respectfully submitted, R.4, ,Maromas, Esquire Attorney for Claimant ID #41301 101 South Market Street Mechanicsburg, PA 17055 Telephone: (717) 796-2100 Fax: (717) 796-3600 Email: rmarkthomas@ mail com VEMEICATION I verify that the statements made in the foregoing Mechanics' Lien Claim are true and correct to the best of my knowledge, information and belief. I understand that false statements herein are made subject to the penalties of 13 Pa. C.S. § 4904, relating to unsworn falsification to authorities. Date: y KENNETH B. BAKER � s _ g.;..��" i �?r+��Fzp�� � � ,; air "�-#�� �s � � � � '��, - r�/,�•� �R `STO I rHu-jEr M Bob & Lorrie Preston July 2014 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 Kenneth_baker17(@gmail coni Ex A 0 , P , e SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 Kennethbaker17 c,email corn COVER PAGE OVERVIEW OF COSTS • Total estimated cost for enclosed project $ 76.175.00 a. Estimated customer responsibility for materials$38,500.00 b. Estimated materials contractor will be purchasing and seeking reimbursement. $ 7,400.00 c. Total labor estimated costs based on calculated man hrs and multi-task projects and said materials.$ 29,900.00 d. Drawing for project foot print. $ 375.00 1 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 Kennethbakerl7(@gmail.com Project overview Date July 10 2014 Bob and Lorrie Preston 289 Founders way West Mechanicsburg Pa 717-580-8993 Dear Bob and Lorrie, Enclosed are the details for the project which include a description of the demolition, details as to work preformed for each room of the home,cost and responsibilities as to labor and materials. The general outline initials bullets for easier review and reference. 1. Project responsibilities as to labor and material cost: Customer,is responsible for material cost as well as appliances. 2. As discussed in our last meeting being that I am passing on my cost for material I'have suggested that you as the customer will provide all major materials. 3. Customer will have access to contractor cost for all accounts in which I have an established house account. 4. Contractor will provide details and specification for customer to purchase such material. S. Customer is responsible for choosing the selection of material. Estimated cost of materials is based availability, special order,brand, and quality. Estimated cost$ 38,500.00 a. Cabinets, knobs,trim and accessories......11,500.00 b. Counters kitchen .........3800.00 c. Fixtures (toilets) .......300.00.. d. Facets( kitchen, bath x3) ......325.00 e. Appliance ....7000.00 f. Kitchen sink .....400.00 g. Vanity tops x3 .......850.00 h. Bath accessories........175.00 i• Wood flooring, ...... 7,800.00 j. Carpet k. Tile .....350.00 I. paint, 6000.00 m. light fixtures, 2 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 Kennethbakerl7(@gmail.com 717 636 4805 n. canister baffles o. Tile for bath floors and back splash. p. Lock sets and hinges for doors. q. Mirrors r. Ceiling fans S. Front bath shower/tub valve kit 6. Contractor will be responsible for construction material such as a. Electrical rough wiring b. Rough in ceiling canisters c. Gang boxes for switches d. Rough in plumbing and Pex e. Concrete f. Insulation g. Rental equipment for floor 7. Contractor will be responsible to pick up following materials and will be compensated for:All products provided by contractor is of top quality and specific to customers request. The estimated cost of compensated materials............................$ 7,400.00 a. Drywall, compound, tape 150.00 b. Pocket door and hardware 250.00 C. Selected light switches 65.00 d. Tile adhesives,grout and sealant 365.00 e. Finish shut off valves, exposed pluming 125.00 f. Finish trim material for knee wall,%" round white base for wood floor,5-1/4" base molding and crown molding for ceiling. 1775.00 g. True Heat radiant heat elements and controls 1625.00 h. Modified thin set for tile and radiant 265.00 i. Closet shelving allowance throughout. 500.00 j. Exhaust fan and vent for attic 375,00 k. Garage floor sealer and finish 295.00 I. Gas line, manifold and fittings for stove. (3Sft)475.00 m. Floor sealant and adhesive 780.00 n. Laundry area wash tub and facet 75.00 o. New dryer vent kit 35.00 P. Miscellaneous 250.00 3 SCL CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 Kennethbakerl7@gmail com 717 636 4805 8. Labor cost: a. Total estimated labor costs based on calculated man hours and multi-task skilled projects said materials provided is $29,900.00 b. Estimated set labor cost is based on the enclosed description of work preformed. c. All work not included in work description outline may be submitted as additional labor. d. Deposit of$10,000.00 made July 7th 2014. e. A requested draw of$2,500.00 per week for the next 6 weeks. Balance of$4,500.00 and any difference of labor for additional work other then in description will be added to the final balance. f. Any change to amount in item A. ($29,900.00)will be submitted for approval. g. All material contractor purchases for project (item 7)and is in material description may request payment throughout project and balance at end of project. h. Project plans and drawing created for cabinet layout, column views radiant heat submittal,and viewing. $375.00. Unless otherwise revised this will be the total amount owed for foot print awi 9- b Pr. ton , Date Lorrie Preston Date —7--1/-/41 Date � �f Kenneth Baker SCE construction 4 �'u ►� SCE CONSTRUCTION Za t Kenneth B Baker 2848 Orchard{_ane 7 b t �B l E� Middletown Pa 17057 Kennethbaker17C@9maiitorr, 717 636 4805 Demolition to be completed as part of the estimated labor cost. Note that all product that is to be removed will not be reinstalled unless otherwise specified. 1. Demolition and removal of the following: a. Master Bath. ( Nothing is to be reused) i. Partial wall between toilet and main bath area. ii. Closet area and half wall adjoining shower wall iii. Vanity, counter, facet, mirror, light bar. iv. All accessories v. Door hardware vi. Shower is not to be removed. vii. Tile floor viii. Base molding ix. Re-use existing shutoff valves if possible. x. Toilet b. Master Hall Area. i. Existing entry door and frame to master suite common area. ii. Part of wall section in hall and closet area to accommodate for new pocket door. iii. Remove all carpeting,padding and tack strips iv. All closet shelving. (save for possible-use) v. Ceiling light fixture and switch in enclosed ceiling area. DO not relocate switch. C. Master Bedroom ( Nothing to be reused) i. Remove carpet and padding and tack stripping ii. Remove ceiling fan. d. Living Room And Dinning i• Remove all carpeting, padding and tack stripping ii. Remove column areas to master bed room suite Remove 2/3rds of wall adjoining living room and laundry hall. iv. Remove bulkhead area above foyer area and living room ceiling. v. Remove and lower fire place mantel. vi. Remove door/way section between dinning area and kitchen. Reduce part of wall to a knee wall for new counter for kitchen counter. e. Foyer Area i. Remove wood flooring ii. % round molding only iii. Remove water damaged drywall area and concrete flooring for repair. This problematic repair is do to existing issue caused by builder and plumber. iv. Remove all hardware from doors v. Closet shelving 5 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Ra 17057 Ken nethbakeq mail.com 717 636 4805 f Common Bath Area i. Remove vanity, counter and fixture ii. Toilet iii. Mirror iv. Med cabinet V. All accessories vi. Tile flooring vii. Do Not remove tub shower unit viii. All hardware. g• Front Bedroom i. Remove carpet and tack strip ii. Closet shelving iii. All hardware iv. Ceiling fan h. Sun Room i. Vinyl flooring ii. Ceiling fan '��• %round i• Kitchen Area �• All cabinets ii. Counters Tile back splash iv. Ceiling lighting v Garbage disposal vi. Vinyl flooring vii. Appliances Viii. Wall partition removed to extend cantilevered counter, and side of pantry cabinet wall removed. J• Laundry Room Area i. Vinyl flooring ii. Door hardware iii. Security system panel. To be installed by others. 6 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 Kennethbaker17@gmaii.com Project description initials labor performed, material included in labor estimate, customers responsibilities.Any changes to this description will be updated for approval prior to making change. 1. MASTER BATHROOM SUITE AREA. a. Labor Allowances: i. Wiring relocation for vanity(s) lighting and 2 GFCI ii. Relocate as needed plumbing water and waste for new vanity and relocation of toilet iii. Relocate existing light box and outlet box for new vanity iv. Install new junction light box and GFIC outlet. v. Install new facets and traps for two vanities. vi. Pex or copper may be used for rework. vii. Patch removed concrete areas as needed. Prep for radiant floor heat. viii. Radiant heat installed in floor specific location. Will confirm with customers. ix. Installation of two new vanity bases with molded counter bowels. x. Installation of toilet and water supply. xi. Installation of Vanity mirrors and light bars. xii. Center light over toilet with dedicated switch xiii. Existing Newton replaced without heat element. xiv. New tile flooring,grout and seal.Size, color and grout to be determined by customer. xv. Painting to provide by others. xvi. Remove main entrance door to suite and replace with new pocket door unit. xvii. Replace closet shelving for the two master suite closets. xviii. Master bedroom fans blades to be removed and painted to match existing trim. xix. Seal and patch existing concrete slab xx. Install new bath accessories b. Material Includes: i. All rough plumbing supplies required for waste and water supplies including finished supply valves. ii. All Electrical supplies for relocation,GFIC,switches,and radiant heating Cabinet trim will be part of cabinet order. Existing outlets and switches will remain unless otherwise noted. iii. traps for two vanities iv. Tile adhesive and sealant. v. Material for concrete patching,sealing and finishing sub concrete. vi. Radiant flooring material 7 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 I<ennethbakerl7@gmail.com c. Customer supplies: i. Light fixtures for vanities ii. Two Mirror slabs (no med cabinets) iii. Prime, Paint and material by others iv. Cabinets and hardware v. Counter tops vi. Floor tile (need to select color of grout) vii. Bath accessories viii. Door hardware, bath, closets and bedroom doors. Don't forget door stops if desired. ix. Bath ceiling fan and light x. Carpeting for suite area and master bedroom. xi. Toilet and seat xii. All switch and outlet plates 2. KITCHEN AREA. a. Labor Allowance i. Prep all walls for either the or paint ii. Replacement of all cabinets, trim and accessories for cabinets. General layout for cabinets will remain the same. iii. Replacement of counter, sink and back plash by others. iv. All required plumbing for new sink, water line for refrigerator,and waste. v. Install new garbage disposal vi. All required and specified electrical for outlets and ceiling lighting as to customers submitted layout. Wall outlets to remain the same. vii. No radiant heating for kitchen. viii. Wood flooring prep and installed (glued) ix. Concrete floor holes filled and sealed. x. Wall partition removed to extend cantilevered counter, and side of pantry cabinet wall removed. Prep ready for paint. xi. Reroute return air vents xii. Tile back splash,grout and seal. xiii. Reconstruct 45 degree wall section on cantilevered counter to a 90 degree. xiv. Removal and reinstall of base moldings and required door casings. xv. Installation of ceiling primed crown molding xvi. Installation of undercounted LED soft lights with dimmer switch xvii. New gas line for stove 8 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 Kennetfibakerl7@gmaii.com b. Material Includes i. All material for rough construction and finishing of walls ready for paint and or tile. ii. All electrical rough in needed for GFIC outlets and new ceiling canisters See customer layout for ceiling light layout. Existing outlets and switches will remain unless otherwise noted. iii. LED undercounted lighting iv. Customer needs to select finished trim kits for ceiling lights v. All materials for gas, manifold and fittings and safety valve_ vi. Crown molding and required trim where needed c. CUSTOMER SUPPILES: i. Range Hood (newton) ii. Kitchen Sink iii. Garbage disposal (Ensink) iv. Prime, Paint and labor. ( we need to schedule start date and colors) v. All appliances. (need to place order asap) vi.- Counter tops(need to place order asap) vii. Cabinets and cabinet accessories. (need to place order asap) viii. Wood Flooring. ix. Back splash tile. (need to place order asap) x. Door hardware and stops xi. All switch and outlet plates 3. LIVING&DINNING ROOM AREA a. Labor Allowance i. Prep, repair cracks and seal concrete ii. Installation of new wood flooring. (Glued) iii. Installation of all required wiring for switches, new ceiling lights and relocated outlets. iv. Relocation of fireplace mantel. Specifics and labor yet to be finalized. v. Trim and place a decretive column at base of new knee wall separating laundry hall area and living room. vi. Installation of ceiling primed crown molding vii. Reinstallation of existing doors and new hardware. viii. Prep and finish all walls as result of demo of partitioned walls for paint. 9 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 I<ennetlibakerl7@gmail.com ix. Relocate required air flow venting. x. Relocate existing Dinning room light fixture. xi. Removal and reinstall of base moldings and required door casings. xii. All required and specified electrical for outlets,switching and ceiling lighting as to customers submitted layout. b. Material Includes i. All material for rough construction and finishing of walls ready for paint ii. All electrical rough in needed for GFIC outlets and new ceiling lighting. See customer layout for ceiling light layout. Existing outlets and switches will remain unless otherwise noted. iii. Wood flooring prep and installed (glued) iv. Trim material for column and trim detail moldings c. Customer Supplies: i. Finished light baffles ii. Wood Flooring iii. All switch and outlet plates 4. SUN ROOM AREA a. Labor Allowance i. Prep, repair cracks and seal concrete ii. Installation of all required wiring for switches, new ceiling lights/fan and relocated outlets. See customer for layout. iii. Installation of new wood flooring. (Glued) iv. Removal and reinstall of base moldings and required door casings. b. Material Includes i. All electrical rough in needed for GFIC outlets and new ceiling lighting. See customer layout for ceiling light layout. Existing outlets and switches will remain unless otherwise noted. c. Customer Supplies: i. Ceiling fan ii. Wood flooring iii. All switch and outlet plates iv. All switch and outlet plates 10 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 I<ennethbakerl7@gmaii.com 5. FOYER AREA: a. labor Allowance: i. Rough construction and finishing of walls ready for paint ii. All electrical rough in needed for GFIC outlets and new ceiling lighting. See customer layout for ceiling light layout. Existing outlets and switches will remain unless otherwise noted. iii. All plumbing material for water line repair iv. Trim base moldings% round only. Base not removed unless damaged or requested v. Reinstallation of existing doors and new hardware. vi. Installation of new front door????not included in estimated labor vii. French doors are not to be removed viii. Installation of crown molding lower section of bulkhead only. ix. Replace closet shelving x. Trim and place a decretive column at base of new knee wall separating laundry hall area and living room. xi. Installation of new wood flooring. (Glued) xii. No lighting changes in this area. xiii. Removal and reinstall of base moldings and required door casings. b. Material Includes: i. All material for rough construction and finishing of walls ready for paint ii. All electrical material rough in needed for GFIC outlets and new ceiling lighting. See customer layout for ceiling light layout. Existing outlets and switches will remain unless otherwise noted. iii. All plumbing material for water line repair iv. Wood floor adhesive and latex sealant. c. Customer Supplies: i. Front door if choses to replace. ii. Door hardware and stops iii. Wood flooring iv. All switch and outlet plates V. vi. 6. DEN AREA: a. Labor Allowance 11 SCF CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 1<ennethbakerl7@gmaii.com i. Trim base moldings% round only. Base not removed unless damaged or requested ii. Reinstallation of existing doors and new hardware. iii. Carpet to be installed by others iv. Ceiling fan remains. v. No electrical or lighting changes specified. vi. Door hardware and stops vii. Removal and reinstall of base moldings and required door casings. viii. Adjustments to existing pocket door ix. Relocation of existing three gang switch box. (change 7/11/14) b. Customer Provides i. Carpeting by others. ii. All switch and outlet plates 7. FRONT BED ROOM: a. Labor Allowance i. Trim base moldings% round only. Base not removed unless damaged or requested ii. Replace closet shelving iii. Install new ceiling fan iv. Reinstallation of existing doors and new hardware. v. Carpet to be installed by others vi. No electrical or lighting changes specified vii. Install new ceiling fan. b. Customer Supplies: i. Carpeting by others ii. Ceiling fan iii. Door hardware and stops iv. All switch and outlet plates 0 8. COMMON BATHROOM: a. Labor Allowance i. Radiant heat installed in floor specific location. Will confirm with customers. 12 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 I<ennethbakerl7@gmaii.com ii. Installation of new vanity base with molded counter bowels iii. Installation of toilet and water supply. iv. Installation of Vanity mirror and light fixture. v. No additional ceiling light at this time. vi. Existing Newton fan remains. vii. New tile flooring,grout and seal.Size, color and grout to be determined by customer. viii. Tub shower unit remains. ix. Install new shower valve exterior parts only. ( shut off valve, shower head, and tub picket. Drain trap will not be replaced being there is no access. x. Closet shelving xi. Modify vanity plumbing to accommodate new vanity (change 7/11/14) b. Customer Supplies: i. Vanity and top ii. Toilet and seat iii. Tile iv. Accessories v. Mirror. vi. Light fixture vii. All switch and outlet plates 9. LAUNDRY AREA: a. Labor Allowance: i. Trim base moldings 4 round only. Base not removed unless damaged or requested ii. Reinstallation of existing doors and new hardware. iii. Installation of tile flooring,grout and seal iv. Replace closet shelving v. Security system relocation by others. vi. Removal and installation of the new wash tub same style and size. vii. Modify dryer venting as needed for new dryer. viii. Security system by others b. Customer Supplies: i. Appliance 13 SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 Kennethbakerl7(@gmaii.com ii. Door hardware and stops iii. All switch and outlet plates iv. Security system v. Selected tile. 10. Attic Area: a. Labor allowance: i. Remove the water damaged subflooring to investigate what if any water damage. ii. Prep and remove portion of gable end wall to install a new TOA approved gable end louvered vent with a electric thermostatically controlled fan. b. Customer supplies: 14 ZPIq SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 I(ennethbakerl7CcD mail com 717 636 4805 Date July 312014 Bob and Lorrie Preston 289 Founders way West Mechanicsburg Pa 717-580-8993 Dear Bob and Lorrie, Please find enclosed an update as to the project payments made to date, material purchases for reimbursement, additional projects to contract, additional labor for unforeseen issues and allotted estimated time and balance from contract contracted amount of$ 29,900.00 as well as revised cost that initial. Payments made: 1. $ 10.000.00 Project deposit July 7/14 Check 2444 2. $ 16,629.00 Material reimbursement for$ 10.248.00 wood flooring, heat, $2,500.00 First project draw and,$2000.00 towards counterrs. It1 abs decide1-34 d that this amount would be used for my next draw for the week of the 25th 3. $ 2,500.00 Second project draw July 18/14 Check 2459 4. Total paid for labor draw$ 7000.00 5. Total materials of$4625.06 purchased to date over and above contracted material included in the contract details. . Some of the materials are part of the pre estimated items specified and some are the result of changes and unforeseen issues. 6. Rental equipment for floor removal and repair of the foyer plumbing repair.$888.40 7. Dump removal$250.00 8. Additional project issues requested and/or unforeseen problems. Labor only.$5415.00 a. Electrical issues trouble shooting dedicated circuit for common bath and front bed room$ 300.00(3) b. Replacement of shower valves for master and common bath$390.00 c. Replacement of Gas Tight manifold and three service lines$375.50 (5.5) d. Relocated pluming in common bath to accommodate custom vanity$ 195.00 e. Foyer closet box to conceal plumbing$65.00 f. Replace all GFU breakers through out house$ 97.50 g. Additional switches and outlets placed in rooms. $ 262,50(3.5) h. Run coax and phone lines$ 262.50 i. Move 3 gang electrical box in den $ 292.50 (4.5) j. Added laundry room radiant heating. Material and labor$422.50 (6) $395.00 k. Create custom soffit and column for knee wall adjustment cost$ 747.50 (11.5) I. Create custom matching column for adjacent wall$455.00 (7) m. Adjustments for Angled tile layout and installation for the three rooms$ 227.50 n. Revised plans for fire place and knee wall. $ 590.00 o. Removal and Replacement of two new bathroom ceiling light fans.Also rewire the switches to meet customers configuration. $ 337.00(4.5) p. Removal and replacement of existing base molding and install larger 5-1/4" $To be determined. q. Attic access panels x2 $to be determined. r. Install attic exhaust fan and louvered vent on gable end. $to be determined. s. Change direction of access door to attic and place louvered venting. $To be determined. t. Crown installed for Kitchen, dinning and living room ceilings$To be determined. U. Custom fire place/entertainment center with all required run cables and ports $To be determined 9. Balance of the$29,900.00 a. $ 12,900.00 Summery review of Balance forward: 1. Weekly draw.....................................................................................................$ 2,500.00 2. Materials to date................................................................................................$4625.06 3. Rentals................................................................................................................$ 888.40 4. Dump fee ............................................................................................................$ 250.00 5. Additional labor fees for changes and unforeseen issues. .........................$ 5,415.00 BALANCE TOTAL: $ 11,178.46 Kenneth Baker SCE Construction CO e SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 717 636 4805 i(ennethbakerl7@gmail.com Date September 15 2014 Bob and Lorrie Preston 289 Founders way West Mechanicsburg Pa 717-580-8993 Dear Bob and Lorrie, Please find enclosed an update as to the project payments made to date, material purchases for reimbursement,additional projects that initial. Balance forward to date from original contract is$4900.00 Additional projects over and above the initial contract: $ 7790.00 1. Attic Panel 250.00 2. Change out two doorjambs 95.00 3. Base molding replacement 600.00 4. Remove and replace shower and tub doors: 275.00 5. Reinstall finish shower valves, shower head,tub spicket, and drains. 75.00 6. Change direction of garage attic entry door: 90.00 7. Custom Fireplace (58 hrs)4350.00 a. Removal b. Rewire x2 for tv coax, 120v, stereo junction box c. Final drawings d. Run of sound system wiring e. Layout and design time f. Custom making of mantel g. Reframing and drywall cutout. h. Installation of new mantel i. Note that there is an adjustment and credit from original contract for removal of top mantel only. 8. Adjustment floor install due to specific patterns and random joints: 550.00 9. Adjustments in Tile installation due to pattern design 125.00 10. Dump fee second trip$ 250.00 11. Water filtraction system. Run new plumbing through attic to kitchen sink. 540.00 12. Resurface garage floor. 500.00 1 13. Disconnect water filter and run new dedicated outlet from attic. Prep for closed in closet. 90.00 Material purchases:3670.60 Following items are Incomplete: Est: cost 14. Front storm door 15. Front lights 16. Rear screen doors 17. Garage closed in area for Water softener. Frame, and finish with drywall,taped with louvered door(575.00) Balance owed to date: $ 16,360.60 Material credits$432.00 Driveway recoat allowance: $ 200.00 Total Balance: 15728.00 Requested final draw$ 13000.00 Final payment at completion $ 2728.00 Kenneth Baker 2 2oic� SCE CONSTRUCTION Kenneth B Baker 2848 Orchard Lane Middletown Pa 17057 i(ennethbakerl7@gmail.com 717 636 4805 Date September 15 2014 Bob and Lorrie Preston 289 Founders way West Mechanicsburg Pa 717-580-8993 Dear Bob and Lorrie, Please find enclosed an update as to the project payments made to date, materW purchases for reimbursement, additional projects that initial. Balance forward to date from original contract is$4900.00 Additional projects over and above the initial labor contract: $ 7852.00 Additional Materials$3670.60 I. Attic Panel 250.00 2. Change out two doorjambs 95.00 3. Base molding replacement 600.00 4. Remove and replace shower and tub doors: 275.00 5. Reinstall finish shower valves, shower head, tub spicket, and drains. 75.00 6. Change direction of garage attic entry door: 90.00 7. Custom Fireplace (58 hrs)4350.00 a. Removal b. Rewire x2 for tv coax, 120v, stereo junction box c. Final drawings d. Run of sound system wiring e. Layout and design time f. Custom making of mantel g. Reframing and drywall cutout. h. Installation of new mantel i. Note that there is an adjustment and credit from original contract for removal of top mantel only. 8. Adjustment floor install due to specific patterns and random joints: 550.00 9. Installation exterior light fixtures. 65.00 10. Adjustments in Tile installation due to pattern design 125.00 1 11. Dump fee second trip$250.00 12. Water filtration system. Run new plumbing through attic to kitchen sink. 540.00 13. Resurface garage floor. 500.00 14. Disconnect water filter and run new dedicated outlet from attic. Prep for closed in closet . 90.00 Following items are Incomplete: Est: cost 15. Front storm door 16. Rear screen doors 17. Garage closed in area for Water softener. Frame, and finish with drywall,taped with louvered door(575.00) Balance owed to date: $ 16,422.00 Material credits$432.00 Driveway recoat allowance: $200.00 Total Balance: 15790.00 Requested final draw$ 13000.00 Final payment at completion$ 2790.00 Revised September 18 2014 Payment received:$10,000.00 Balance forward:$5790.00 Additional work:$ 735.00 I. Additional work: Water supply line to refrigerator ice maker bypass garage water treatment: $ 275.00 2. Remove and relocate water treatment system. $ 75.00 3. Removal and replacement of all new door hardware, hinges, stops. 175.00 4. Run new phone lines and coax to dedicated rooms. 210.00 Additional materials$217.00 I. Plumbing, pex, hardware, paint material for garage. Balance forward: $$6,742.00 2 ,. Inst. # 201412878 - Page 1 of 5 Prepared by and Return to: Guardian Transfer Corporation CERTIFIED PROPERTY .IDENTIFICATION NUMBERS 4075 Market St. 38-23-0571-001 -U101 Camp Hill,PA 17011 SILVER SPRING CCGZS REGISTRY 06/17/2014 BY DC Parcel ID#38 23-0571-001.U101 h ir��enture, made the day of VIRGEWA BARBER,WIDOW (hereinafter called the Grantor),of the one part,and ROBERT G.PRESTON AND LORRIE A.PRESTON,HUSBAND AND WIFE (hereinafter called the Grantees),of the other part, lViW-9914, that the said Grantor for and in consideration of the sum of Two Hundred Seventy-Five Thousand And 00/100 Dollars($275,000.00)lawful money of the United States of America,unto it we ll d truly paid by the said Grantees, at or before the sealing and delivery hereof, the receipt whereof is hereby acknowledged, has granted, bargained and sold, released and confirmed, and receipt these presents does grant,bargain and sell,release and confirm unto the said Grantees ALL THAT CERTAIN unit in the property known, named and identified in the Declaration referred to below as Traditions of America at Silver Spring located in Silver Spring Township, County of Cumberland, Commonwealth of Pennsylvania, which ahs heretofore been submitted to the provisions of the Pennsylvania Uniform Condominium Act, 68 P.S.A. §3101, et seq., by the recording in the Office of the Recorder of Deeds of Cumberland County, Pennsylvania of a Master Declaration of Condominium dated 06/18/08 by instrument#200820570 and recorded 06/19/08 and Declaration of Condominium No. 1 dated 06/18/08, and recorded on 06/19/08, by instrument #200820571, being and designated in such Declaration as Unit 101 as more fully described in such Declaration, together with a proportionate undivided interest in the Common Elements(as defined in such Declaration)of 5.0% BEING part of the same premises which 155 KPA,, LLC by Deed dated 07/16/07 and recorded on 07/17/07 in Cumberland County in Deed Book 280,page 4951,conveyed unto Grantor,its successors and assigns,in fee. Subdivision Plan being recorded in Instrument#200739133 BEING known as County Tax parcel Number 38 23 0571 001 (unit 101) ,�L7 I{0M0/30 Ronny R Anderson Sheriff Jody S Smith Chief Deputy Richard W Stewart Solicitor SHERIFF'S OFFICE OF CUMBERLAND COUNTY I H.r. PRO7t;J► 20JAN 12 011:0C CUMBERLAND COUNTY PENNSYLVANIA Kenneth Baker tibia SCE Construction vs. Robert Preston (et al.) Case Number 2014-7302 SHERIFF'S RETURN OF SERVICE 12/19/2014 02:10 PM - Deputy Shawn Gutshall, being duly sworn according to law, served the requested Mechanics Lien Claim by "personally" handing a true copy to a person representing themselves to be the Defendant, to wit: Lorrie Preston at 289 Founders Way, Silver Spring, Mechanicsburg, 'A 17050. 4for,"*". GUTSHALL, DEPUTY 12/19/2014 02:10 PM - Deputy Shawn Gutshall, being duly sworn according to law, served the requested Mechanics Lien Claim by handing a true copy to a person representing themselves to be Lorrie Preston, Wife, who accepted as "Adult Person in Charge" for Robert Preston at 289 Founders Way, Silver Spring, Mechanicsburg, PA 17050. SHERIFF COST: $55.79 TG TSHALL, DEPUTY December 24, 2014.RONNY R ANDERSON, SHERIFF NOTARIAL SEAL JODY SMITH; NOTARY PUBLIC Cari;`=`e Boro, Cumberland County My Commission Expires April Affirmed and subscribed to before me this day of -4 CA -LA, u., -k-- NOTARY aC.O IS (c) Cot ntySuite Sheriff. Te eosoft. Inc.