Loading...
HomeMy WebLinkAbout94-06021 .. 3. In and around Mlroh, 1992, ACA ent.r.d into a oontract with Doneval tor exoavation/milling work whioh was to be p.rtora.d at a proj.ct. looat.d on Loou.t point Road in cumb.rland County, P.nn.ylvania (the "proj.ot"). Th. original contract b.tw.en ACA and Don.gal i. not in ACA'. po.....ion. 4. Th. original contract .nter.d into betw.en ACA and Done9al provided that Donegal would pertorm 1,400 .quare yard. ot Cla.. I .xcavation at $.90 per .quare yard. !S. The total amount of the original contraot b.tween ACA and Done9al was $12,600.00. 6. SUb.equ.nt to ACA I. ex.cution ot the contract with Donegal, Rohadd took over the bu.ine.. operation. ot Donegal. 7. On May 11, 1994, a new subcontract was allegedly .ntered into between ACA and Rohadd. A true and correct copy ot the May 11, 1994 .ubcontract i. annexed hereto as Exhibit "1". a. The .ubcontract entered into between ACA and Rohadd was eiailar to the subcontract which was entered into between ACA and Donegal except that the new subcontract contained a clau.e providing tor a $3,200.00 per work day minimum, plus an additional ooet ot $1,000 tor mobilization. 9. At no time did Robert Mumma, preeident ot ACA, authorize the.e additions to the oontraot. 10. In tact, it do.s not appear that Rl)bert Mumma .ver .xecut.d the n.w .ubcontract between ACA and Rohadd. 11. Rohadd pertormed it. work on the proj.ct int.raittently trom May 12, 1993 through May 21, 1993. a .' . 12. Rohadd i..ued invoice number 6B1 to ACA tor the work pertoraed in the Project whioh wa. in the total amount ot $26,600. A true and correct copy ot invoice number 6B1 i. attached hereto a. Ixhibit -2-. 13. The a.ount ot invoioe number 6B1, $26,600, wa. ba.ed upon the $3,200 per day minimum tor worked pertoraed over eight (B) day.. 14. By check number 20893, which was dated July B, 1993, ACA paid Rohadd the total amount due under invoice number 6Bl, $26,600. 15. pur.uant to the contract which wa. executed between ACA and Donegal, ACA .hould only have paid Rohadd $12,600. l6. A. a coneequence ACA overpaid Rohadd tor the work which it pertormed on thi. project by a total ot $14,000. 17. De.pite repeated reque.t. trom ACA, Rohadd has taUed and retu.ed tQ retund the overpayment. coon 1 ....ca o. COMTaAC~ lB. ACA incorporate. by reterence the averment. contained in Paragraphs I through 17 as if eet torth herein at length. 19. ACA has pel'formed aU ot its obligations under the original contract between ACA and Donegal by paying Rohadd tor the work it pertormed on the Project. 20. Pursuant to the contract executed by ACA and Donegal, ACA overpaid ROhadd by a total of $14,000. 3 'b ,'q,';,., '(1,1;", , i"i-i,,~,IF':'hlo~;~,~__. .......... ft..f_~-L .or. l III IN TIll COUll'l' 0' COJIIION PLUs 0' CUMIIRLAND COUNTY, PINNSYLVANIA ADA... COUII'I'Y ASPHALT COIIJIAIIY, CIVIL DIVISION No. 94 6021 Civil Tor. Plaintitt, v.. TYPB or PLEADING: PRAECIPB rOR ENTRY 0' APPEARANCB ItOHADD CONSTRUCTION CO~. toraerly known a. DOtIIGAI, CONSTRUCTION CORPORATION, Defendant. 'ILED ON BEHALr 0': ROHADD CONSTRUCTION CORP. formerly known ae DONEGAL CONSTRUCTION CORPORATION, DEPBNDANT COUNSEL OF RBCORD FOR THIS PARTY: Kenneth W. Lee Pa. 1.0. #50016 David Rave. Pa. 1.0. #62135 PLOWMAN, SPIEGBL , LENIS, P.e. Fir. No. 334 925 Grant BUilding Pitt.burgh, FA 15219 (412) 471-8521 .."1",' . . ......,. --- ......"...