HomeMy WebLinkAbout14-7302 KENNETH BAKER
t/d/b/a SCE CONSTRUCTION IN THE COURT OF COMMON
PLEAS Of CUMBERLAND
Claimant COUNTY,PENNSYLVANIA
V. CIVIL DIVISION
ROBERT PRESTON and LORRIE PRESTON, ,,/� c _
Husband and Wife y� 73d-2 /"lam
Owner �r'' m M==
' N--'iC'"7
Q
MECHANICS' LIEN CLAIM 3>25
Claimant, Kenneth Baker, t/s/b/a SCE Construction, through his
undersigned counsel, hereby brings this Mechanics' Lien Claim as follows:
1. Claimant SCE Construction ("claimant") is a sole proprietorship
with his principal place of business at 439 Market Street, New Cumberland,
PA 17070.
,2. The owner or reputed owner of the property subject to the lien is
Robert Preston and Lorrie Preston, husband and wife, who reside at 289
Founders Way, West Mechanicsburg, Cumberland County, Pennsylvania.
3. On or about September 15, 2014, Claimant last provided labor
and materials for and performed work at the subject property for which this
claim is made.
%� cet ys'�s
t
4. Claimant files this claim under a written contract dated July 11,
2014, and amendments thereto, whereby claimant agreed to provide and
furnish certain labor, material and services including, among other things,
installation of cabinetry, counters, appliances, wood flooring, tile work,
plumbing and installation of kitchen and bath accessories, drywall, radiant
heating system, electrical work and other carpentry work, all of which were
installed or performed by claimant and incorporated into owners' dwelling
located at 289 Founders Way, Mechanicsburg, Cumberland County,
Pennsylvania. The kind and character of Claimant's work are more fully set
forth in the original contract and additional statements thereto. A true and
correct copy of these documents is attached hereto as Exhibit "A"..
5. The amount which continues to be due and owing to Claimant is
$6,917.00.
6. Claimant is the sole contractor and therefore no Notice of
Intention to file a Mechanics' Lien is required.
7. The improvements and property claimed to be subject to the lien
is located at 289 Founders Way, Mechanicsburg, Pennsylvania and bearing a
tax parcel identification number 38-23-0571-001.U101. The property is more
fully described in the legal description attached hereto as Exhibit "B", and is
incorporated herein by reference.
WHEREFORE, Claimant, Kenneth Baker, t/s/b/a SCE Construction
claims a lien upon the premises herein described in the amount of$6,917.00,
plus interest and costs, against the owners.
Respectfully submitted,
R.4, ,Maromas, Esquire
Attorney for Claimant
ID #41301
101 South Market Street
Mechanicsburg, PA 17055
Telephone: (717) 796-2100
Fax: (717) 796-3600
Email: rmarkthomas@ mail com
VEMEICATION
I verify that the statements made in the foregoing Mechanics' Lien Claim are true and
correct to the best of my knowledge, information and belief. I understand that false statements
herein are made subject to the penalties of 13 Pa. C.S. § 4904, relating to unsworn falsification to
authorities.
Date: y
KENNETH B. BAKER
� s _
g.;..��" i �?r+��Fzp�� � � ,; air "�-#�� �s � � � � '��, - r�/,�•�
�R `STO
I rHu-jEr
M
Bob & Lorrie Preston July 2014
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
Kenneth_baker17(@gmail coni
Ex A
0 , P , e
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
Kennethbaker17 c,email corn
COVER PAGE OVERVIEW OF COSTS
• Total estimated cost for enclosed project $ 76.175.00
a. Estimated customer responsibility for materials$38,500.00
b. Estimated materials contractor will be purchasing and seeking reimbursement.
$ 7,400.00
c. Total labor estimated costs based on calculated man hrs and multi-task projects and
said materials.$ 29,900.00
d. Drawing for project foot print. $ 375.00
1
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
Kennethbakerl7(@gmail.com
Project overview
Date July 10 2014
Bob and Lorrie Preston
289 Founders way
West Mechanicsburg Pa
717-580-8993
Dear Bob and Lorrie,
Enclosed are the details for the project which include a description of the demolition, details as
to work preformed for each room of the home,cost and responsibilities as to labor and materials. The
general outline initials bullets for easier review and reference.
1. Project responsibilities as to labor and material cost: Customer,is responsible for material cost as
well as appliances.
2. As discussed in our last meeting being that I am passing on my cost for material I'have suggested
that you as the customer will provide all major materials.
3. Customer will have access to contractor cost for all accounts in which I have an established
house account.
4. Contractor will provide details and specification for customer to purchase such material.
S. Customer is responsible for choosing the selection of material. Estimated cost of materials is
based availability, special order,brand, and quality. Estimated cost$ 38,500.00
a. Cabinets, knobs,trim and accessories......11,500.00
b. Counters kitchen .........3800.00
c. Fixtures (toilets) .......300.00..
d. Facets( kitchen, bath x3) ......325.00
e. Appliance ....7000.00
f. Kitchen sink .....400.00
g. Vanity tops x3 .......850.00
h. Bath accessories........175.00
i• Wood flooring, ...... 7,800.00
j. Carpet
k. Tile .....350.00
I. paint, 6000.00
m. light fixtures,
2
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
Kennethbakerl7(@gmail.com 717 636 4805
n. canister baffles
o. Tile for bath floors and back splash.
p. Lock sets and hinges for doors.
q. Mirrors
r. Ceiling fans
S. Front bath shower/tub valve kit
6. Contractor will be responsible for construction material such as
a. Electrical rough wiring
b. Rough in ceiling canisters
c. Gang boxes for switches
d. Rough in plumbing and Pex
e. Concrete
f. Insulation
g. Rental equipment for floor
7. Contractor will be responsible to pick up following materials and will be compensated for:All
products provided by contractor is of top quality and specific to customers request. The
estimated cost of compensated materials............................$ 7,400.00
a. Drywall, compound, tape 150.00
b. Pocket door and hardware 250.00
C. Selected light switches 65.00
d. Tile adhesives,grout and sealant 365.00
e. Finish shut off valves, exposed pluming 125.00
f. Finish trim material for knee wall,%" round white base for wood floor,5-1/4" base
molding and crown molding for ceiling. 1775.00
g. True Heat radiant heat elements and controls 1625.00
h. Modified thin set for tile and radiant 265.00
i. Closet shelving allowance throughout. 500.00
j. Exhaust fan and vent for attic 375,00
k. Garage floor sealer and finish 295.00
I. Gas line, manifold and fittings for stove. (3Sft)475.00
m. Floor sealant and adhesive 780.00
n. Laundry area wash tub and facet 75.00
o. New dryer vent kit 35.00
P. Miscellaneous 250.00
3
SCL CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
Kennethbakerl7@gmail com 717 636 4805
8. Labor cost:
a. Total estimated labor costs based on calculated man hours and multi-task skilled
projects said materials provided is $29,900.00
b. Estimated set labor cost is based on the enclosed description of work preformed.
c. All work not included in work description outline may be submitted as additional labor.
d. Deposit of$10,000.00 made July 7th 2014.
e. A requested draw of$2,500.00 per week for the next 6 weeks. Balance of$4,500.00
and any difference of labor for additional work other then in description will be added
to the final balance.
f. Any change to amount in item A. ($29,900.00)will be submitted for approval.
g. All material contractor purchases for project (item 7)and is in material description
may request payment throughout project and balance at end of project.
h. Project plans and drawing created for cabinet layout, column views radiant heat
submittal,and viewing.
$375.00. Unless otherwise revised this will be the total amount owed for foot print
awi
9-
b Pr. ton ,
Date
Lorrie Preston Date —7--1/-/41
Date � �f
Kenneth Baker SCE construction
4
�'u ►�
SCE CONSTRUCTION Za t
Kenneth B Baker
2848 Orchard{_ane
7 b t �B l E� Middletown Pa 17057
Kennethbaker17C@9maiitorr, 717 636 4805
Demolition to be completed as part of the estimated labor cost. Note that all product that is to be
removed will not be reinstalled unless otherwise specified.
1. Demolition and removal of the following:
a. Master Bath. ( Nothing is to be reused)
i. Partial wall between toilet and main bath area.
ii. Closet area and half wall adjoining shower wall
iii. Vanity, counter, facet, mirror, light bar.
iv. All accessories
v. Door hardware
vi. Shower is not to be removed.
vii. Tile floor
viii. Base molding
ix. Re-use existing shutoff valves if possible.
x. Toilet
b. Master Hall Area.
i. Existing entry door and frame to master suite common area.
ii. Part of wall section in hall and closet area to accommodate for new pocket
door.
iii. Remove all carpeting,padding and tack strips
iv. All closet shelving. (save for possible-use)
v. Ceiling light fixture and switch in enclosed ceiling area. DO not relocate switch.
C. Master Bedroom ( Nothing to be reused)
i. Remove carpet and padding and tack stripping
ii. Remove ceiling fan.
d. Living Room And Dinning
i• Remove all carpeting, padding and tack stripping
ii. Remove column areas to master bed room suite
Remove 2/3rds of wall adjoining living room and laundry hall.
iv. Remove bulkhead area above foyer area and living room ceiling.
v. Remove and lower fire place mantel.
vi. Remove door/way section between dinning area and kitchen. Reduce part of
wall to a knee wall for new counter for kitchen counter.
e. Foyer Area
i. Remove wood flooring
ii. % round molding only
iii. Remove water damaged drywall area and concrete flooring for repair. This
problematic repair is do to existing issue caused by builder and plumber.
iv. Remove all hardware from doors
v. Closet shelving
5
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Ra 17057
Ken nethbakeq mail.com 717 636 4805
f Common Bath Area
i. Remove vanity, counter and fixture
ii. Toilet
iii. Mirror
iv. Med cabinet
V. All accessories
vi. Tile flooring
vii. Do Not remove tub shower unit
viii. All hardware.
g• Front Bedroom
i. Remove carpet and tack strip
ii. Closet shelving
iii. All hardware
iv. Ceiling fan
h. Sun Room
i. Vinyl flooring
ii. Ceiling fan
'��• %round
i• Kitchen Area
�• All cabinets
ii. Counters
Tile back splash
iv. Ceiling lighting
v Garbage disposal
vi. Vinyl flooring
vii. Appliances
Viii. Wall partition removed to extend cantilevered counter, and side of
pantry
cabinet wall removed.
J• Laundry Room Area
i. Vinyl flooring
ii. Door hardware
iii. Security system panel. To be installed by others.
6
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
Kennethbaker17@gmaii.com
Project description initials labor performed, material included in labor estimate, customers
responsibilities.Any changes to this description will be updated for approval prior to making change.
1. MASTER BATHROOM SUITE AREA.
a. Labor Allowances:
i. Wiring relocation for vanity(s) lighting and 2 GFCI
ii. Relocate as needed plumbing water and waste for new vanity and
relocation of toilet
iii. Relocate existing light box and outlet box for new vanity
iv. Install new junction light box and GFIC outlet.
v. Install new facets and traps for two vanities.
vi. Pex or copper may be used for rework.
vii. Patch removed concrete areas as needed. Prep for radiant floor heat.
viii. Radiant heat installed in floor specific location. Will confirm with customers.
ix. Installation of two new vanity bases with molded counter bowels.
x. Installation of toilet and water supply.
xi. Installation of Vanity mirrors and light bars.
xii. Center light over toilet with dedicated switch
xiii. Existing Newton replaced without heat element.
xiv. New tile flooring,grout and seal.Size, color and grout to be determined by
customer.
xv. Painting to provide by others.
xvi. Remove main entrance door to suite and replace with new pocket door
unit.
xvii. Replace closet shelving for the two master suite closets.
xviii. Master bedroom fans blades to be removed and painted to match existing
trim.
xix. Seal and patch existing concrete slab
xx. Install new bath accessories
b. Material Includes:
i. All rough plumbing supplies required for waste and water supplies including
finished supply valves.
ii. All Electrical supplies for relocation,GFIC,switches,and radiant heating Cabinet
trim will be part of cabinet order. Existing outlets and switches will remain unless
otherwise noted.
iii. traps for two vanities
iv. Tile adhesive and sealant.
v. Material for concrete patching,sealing and finishing sub concrete.
vi. Radiant flooring material
7
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
I<ennethbakerl7@gmail.com
c. Customer supplies:
i. Light fixtures for vanities
ii. Two Mirror slabs (no med cabinets)
iii. Prime, Paint and material by others
iv. Cabinets and hardware
v. Counter tops
vi. Floor tile (need to select color of grout)
vii. Bath accessories
viii. Door hardware, bath, closets and bedroom doors. Don't forget door stops if
desired.
ix. Bath ceiling fan and light
x. Carpeting for suite area and master bedroom.
xi. Toilet and seat
xii. All switch and outlet plates
2. KITCHEN AREA.
a. Labor Allowance
i. Prep all walls for either the or paint
ii. Replacement of all cabinets, trim and accessories for cabinets. General
layout for cabinets will remain the same.
iii. Replacement of counter, sink and back plash by others.
iv. All required plumbing for new sink, water line for refrigerator,and waste.
v. Install new garbage disposal
vi. All required and specified electrical for outlets and ceiling lighting as to
customers submitted layout. Wall outlets to remain the same.
vii. No radiant heating for kitchen.
viii. Wood flooring prep and installed (glued)
ix. Concrete floor holes filled and sealed.
x. Wall partition removed to extend cantilevered counter, and side of pantry
cabinet wall removed. Prep ready for paint.
xi. Reroute return air vents
xii. Tile back splash,grout and seal.
xiii. Reconstruct 45 degree wall section on cantilevered counter to a 90 degree.
xiv. Removal and reinstall of base moldings and required door casings.
xv. Installation of ceiling primed crown molding
xvi. Installation of undercounted LED soft lights with dimmer switch
xvii. New gas line for stove
8
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
Kennetfibakerl7@gmaii.com
b. Material Includes
i. All material for rough construction and finishing of walls ready for paint and
or tile.
ii. All electrical rough in needed for GFIC outlets and new ceiling canisters See
customer layout for ceiling light layout. Existing outlets and switches will
remain unless otherwise noted.
iii. LED undercounted lighting
iv. Customer needs to select finished trim kits for ceiling lights
v. All materials for gas, manifold and fittings and safety valve_
vi. Crown molding and required trim where needed
c. CUSTOMER SUPPILES:
i. Range Hood (newton)
ii. Kitchen Sink
iii. Garbage disposal (Ensink)
iv. Prime, Paint and labor. ( we need to schedule start date and colors)
v. All appliances. (need to place order asap)
vi.- Counter tops(need to place order asap)
vii. Cabinets and cabinet accessories. (need to place order asap)
viii. Wood Flooring.
ix. Back splash tile. (need to place order asap)
x. Door hardware and stops
xi. All switch and outlet plates
3. LIVING&DINNING ROOM AREA
a. Labor Allowance
i. Prep, repair cracks and seal concrete
ii. Installation of new wood flooring. (Glued)
iii. Installation of all required wiring for switches, new ceiling lights and
relocated outlets.
iv. Relocation of fireplace mantel. Specifics and labor yet to be finalized.
v. Trim and place a decretive column at base of new knee wall separating
laundry hall area and living room.
vi. Installation of ceiling primed crown molding
vii. Reinstallation of existing doors and new hardware.
viii. Prep and finish all walls as result of demo of partitioned walls for paint.
9
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
I<ennetlibakerl7@gmail.com
ix. Relocate required air flow venting.
x. Relocate existing Dinning room light fixture.
xi. Removal and reinstall of base moldings and required door casings.
xii. All required and specified electrical for outlets,switching and ceiling lighting
as to customers submitted layout.
b. Material Includes
i. All material for rough construction and finishing of walls ready for paint
ii. All electrical rough in needed for GFIC outlets and new ceiling lighting. See
customer layout for ceiling light layout. Existing outlets and switches will
remain unless otherwise noted.
iii. Wood flooring prep and installed (glued)
iv. Trim material for column and trim detail moldings
c. Customer Supplies:
i. Finished light baffles
ii. Wood Flooring
iii. All switch and outlet plates
4. SUN ROOM AREA
a. Labor Allowance
i. Prep, repair cracks and seal concrete
ii. Installation of all required wiring for switches, new ceiling lights/fan and
relocated outlets. See customer for layout.
iii. Installation of new wood flooring. (Glued)
iv. Removal and reinstall of base moldings and required door casings.
b. Material Includes
i. All electrical rough in needed for GFIC outlets and new ceiling lighting. See
customer layout for ceiling light layout. Existing outlets and switches will
remain unless otherwise noted.
c. Customer Supplies:
i. Ceiling fan
ii. Wood flooring
iii. All switch and outlet plates
iv. All switch and outlet plates
10
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
I<ennethbakerl7@gmaii.com
5. FOYER AREA:
a. labor Allowance:
i. Rough construction and finishing of walls ready for paint
ii. All electrical rough in needed for GFIC outlets and new ceiling lighting. See
customer layout for ceiling light layout. Existing outlets and switches will
remain unless otherwise noted.
iii. All plumbing material for water line repair
iv. Trim base moldings% round only. Base not removed unless damaged or
requested
v. Reinstallation of existing doors and new hardware.
vi. Installation of new front door????not included in estimated labor
vii. French doors are not to be removed
viii. Installation of crown molding lower section of bulkhead only.
ix. Replace closet shelving
x. Trim and place a decretive column at base of new knee wall separating
laundry hall area and living room.
xi. Installation of new wood flooring. (Glued)
xii. No lighting changes in this area.
xiii. Removal and reinstall of base moldings and required door casings.
b. Material Includes:
i. All material for rough construction and finishing of walls ready for paint
ii. All electrical material rough in needed for GFIC outlets and new ceiling
lighting. See customer layout for ceiling light layout. Existing outlets and
switches will remain unless otherwise noted.
iii. All plumbing material for water line repair
iv. Wood floor adhesive and latex sealant.
c. Customer Supplies:
i. Front door if choses to replace.
ii. Door hardware and stops
iii. Wood flooring
iv. All switch and outlet plates
V.
vi.
6. DEN AREA:
a. Labor Allowance
11
SCF CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
1<ennethbakerl7@gmaii.com
i. Trim base moldings% round only. Base not removed unless damaged or
requested
ii. Reinstallation of existing doors and new hardware.
iii. Carpet to be installed by others
iv. Ceiling fan remains.
v. No electrical or lighting changes specified.
vi. Door hardware and stops
vii. Removal and reinstall of base moldings and required door casings.
viii. Adjustments to existing pocket door
ix. Relocation of existing three gang switch box. (change 7/11/14)
b. Customer Provides
i. Carpeting by others.
ii. All switch and outlet plates
7. FRONT BED ROOM:
a. Labor Allowance
i. Trim base moldings% round only. Base not removed unless damaged or
requested
ii. Replace closet shelving
iii. Install new ceiling fan
iv. Reinstallation of existing doors and new hardware.
v. Carpet to be installed by others
vi. No electrical or lighting changes specified
vii. Install new ceiling fan.
b. Customer Supplies:
i. Carpeting by others
ii. Ceiling fan
iii. Door hardware and stops
iv. All switch and outlet plates
0
8. COMMON BATHROOM:
a. Labor Allowance
i. Radiant heat installed in floor specific location. Will confirm with customers.
12
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
I<ennethbakerl7@gmaii.com
ii. Installation of new vanity base with molded counter bowels
iii. Installation of toilet and water supply.
iv. Installation of Vanity mirror and light fixture.
v. No additional ceiling light at this time.
vi. Existing Newton fan remains.
vii. New tile flooring,grout and seal.Size, color and grout to be determined by
customer.
viii. Tub shower unit remains.
ix. Install new shower valve exterior parts only. ( shut off valve, shower head,
and tub picket. Drain trap will not be replaced being there is no access.
x. Closet shelving
xi. Modify vanity plumbing to accommodate new vanity (change 7/11/14)
b. Customer Supplies:
i. Vanity and top
ii. Toilet and seat
iii. Tile
iv. Accessories
v. Mirror.
vi. Light fixture
vii. All switch and outlet plates
9. LAUNDRY AREA:
a. Labor Allowance:
i. Trim base moldings 4 round only. Base not removed unless damaged or
requested
ii. Reinstallation of existing doors and new hardware.
iii. Installation of tile flooring,grout and seal
iv. Replace closet shelving
v. Security system relocation by others.
vi. Removal and installation of the new wash tub same style and size.
vii. Modify dryer venting as needed for new dryer.
viii. Security system by others
b. Customer Supplies:
i. Appliance
13
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
Kennethbakerl7(@gmaii.com
ii. Door hardware and stops
iii. All switch and outlet plates
iv. Security system
v. Selected tile.
10. Attic Area:
a. Labor allowance:
i. Remove the water damaged subflooring to investigate what if any water
damage.
ii. Prep and remove portion of gable end wall to install a new TOA approved
gable end louvered vent with a electric thermostatically controlled fan.
b. Customer supplies:
14
ZPIq
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
I(ennethbakerl7CcD mail com 717 636 4805
Date July 312014
Bob and Lorrie Preston
289 Founders way
West Mechanicsburg Pa
717-580-8993
Dear Bob and Lorrie,
Please find enclosed an update as to the project payments made to date, material purchases for
reimbursement, additional projects to contract, additional labor for unforeseen issues and allotted
estimated time and balance from contract contracted amount of$ 29,900.00 as well as revised cost
that initial.
Payments made:
1. $ 10.000.00 Project deposit July 7/14 Check 2444
2. $ 16,629.00 Material reimbursement for$ 10.248.00 wood flooring,
heat, $2,500.00 First project draw and,$2000.00 towards counterrs. It1 abs decide1-34 d
that this amount would be used for my next draw for the week of the 25th
3. $ 2,500.00 Second project draw July 18/14 Check 2459
4. Total paid for labor draw$ 7000.00
5. Total materials of$4625.06 purchased to date over and above contracted material
included in the contract details. . Some of the materials are part of the pre estimated
items specified and some are the result of changes and unforeseen issues.
6. Rental equipment for floor removal and repair of the foyer plumbing repair.$888.40
7. Dump removal$250.00
8. Additional project issues requested and/or unforeseen problems. Labor only.$5415.00
a. Electrical issues trouble shooting dedicated circuit for common bath and front
bed room$ 300.00(3)
b. Replacement of shower valves for master and common bath$390.00
c. Replacement of Gas Tight manifold and three service lines$375.50 (5.5)
d. Relocated pluming in common bath to accommodate custom vanity$ 195.00
e. Foyer closet box to conceal plumbing$65.00
f. Replace all GFU breakers through out house$ 97.50
g. Additional switches and outlets placed in rooms. $ 262,50(3.5)
h. Run coax and phone lines$ 262.50
i. Move 3 gang electrical box in den $ 292.50 (4.5)
j. Added laundry room radiant heating. Material and labor$422.50 (6) $395.00
k. Create custom soffit and column for knee wall adjustment cost$ 747.50 (11.5)
I. Create custom matching column for adjacent wall$455.00 (7)
m. Adjustments for Angled tile layout and installation for the three rooms$ 227.50
n. Revised plans for fire place and knee wall. $ 590.00
o. Removal and Replacement of two new bathroom ceiling light fans.Also rewire
the switches to meet customers configuration. $ 337.00(4.5)
p. Removal and replacement of existing base molding and install larger 5-1/4" $To
be determined.
q. Attic access panels x2 $to be determined.
r. Install attic exhaust fan and louvered vent on gable end. $to be determined.
s. Change direction of access door to attic and place louvered venting. $To be
determined.
t. Crown installed for Kitchen, dinning and living room ceilings$To be
determined.
U. Custom fire place/entertainment center with all required run cables and ports
$To be determined
9. Balance of the$29,900.00
a. $ 12,900.00
Summery review of Balance forward:
1. Weekly draw.....................................................................................................$ 2,500.00
2. Materials to date................................................................................................$4625.06
3. Rentals................................................................................................................$ 888.40
4. Dump fee ............................................................................................................$ 250.00
5. Additional labor fees for changes and unforeseen issues. .........................$ 5,415.00
BALANCE TOTAL: $ 11,178.46
Kenneth Baker
SCE Construction CO
e
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
717 636 4805
i(ennethbakerl7@gmail.com
Date September 15 2014
Bob and Lorrie Preston
289 Founders way
West Mechanicsburg Pa
717-580-8993
Dear Bob and Lorrie,
Please find enclosed an update as to the project payments made to date, material purchases for
reimbursement,additional projects
that initial.
Balance forward to date from original contract is$4900.00
Additional projects over and above the initial contract: $ 7790.00
1. Attic Panel 250.00
2. Change out two doorjambs 95.00
3. Base molding replacement 600.00
4. Remove and replace shower and tub doors: 275.00
5. Reinstall finish shower valves, shower head,tub spicket, and drains. 75.00
6. Change direction of garage attic entry door: 90.00
7. Custom Fireplace (58 hrs)4350.00
a. Removal
b. Rewire x2 for tv coax, 120v, stereo junction box
c. Final drawings
d. Run of sound system wiring
e. Layout and design time
f. Custom making of mantel
g. Reframing and drywall cutout.
h. Installation of new mantel
i. Note that there is an adjustment and credit from original contract for removal of top
mantel only.
8. Adjustment floor install due to specific patterns and random joints: 550.00
9. Adjustments in Tile installation due to pattern design 125.00
10. Dump fee second trip$ 250.00
11. Water filtraction system. Run new plumbing through attic to kitchen sink. 540.00
12. Resurface garage floor. 500.00
1
13. Disconnect water filter and run new dedicated outlet from attic. Prep for closed in closet. 90.00
Material purchases:3670.60
Following items are Incomplete: Est: cost
14. Front storm door
15. Front lights
16. Rear screen doors
17. Garage closed in area for Water softener. Frame, and finish with drywall,taped with louvered
door(575.00)
Balance owed to date: $ 16,360.60
Material credits$432.00
Driveway recoat allowance: $ 200.00
Total Balance: 15728.00
Requested final draw$ 13000.00
Final payment at completion $ 2728.00
Kenneth Baker
2
2oic�
SCE CONSTRUCTION
Kenneth B Baker
2848 Orchard Lane
Middletown Pa 17057
i(ennethbakerl7@gmail.com 717 636 4805
Date September 15 2014
Bob and Lorrie Preston
289 Founders way
West Mechanicsburg Pa
717-580-8993
Dear Bob and Lorrie,
Please find enclosed an update as to the project payments made to date, materW purchases for
reimbursement, additional projects
that initial.
Balance forward to date from original contract is$4900.00
Additional projects over and above the initial labor contract: $ 7852.00
Additional Materials$3670.60
I. Attic Panel 250.00
2. Change out two doorjambs 95.00
3. Base molding replacement 600.00
4. Remove and replace shower and tub doors: 275.00
5. Reinstall finish shower valves, shower head, tub spicket, and drains. 75.00
6. Change direction of garage attic entry door: 90.00
7. Custom Fireplace (58 hrs)4350.00
a. Removal
b. Rewire x2 for tv coax, 120v, stereo junction box
c. Final drawings
d. Run of sound system wiring
e. Layout and design time
f. Custom making of mantel
g. Reframing and drywall cutout.
h. Installation of new mantel
i. Note that there is an adjustment and credit from original contract for removal of top
mantel only.
8. Adjustment floor install due to specific patterns and random joints: 550.00
9. Installation exterior light fixtures. 65.00
10. Adjustments in Tile installation due to pattern design 125.00
1
11. Dump fee second trip$250.00
12. Water filtration system. Run new plumbing through attic to kitchen sink. 540.00
13. Resurface garage floor. 500.00
14. Disconnect water filter and run new dedicated outlet from attic. Prep for closed in closet . 90.00
Following items are Incomplete: Est: cost
15. Front storm door
16. Rear screen doors
17. Garage closed in area for Water softener. Frame, and finish with drywall,taped with louvered
door(575.00)
Balance owed to date: $ 16,422.00
Material credits$432.00
Driveway recoat allowance: $200.00
Total Balance: 15790.00
Requested final draw$ 13000.00
Final payment at completion$ 2790.00
Revised September 18 2014
Payment received:$10,000.00
Balance forward:$5790.00
Additional work:$ 735.00
I. Additional work: Water supply line to refrigerator ice maker bypass garage water treatment:
$ 275.00
2. Remove and relocate water treatment system. $ 75.00
3. Removal and replacement of all new door hardware, hinges, stops. 175.00
4. Run new phone lines and coax to dedicated rooms. 210.00
Additional materials$217.00
I. Plumbing, pex, hardware, paint material for garage.
Balance forward: $$6,742.00
2
,. Inst. # 201412878 - Page 1 of 5
Prepared by and Return to:
Guardian Transfer Corporation CERTIFIED PROPERTY .IDENTIFICATION NUMBERS
4075 Market St. 38-23-0571-001 -U101
Camp Hill,PA 17011 SILVER SPRING
CCGZS REGISTRY 06/17/2014 BY DC
Parcel ID#38 23-0571-001.U101
h ir��enture, made the day of
VIRGEWA BARBER,WIDOW
(hereinafter called the Grantor),of the one part,and
ROBERT G.PRESTON AND LORRIE A.PRESTON,HUSBAND AND WIFE
(hereinafter called the Grantees),of the other part,
lViW-9914, that the said Grantor for and in consideration of the sum of Two Hundred Seventy-Five
Thousand And 00/100 Dollars($275,000.00)lawful money of the United States of America,unto it we
ll
d truly paid by the said Grantees, at or before the sealing and delivery hereof, the receipt whereof is
hereby acknowledged, has granted, bargained and sold, released and confirmed, and receipt
these presents
does grant,bargain and sell,release and confirm unto the said Grantees
ALL THAT CERTAIN unit in the property known, named and identified in the Declaration referred to
below as Traditions of America at Silver Spring located in Silver Spring Township, County of
Cumberland, Commonwealth of Pennsylvania, which ahs heretofore been submitted to the provisions of
the Pennsylvania Uniform Condominium Act, 68 P.S.A. §3101, et seq., by the recording in the Office of
the Recorder of Deeds of Cumberland County, Pennsylvania of a Master Declaration of Condominium
dated 06/18/08 by instrument#200820570 and recorded 06/19/08 and Declaration of Condominium No. 1
dated 06/18/08, and recorded on 06/19/08, by instrument #200820571, being and designated in such
Declaration as Unit 101 as more fully described in such Declaration, together with a proportionate
undivided interest in the Common Elements(as defined in such Declaration)of 5.0%
BEING part of the same premises which 155 KPA,, LLC by Deed dated 07/16/07 and recorded on
07/17/07 in Cumberland County in Deed Book 280,page 4951,conveyed unto Grantor,its successors and
assigns,in fee.
Subdivision Plan being recorded in Instrument#200739133
BEING known as County Tax parcel Number 38 23 0571 001 (unit 101)
,�L7 I{0M0/30
Ronny R Anderson
Sheriff
Jody S Smith
Chief Deputy
Richard W Stewart
Solicitor
SHERIFF'S OFFICE OF CUMBERLAND COUNTY
I H.r. PRO7t;J►
20JAN 12 011:0C
CUMBERLAND COUNTY
PENNSYLVANIA
Kenneth Baker tibia SCE Construction
vs.
Robert Preston (et al.)
Case Number
2014-7302
SHERIFF'S RETURN OF SERVICE
12/19/2014 02:10 PM - Deputy Shawn Gutshall, being duly sworn according to law, served the requested Mechanics
Lien Claim by "personally" handing a true copy to a person representing themselves to be the Defendant,
to wit: Lorrie Preston at 289 Founders Way, Silver Spring, Mechanicsburg, 'A 17050.
4for,"*".
GUTSHALL, DEPUTY
12/19/2014 02:10 PM - Deputy Shawn Gutshall, being duly sworn according to law, served the requested Mechanics
Lien Claim by handing a true copy to a person representing themselves to be Lorrie Preston, Wife, who
accepted as "Adult Person in Charge" for Robert Preston at 289 Founders Way, Silver Spring,
Mechanicsburg, PA 17050.
SHERIFF COST: $55.79
TG TSHALL, DEPUTY
December 24, 2014.RONNY R ANDERSON, SHERIFF
NOTARIAL SEAL
JODY SMITH; NOTARY PUBLIC
Cari;`=`e Boro, Cumberland County
My Commission Expires April
Affirmed and subscribed to before me this
day of -4 CA -LA, u., -k--
NOTARY
aC.O IS